Illustrative VDOT and DRPT Project List - 1/14/2011. Agency UPC District Locality System Description From To Amount STORMWATER MANAGEMENT

Size: px
Start display at page:

Download "Illustrative VDOT and DRPT Project List - 1/14/2011. Agency UPC District Locality System Description From To Amount STORMWATER MANAGEMENT"

Transcription

1 RTE 11 - ADD STORMWATER CONTROL & INTERSECTION OF ROUTE 11 & ROUTE INTERSECTION OF ROUTE 11 & ROUTE VDOT Bristol Abingdon Urban STORMWATER MANAGEMENT 140 (JONESBORO ROAD) 19 (PORTERFIELD HIGHWAY) $66,999 VDOT Bristol Big Stone Gap Urban SHAWNEE AVE. - BRIDGE REPAIR/REPLACEMENT OVER SOUTH FORK POWELL RIVER $27,615 VDOT Bristol Big Stone Gap Urban BIG STONE GAP - UPGRADE SIGNAL AT INTERSECTION OF RT 23/58 Int. Route 23 and Route 58 $23,478 VDOT Bristol Bland County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD ROUTE 42 END OF MAINTENANCE $69,300 VDOT Bristol Bland County Secondary RTE (FH 566) RECONSTRUCTION & REPLACE 2 BRIDGES 0.59 MILE EAST ROUTE MILES EAST ROUTE 52 $699,406 VDOT Bristol Bland County Secondary Install Guardrail Various Various $60,024 APPROACHES & BRIDGE OVER VDOT Bristol Bland County Secondary RTE BRIDGE REPLACEMENT KIMBERLING CREEK (1.50 MILES WEST ROUTE 606) $6,372 VDOT Bristol Bluefield Urban VDOT Bristol Bristol Enhancement BLUEFIELD - HOCKMAN PIKE - BRIDGE REPLACEMENT Int. Rte. 720 (Fincastle Turnpike) Int.HockmanPike&ParkviewDr.(INCLUDING CONN. WITH RTE.720) $83,268 PHASE 2 -- RENOVATION OF BRISTOL TRAIN STATION INTERIOR AND SITEWORK $116,180 VDOT Bristol Bristol Interstate I81 INTERCHANGE IMPROVEMENTS AT EXIT 7 Stage Coach Road 1,050 Feet East $275,446 VDOT New Bristol Bristol Urban IMPROVEMENT OF RT 11 CITY OF BRISTOL 4 LANES W/ RAISED MEDIAN (LEE HIGHWAY) $14,000,000 VDOT Bristol Bristol District-wide Primary RTE COALFIELDS EXPRESSWAY CORRIDOR Q $5,171,210 APPALACHIAN REGIONAL COMMISSION FUTURE APPALACHIAN LOCAL ACCESS VDOT Bristol Bristol District-wide Primary LOCAL ACCESS FUNDING PROJECT FUNDS $750,000 VDOT Bristol Buchanan County Primary New 460 Connector, Phase 1, Design Build Kentucky State Line Mile East Kentucky State LIne $9,896,120 VDOT Bristol Buchanan County Primary Route 460 Connector, Phase II mi. East of Kentucky Stateline mi. East of Kentucky Stateline $1,707,309 VDOT Bristol Buchanan County Primary RTE NEW LOCATION-Phase 2 Construction 0.6 KM SOUTH OF THE EXISTING ROUTE 460/615 INTERSECTION 0.6 KM SOUTH OF THE ROUTE 460/83 INTERESCTION $6,771,064 VDOT Bristol Buchanan County Primary RTE NEW LOCATION 0.6 KILOMETER SOUTH EXISTING ROUTES 460/ KILOMETER NORTH EXISTING ROUTES 460/83 $100,000 VDOT Bristol Buchanan County Primary RTE WIDENING-Phase 3 Construction 0.4 KILOMETER SOUTH SCL GRUNDY (AT ROYAL CITY) 0.6 KILOMETER SOUTH ROUTES 460/615 $3,205,986 VDOT Bristol Buchanan County Primary ROUTE 460 CONNECTOR PHASE I, VDOT Oversight KENTUCKY STATE LINE 460 CONNECTOR PHASE II (.88Mi East KY ST Line) $1,103,880 VDOT Bristol Buchanan County Primary RTE 83-2 LANE RECONSTRUCTION PE AND R/W ONLY IN SYP 0.23 MILE WEST ROUTE MILE EAST ROUTE 718 $60,903 VDOT Bristol Buchanan County Primary RTE 83-2 LANE RECONSTRUCTION PE AND R/W ONLY IN SYP 0.23 MILE WEST ROUTE MILE EAST ROUTE 718 $12,640,254 VDOT Bristol Buchanan County Primary RTE VDOT ALPHA/PIONEER OVERSIGHT CFX - FEDERAL WEST VIRGINIA STATE LINE ROUTE 23 $60,400 Page 1

2 0.4 KILOMETER SOUTH SCL GRUNDY AT 0.6 KILOMETER NORTH EXISTING VDOT Bristol Buchanan County Primary RTE FLOOD PROOFING - PE & RW ONLY ROYAL CITY ROUTE 460/83 INTERSECTION $11,989,949 VDOT Bristol Buchanan County Secondary Rt Reconstruct roadway for safety and improved capacity Mi. S. Rte Mi. S. Rte. 638 $490,346 VDOT Bristol Buchanan County Secondary Rt Replace Structure 6078 Intersection Route 643 $16,838 VDOT Bristol Dickenson County Primary Route 63 over Roaring Trammel Va struc mi. from Rte mi. to Rte. 626 $257,132 VDOT Bristol Dickenson County Primary DEDICATED BRIDGE FUND - REPLACE STRUCTURE #1015 ON RTE Mi. N. Int. Rte Mi. S. Int. Rte. 649 $43,969 VDOT Bristol Dickenson County Primary Route 63 over Big Fremont Va struc 1001 $16,425 VDOT Bristol Dickenson County Primary Route 80 over Prater Haysi Va struc mi. from Rte mi. to Rte. 63 $34,814 VDOT Bristol Dickenson County Secondary RTE WIDEN EXISTING ROADWAY ROUTE 637 ROUTE 83 $977,938 VDOT Bristol Dickenson County Secondary RTE BRIDGE REPLACEMENT BRIDGE OVER LICK CREEK - #6106 (0.20 MILE SOUTH ROUTE 670) $180,026 Rt Re-Align curve and construct connection VDOT Bristol Dickenson County Secondary to Route mi W route MILES W RTE 729 $26,870 VDOT Bristol Dickenson County Secondary RTE Spot Widen Curves Intersection Route 645 Wise County Line $120,266 VDOT Bristol Dickenson County Secondary Rt Spot Widen Curves Intersection of Route 663 Intersection of Route 661 $5,221 VDOT Bristol Grayson County Primary RTE 94 - BRIDGE REPLACEMENT 0.43 MILE NORTHWEST ROUTE 634 ROUTE 634 $1,245,302 VDOT Bristol Grayson County Primary Route 58 over Big Wilson Volney Va struc 1037 $157,053 VDOT Bristol Grayson County Secondary RTE RECONSTRUCT ROADWAY & IMPROVE ASPHALT SURFACE ROUTE 604 ROUTE 777 $117,138 VDOT Bristol Grayson County Secondary RTE RECONSTRUCT ROADWAY & IMPROVE ASPHALT SURFACE Int. Rt. 604 Int. Rt. 604 Old Colonial Road $44,432 VDOT Bristol Lebanon Urban TOWN OF LEBANON - REPLACE FEDERAL STR. # RTE. 19 BUS At Little Cedar Creek At Little Cedar Creek $30,453 VDOT Bristol Lee County Secondary RTE RECONSTRUCTION ROUTE 58A 0.05 miles NE of Rt. 646 Int. $343,064 VDOT Bristol Lee County Secondary DEDICATED BRIDGE FUND - REPLACE STRUC #6498 ON RTE MI N. RTE MI S. RTE 661 $298,000 VDOT Bristol Lee County Secondary Rt Substructure & Superstructure Replacement with Approaches 0.30 mi. NE Rte. 611S. $29,955 VDOT Bristol Marion Urban CHATHAM HILL ROAD BRIDGE REPLACEMENT 0.04 mi. N. Int. Rte mi. N. Int. Rte. 11 $22,929 SOUTH CHURCH ST - DRAINAGE ONLY VDOT Bristol Marion Urban PROJECT MAIN STREET SCL MARION $20,432 VDOT Bristol Marion Urban TOWN OF MARION - BAUGHMAN AVENUE BRIDGE REPLACEMENT BAUGHMAN AVENUE OVER MIDDLE FORK HOLSTON RIVER $15,551 Page 2

3 VDOT Bristol Norton Urban Hawthorne Drive Signal & Safety Improvements Route 58 Alt. Walmart Drive $28,632 VDOT Bristol Richlands Urban BUS RT 460 FRONT ST BRIDGE & APPROACHES OVER CLINCH RIVER INTERSECTION W RTE 460 BYPASS MILE EAST OF INTERSECTION W RTE 460 BYPASS $41,641 VDOT Bristol Russell County Secondary RTE APPROACHES & BRIDGE REPLACEMENT OVER CLINCH RIVER MILE NORTH ROUTE MILE NORTH ROUTE 640 $73,130 VDOT Bristol Russell County Secondary RTE RECONSTRUCT EXISTING HARD SURFACED ROAD. PE & RW ROUTE 82 ROUTE 740 $167,567 VDOT Bristol Saltville Urban ALIGN. IMPROVEMENTS, GRADE & DRAIN - Palmer Ave. Saltville Intersection with Route 91 Intersection with Old Quarry Road $21,198 VDOT Bristol Scott County Primary RTE 72 - CONSTRUCT 2 LANES ON NEW LOCATION - PE & RW ONLY KILOMETER SOUTH ECL WEBER CITY KILOMETER NORTH ROUTE 71 $476,236 VDOT Bristol Scott County Primary RTE 58 - BRIDGE REPLACEMENT & APPROACHES 0.15 mi. south route mi. north route 689 $165,251 VDOT Bristol Scott County Primary Route 58 over Roberts Creek 0.27 mi. to Rte mi. to Rte. 859 $32,627 VDOT 293 Bristol Scott County Secondary RTE RECONSTRUCTION ROUTE 713 ROUTE 867 WEST $54,597 VDOT Bristol Scott County Secondary RTE BRIDGE REPLACEMENT APPROACHES & BRIDGE OVER BIG MOCCASIN CREEK (0.10 MILE EAST ROUTE 891) $114,519 VDOT Bristol Scott County Secondary RTE IMPROVE SIGHT DISTANCE AT INTERSECTION Mi. West of Route Mi. East Route 824 $27,452 VDOT Bristol Scott County Secondary RTE REPLACE BRIDGE OVER POSSUM CREEK AT INTERSECTION OF ROUTE 640 $16,570 VDOT Bristol Smyth County Primary Rte. 11 over NS Railway Mi. S. Int. Rte Mi. N. Int. Rte. 683 $717,045 VDOT Bristol Smyth County Primary Lee Highway (Rt. 11) over Norfolk Southern RR Va struct number mi. from Wash. Co. Line $227,009 VDOT Bristol Smyth County Primary Lee Highway (Rt. 11) over NS Railway Va struct number mi. From Rte mi. to I-81 $44,935 VDOT Bristol Smyth County Secondary RTE RECONSTRUCT EXISTING ROADWAY PE ONLY IN SYP MILES SOUTH SCL MARION SOUTH CORPORATE LIMITS MARION $201,243 VDOT Bristol Smyth County Secondary Route 670 over S Fork Holston River Va stuc mi. w. Rte. 601w mi. w. Rte. 601w $57,688 VDOT Bristol Smyth County Secondary Rt Bridge Replacement 0.10 mile west route mile west route 700 $14,172 RTE 16 - PROVIDE 4 LANES WITH CURB & VDOT Bristol Tazewell Urban GUTTER MAIN STREET ROUTE 460 $39,668 VDOT Bristol Tazewell Urban E Riverside Clinch River Va struc mi. from Rte mi. to Rte. 19 $121,287 VDOT Bristol Tazewell County Primary DEDICATED BRIDGE FUND - REPLACE STRUCTURE #1054 ON RTE MI E. SMYTH CO. LINE MI E. SMYTH C0 LINE $300,612 VDOT Bristol Tazewell County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD 0.90 MILE EAST ROUTE MILES EAST ROUTE 810 $634,125 VDOT Bristol Tazewell County Secondary Rt Reconstruct existing roadway Intersection of 102/ Mi. W of Int 102/696 $255,814 Page 3

4 RTE APPROACHES & BRIDGE VDOT Bristol Tazewell County Secondary REPLACEMENT OVER LITTLE RIVER 0.71 MILE NORTH ROUTE MILE NORTH ROUTE 609 $120,630 VDOT Bristol Washington County Interstate I-81 AT EXIT 14 RAMP MODIFICATIONS Exit 14 Exit 14 $11,450,000 VDOT Bristol Washington County Primary RT 58-PARALLEL LN-CORRIDOR DEV - ABINGDON TO DAMASCUS 0.3 KILOMETER EAST ROUTE 638 EAST 0.61 KILOMETER EAST OF ROUTE 708 (RHEA VALLEY) $20,167,071 VDOT Bristol Washington County Primary Rt Lane raised median w/sidewalks and bicycle lanes - PHASE I NCL BRISTOL INT. ROUTE F-310 (EXIT 10) $250,170 VDOT Bristol Washington County Secondary RTE 664-RURAL RUSTIC-GRADE,DRAIN SURFACE TREAT NON-HARD SURF 1.0 MILE EAST ROUTE MILES EAST ROUTE 674 $26,053 VDOT Bristol Washington County Secondary RTE SPOT WIDEN,GRADE,DRAIN,SURFACE TREAT NON- HARD SURF ROUTE 672 ROUTE 670 $468,955 VDOT Bristol Washington County Secondary DEDICATED BRIDGE FUND -REPLACE STRUC #6108 ON RTE MI FROM RTE MI TO RTE 664 $994,105 VDOT Bristol Washington County Secondary RTE SPOT IMPROVEMENTS 1.00 Mile South Route 704 Route 704 $260,214 VDOT Bristol Washington County Secondary RTE RECONSTRUCTION INT. ROUTE 802 INT. ROUTE 622 $162,122 VDOT Bristol Washington County Secondary RTE 747 over Tumbling Creek Va struc mi. from Rte mi. to End of Rte. 747 $159,656 VDOT Bristol Washington County Secondary Rt Bridge Replacement.08 mile W Int 625e.09 mile w Int 625e $65,286 VDOT Bristol Wise Urban RTE 23 - PROVIDE CONTINUOUS LEFT TURN LANE ROUTE 794 (HAMILTON STREET) KILOMETER WEST CHERRY STREET $1,910,911 VDOT Bristol Wise Urban RTE 23 - PROVIDE CONTINUOUS LEFT TURN LANE ROUTE 794 (HAMILTON STREET) KILOMETER WEST CHERRY STREET $30,438 VDOT Bristol Wise County Primary RTE 121 CFX West - Pound Connector US Route miles east US Route 23 $100,000 VDOT Bristol Wise County Primary Rt. 23 Kent Junction Rd over Railroad Va struc mi. E. Rte mi. E. Rte. 621 $193,600 VDOT 9527 Bristol Wise County Secondary RTE RECONSTRUCTION - PE ONLY IN SYP 0.10 MILE EAST ROUTE MILE EAST ROUTE 797 (2.346 MILES EAST ROUTE 632) $154,872 VDOT Bristol Wise County Secondary RTE WIDEN TO A 3-LANE URBAN DESIGN Int Route 23 Int Bus Route 23 $106,363 APPROACHES & BRIDGE OVER POUND VDOT Bristol Wise County Secondary RTE BRIDGE REPLACEMENT RIVER $17,560 VDOT Bristol Wythe County Interstate I-81 Corridor Improvement Study Tier 2 I-77/I- 81 Overlap From Exit 72 (I-77) near WYTHEVILLE To Exit 81 (I-77) near WYTHEVILLE $130,351 VDOT Bristol Wythe County Interstate Extend Off Ramp - I81 - Northbound and Southbound - Exit 77 Exit 77 Exit 77 $4,804 VDOT Bristol Wythe County Secondary RTE RECONSTRUCT AND SURFACE TREAT ROADWAY ROUTE 707 ROUTE 602 $1,157,072 VDOT Bristol Wythe County Secondary RR BRIDGE ON PEPPERS FERRY RD RTE MI. E. Rte MI. E. Rte. 712 $132,964 VDOT Bristol Wythe County Secondary RTE RECONSTRUCTION ROUTE 602 ROUTE 646 $1,406 Page 4

5 RTE RECONSTRUCT AND SURFACE VDOT Bristol Wythe County Secondary TREAT ROADWAY ROUTE 707 ROUTE 602 $2,885 VDOT Bristol Wythe County Secondary RTE APPROACHES & DRAINAGE STRUCTURE OVER DRY RUN CREEK ROUTE 21 ROUTE 707 $48,906 VDOT Bristol Wythe County Secondary Rt 749 Cedar Springs Rd over Cripple Creek Va struc mi. to Rte mi. to Rte. 672 $32,800 VDOT Bristol Wythe County Secondary Rt. 610 Peppers Ferry Rd over Millers Creek Va struc mi to Route mi to Route 712 $25,000 VDOT Bristol Wytheville Urban CONNECTOR ROAD - 2 LANES WITH CURB & GUTTER INT PEPPERS FERRY ROAD LITHIA ROAD $226,738 VDOT Culpeper Albemarle County Secondary RT BRIDGE REPLACE DICKERSON RD OVER NORTH FORK RIVANNA RIVE BRIDGES AND APPROACHES $4,112,548 VDOT Culpeper Albemarle County Secondary RTE WIDEN & IMPROVE ALIGNMENT Mi. West Rte Mi. West Rte.240 $652,561 VDOT Culpeper Albemarle County Secondary RTE BRIDGE & APPROACHES OVER NORTH FORK RIVANNA Mi. W of Rte Mi. W. of Rte. 641 $424,622 VDOT Culpeper Albemarle County Secondary RTE BRIDGE & APPROACHES OVER CSX RAILROAD (0.09 MILE SOUTH OF ROUTE 738) STRUCTURE #6084 $450,279 VDOT Culpeper Albemarle County Secondary Rte. 637 Over Ivy Creek, VA Str MI. S. RTE MI. S. RTE. 786 $80,000 VDOT Culpeper Albemarle County Secondary Bridge Replacement, Rte 616 over Buckingham Branch RR Rte. 616 over Buckingham Branch RR $58,982 VDOT Culpeper Charlottesville Urban RTE. 29/250 BYPASS INTERCHANGE IMP (HYDRAULIC RD - BARRACKS) 0.42 mi south of N.C.L. Charlottesville Intersection at Hydraulic Road $500,000 VDOT Culpeper Charlottesville Urban JEFFERSON PARK AVENUE - BRIDGE REPLACEMENT APPROACHES & BRIDGE OVER NORFOLK-SOUTHERN RAILROAD $564,840 VDOT Culpeper Charlottesville Urban CITY OF CHARLOTTESVILLE - FORMULA CITY PAYMENT $3,286,623 VDOT Culpeper Culpeper Urban RTE TOWN OF CULPEPER RTE. 15/29 BUSINESS FAIRVIEW ROAD $89,086 VDOT Culpeper Culpeper Urban RTE WIDEN FROM 2 LANES TO 5 LANES FAIRVIEW ROAD NCL TOWN OF CULPEPER $8,000 VDOT 2459 Culpeper Culpeper County Primary RT 15 BUSINESS PARALLEL LANE ROUTE MILES EAST OF ROUTE 665 $24,977,987 VDOT Culpeper Culpeper County Primary RTE 3 - PARALLEL LANE (EAST OF STEVENSBURG TO LIGNUM) 4.1 MILES EAST RTE MILES WEST OF CULPEPER/ORANGE COUNTY LINE $36,131,916 VDOT Culpeper Culpeper County Primary RT 29 INTERCHANGE AT RT 666 AT RT 15/29 AND RT 666 AT ROUTE 15/29 AND ROUTE 666 $33,308,647 VDOT Culpeper Culpeper County Primary RTE 15 - WIDEN FROM 2 TO 4 LANES 0.10 MILE SOUTH NCL CULPEPER ROUTE 666 $133,585 VDOT Culpeper Culpeper County Primary RTE WIDEN TO 4 LANES NCL TOWN OF CULPEPER 0.86MI NORTH NCL TOWN OF CULPEPER $592,484 VDOT Culpeper Culpeper County Secondary RTE WIDEN & SURFACE TREAT NON- HARDSURFACED ROADWAY Route 1170 ROUTE 626 $53,050 VDOT Culpeper Culpeper County Secondary RTE BRIDGE REPLACEMENT MI. S. MOUNTAIN RUN MI. N. MOUNTAIN RUN $299,050 VDOT Culpeper Culpeper County Urban RTE WIDEN FROM 2 LANES TO 5 LANES FAIRVIEW ROAD NCL TOWN OF CULPEPER $4,801,818 Page 5

6 Enhancement - Culpeper Scenic and Historic VDOT Culpeper Culpeper District-wide Enhancement Acquisition RW Acquisition RW Acquisition $960,000 VDOT Culpeper Fauquier County Primary RTE 15 - CONSTRUCT INTERCHANGE AT ROUTE MILES SOUTH INT. ROUTE MILES SOUTH INT. ROUTE 687 $1,259, MILE SOUTH ROUTE 818 (OLD MILE SOUTH ROUTE 818 (OLD VDOT Culpeper Fauquier County Primary RTE 28 - REPLACE BRIDGE OVER CEDAR RUN CATLETT ROAD) CATLETT ROAD) $8,000 RTE INT 15/29 & 4-LN 0.17 MILE WEST FAUQUIER/PRINCE VDOT Culpeper Fauquier County Primary WIDENING ROUTE 29 WILLIAM COUNTY LINE $151,808 VDOT Culpeper Fauquier County Secondary RTE APPROACHES & BRIDGE REPLACEMENT OVER TINPOT RUN 0.37 MI. W. RTE MI. E. RTE $1,183,416 VDOT Culpeper Fauquier County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARD SURFACED RD. Rte. 670 (Old Auburn Road) 0.39 Miles S. Rte. 670 (Old Auburn Road) $106,739 VDOT Culpeper Fauquier County Secondary RTE APPROACHES & BRIDGE OVER SUMMERDUCK RUN 0.05 MILE EAST OF ROUTE MILE EAST OF ROUTE 615 $152,615 RTE TURN LANES AT ROUTE 674 SOUTH MILE WEST ROUTE 674 (ATLEE MILE EAST ROUTE 674 (ATLEE VDOT Culpeper Fauquier County Secondary & ROUTE 1401 ROAD) ROAD) $138,893 VDOT Culpeper Fauquier County Secondary RTE TURN LANES & DRAINAGE STRUCTURE AT MILL RUN MILE EAST ROUTE 674(ATLEE ROAD) MILE EAST ROUTE 674(ATLEE ROAD) $42,000 VDOT Culpeper Fauquier County Secondary ROUTE BRIDGE OVER THUMB RUN - STRUCTURE # MI S. THUMB RUN 0.15 MI.N. THUMB RUN $90,722 VDOT Culpeper Fauquier County Secondary RTE RECONSTRUCTION ROUTE 29 ROUTE 676 $10,525 VDOT Culpeper Fluvanna County Primary RTE 6 - BRIDGE REPLACEMENT OVER HARDWARE RIVER AT HARDWARE RIVER $345,140 VDOT Culpeper Fluvanna County Primary RTE 6 - BRIDGE REPLACEMENT OVER RIVANNA RIVER AT RIVANNA RIVER $249,761 VDOT Culpeper Fluvanna County Secondary RTE INTERSECTION IMPROVEMENT 0.12 MI. S. RTE. INT. RTE. 600/ MI. N. RTE. INT. RTE. 600/53 $168,798 VDOT Culpeper Fluvanna County Secondary RTE BRIDGE REPLACEMENT APPROACHES & DRAINAGE STRUCTURE AT HOLMAN CREEK $14,724 VDOT Culpeper Greene County Miscellaneous NATIONAL PARK SERVICE-APPALACHIAN TRAIL HIGH TOP MOUNTAIN LAND ACQUISITION FY07 SAFETEA-LU EARMARK PROJECT $58,090 VDOT Culpeper Greene County Secondary RTE 630 ROSEBROOK ROAD (RURAL RUSTIC ROAD) RTE 810 RTE 631 $120,000 VDOT Culpeper Greene County Secondary RTE 642 SIMMS ROAD (RURAL RUSTIC ROAD) 0.23Mi E of Rte 667 Middle River Road Route 637 $153,706 RTE SPOT IMPROVEMENTS (PE & RW VDOT Culpeper Greene County Secondary ONLY IN SSYP) ROUTE 29 ORANGE COUNTY LINE $125,309 VDOT Culpeper Greene County Secondary ROUTE WIDEN AND SURFACE TREAT, BRIDGE OVER BLUE RUN ROUTE MILE NORTH ROUTE 623 $8,966 VDOT Culpeper Louisa County Primary I-64 ZIONS CROSSROADS INTERCHANGE IMPROVEMENT AT ROUTE 15 $6,250,000 VDOT Culpeper Louisa County Secondary RTE APPROACHES & REPLACE BRIDGE OVER NORTHEAST CREEK MILE WEST OF NORTHEAST CREEK MILE EAST OF NORTHEAST CREEK $155,094 VDOT Culpeper Louisa County Secondary RTE IMPROVEMENTS ROUTE 613 ROUTE 620 $82,203 Page 6

7 ROUTE BRIDGE REHAB OVER MULATTO VDOT Culpeper Madison County Primary RUN - STRUC # MI. S. ROUTE MI. N. ROUTE 651 $243,003 VDOT Culpeper Madison County Secondary RTE WIDEN AND SURFACE TREATMENT ROUTE 624 END OF MAINTENANCE $588,034 VDOT Culpeper Madison County Secondary RTE WIDEN & SURFACE TREAT ROUTE 655 END OF MAINTENANCE $100,000 VDOT Culpeper Madison County Secondary RTE INTERSECTION IMPROVEMENTS AT ROUTE miles east of route miles west of route 706 $100,726 VDOT Culpeper Madison County Secondary Rt Replace structure #6014 with prestressed slabs 0.9 miles west of int. rte miles east on int. rte. 29 $14,652 VDOT Culpeper Orange Urban MAY-FRAY AVE. EXTENSION FROM WASHINGTON ST.TO WOODMARK ST. WASHINGTON STREET WOODMARK STREET $39,365 VDOT Culpeper Orange County Secondary RT TRENCH WIDEN, PAVE, AND GRADE SHOULDERS AND DITCHES ROUTE 0612 ROUTE 0629 $167,158 VDOT Culpeper Orange County Secondary RT ASPHALT CONC. OVERLAY, SHLD. STONE,PAVE.MARKING RT. 20 RT. 630 $50,644 VDOT Culpeper Orange County Secondary Bridge deck rehabilitation on Rt Structure #6051 and Rt #6114. Rte. 611 overmine Run Rte. 629 over Terry Run $15,984 VDOT Culpeper Rappahannock County Primary RTE BRIDGE REPLACEMENT OVER THORTON RIVER $265,111 VDOT Culpeper Rappahannock County Primary ROUTE BRIDGE REHAB OVER WILSON BRANCH - STRUC # MILE WARRENTON CL 3.45 MILE ROUTE 211 $73,078 VDOT Culpeper Rappahannock County Secondary RTE APPROACHES AND BRIDGE OVER BATTLE RUN 0.09 MILES SOUTH BATTLE RUN 0.13 MILES NORTH BATTLE RUN $211,106 VDOT Culpeper Rappahannock County Secondary RTE BRIDGE REPLACEMENT APPROACHES & BRIDGE OVER BIG INDIAN RUN $100,792 VDOT Culpeper Statewide Miscellaneous JOURNEY THROUGH HALLOWED GROUND GETTYSBURG PA Charlottesville VA $116,180 VDOT Culpeper Warrenton Urban WARRENTON - INTERSECTION IMPROVEMENT 0.10 MI. S. BROADVIEW AVE. (RTE. 17/29/211) 0.02 MI. N. LEE HIGHWAY (RTE. 29/211) $96,237 VDOT Culpeper Warrenton Urban Improve Intersection of Walker and Blackwell INTERSECTION WALKER AND BLACKWELL $44,349 VDOT Culpeper Warrenton Urban RTE 17 - INTERSECTION IMPROVEMENTS AT WINCHESTER STREET & OLD BROADVIEW AVENUE $22,162 VDOT District-wide Statewide Interstate HEARTLAND CORRIDOR PROJECT IN VA,WV & OHIO $4,260,000 VDOT District-wide Statewide Miscellaneous PUBLIC-PRIVATE TRANSPORTATION INITIATIVES STATEWIDE $9,179,071 VDOT District-wide Statewide Primary ROUTE 460 IMPROVEMENTS $580,898 RTE 95 - INTRCHANGE IMPROVEMENT MILES SO OF ROUTE 207 (CARMEL MILES NO OF ROUTE 207 VDOT Fredericksburg Caroline County Interstate RELOCATION OF ROUTE 652 CHURCH) (CARMEL CHURCH) $220,152 VDOT Fredericksburg Caroline County Primary RTE WBL BRIDGE REPLACEMENT OVER CSX BRIDGE OVER CSX RAILROAD $112,725 VDOT Fredericksburg Caroline County Secondary RTE RECONSTRUCTION 0.19 KILOMETER EAST OF EAST INTERSECTION ROUTE 601 KING WILLIAM COUNTY LINE $33,392 Page 7

8 VDOT Fredericksburg Caroline County Secondary RTE RECONSTRUCTION OF ROADWAY ROUTE 95 ROUTE 1 $153,846 RTE BRIDGE REPLACEMENT & APPR VDOT Fredericksburg Caroline County Secondary OVER MARACOSSIC CREEK (0.50 MILE EAST OF ROUTE 643) STRUCTURE #6032 $112,506 VDOT Fredericksburg Caroline County Secondary RTE BRIDGE REPLACEMENT BRIDGE OVER BOOT SWAMP $73,200 VDOT Fredericksburg Caroline County Secondary RTE BRIDGE REPLACEMENT & APPR. OVER SOUTH RIVER (0.30 MILE NORTH OF ROUTE 743) STRUCTURE #6027 $25,944 VDOT Fredericksburg Essex County Secondary Rt RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED RD RTE 646 DEAD END AT SHELLFIELD $23,383 VDOT Fredericksburg Essex County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD RTE 606 Dead ENd $67,678 VDOT Fredericksburg Essex County Secondary RTE RECONSTRUCT & REPLACE BRIDGE OVER OCCUPACIA CK KILOMETERS WEST ROUTE 17 SOUTH ROUTE 17 SOUTH $59,903 VDOT Fredericksburg Essex County Secondary RTE RECONSTRUCTION 0.10 Miles west of Intersection Route Miles east of Intersection Route 671 $33,190 VDOT Fredericksburg Fredericksburg Interstate NEW I-95 ACCESS (RAPPAHANOC PARKWAY) Rappahannock River Route 3 $15,000,000 FALL HILL AVENUE PHASE I BRIDGE OVER I- VDOT Fredericksburg Fredericksburg Urban 95 Carl D. Silver Parkway Jefferson Davis Highway (Route 1) $35,768, MILE NORTH ROUTE 618 (RIVER MILE NORTH ROUTE 618 (RIVER VDOT Fredericksburg Fredericksburg Urban BRAGG ROAD/FALL HILL AVENUE - WIDENING ROAD) ROAD) $35,886 VDOT Fredericksburg Fredericksburg Urban Fall Hill Avenue Phase I Carl D. Silver Parkway Jefferson Davis Highway (Route 1) $150,264 VDOT Fredericksburg Fredericksburg Urban Jeff Davis Bypass over Rte 3 Va struc 1803 Rte. 3 $90,800 VDOT Fredericksburg Fredericksburg District-wide Interstate I-95 - PE STUDIES (HOT LANES) ROUTE 17 SOUTH 14TH STREET BRIDGE $1,497,935 I-95/395 Preliminary Engineering Studies (HOT VDOT Fredericksburg Fredericksburg District-wide Interstate LANES) $335,283 VDOT Fredericksburg Fredericksburg District-wide Primary RTE BRIDGE REPLACEMENT MILE WEST OF TIDE MILL STREAM MILE EAST OF TIDE MILL STREAM $1,201,070 RTE 17 - WIDENING & INSTALL RAISED VDOT Fredericksburg Gloucester County Primary CONCRETE MEDIAN MILE NORTH YORK COUNTY LINE MILE NORTH YORK COUNTY LINE $93,757 VDOT Fredericksburg Gloucester County Primary RTE 17 - BRIDGE REPLACEMENT OVER FOX MILL RUN $118,419 VDOT Fredericksburg Gloucester County Primary RTE 17 - CONSTRUCT 2ND SOUTHBOUND LEFT TURN LANE. CONSTRUCT RECEIVER LANE & RIGHT TURN LANE ON RTE AT ROUTE 216 $29,324 VDOT Fredericksburg Gloucester County Secondary RTE SURFACE TREAT NON- HARDSURFACED ROAD ROUTE 613 ROUTE 606 $314,192 VDOT Fredericksburg Gloucester County Secondary BRIDGE REPLACEMENT RTE. 662 OVER FOX CREEK (FED ID 8552) $250,000 VDOT Fredericksburg Gloucester County Secondary RTE RECONSTRUCTION OF ROADWAY Mi. W Int. Route Mi. W Int. Route 17 (NBL) $183,500 RTE RECONSTRUCTION AND MINOR VDOT 7909 Fredericksburg Gloucester County Secondary WIDENING ROUTE 616 ROUTE 17 $142,528 Page 8

9 VDOT Fredericksburg Gloucester County Secondary Bridge Replacement Rte. 602 over Burkes Road $33,706 VDOT Fredericksburg King & Queen County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARD SURFACE RD ROUTE 721 END STATE MAINTENANCE $32,162 VDOT Fredericksburg King & Queen County Secondary RTE RURAL RUSTIC (SURFACE TREAT NON-HARDSURFACED ROAD) ROUTE MI N ESM $20,855 VDOT 2239 Fredericksburg King & Queen County Secondary RTE BRIDGE REPLACEMENT APPROACHES AND BRIDGE OVER GARNETT'S CREEK $45,041 VDOT Fredericksburg King & Queen County Secondary RTE RECONSTRUCTION OF ROADWAY 0.85 MILE NORTH ROUTE MILE NORTH ROUTE 636 $44,885 VDOT Fredericksburg King George County Primary RTE Construct Turn Lanes Mi. West Int. Routes 218 & Mi. East Int. Routes 218 & 624 $273,893 VDOT 7931 Fredericksburg King George County Secondary RTE RECONSTRUCTION ROUTE 3 ROUTE 625 $84,230 VDOT Fredericksburg King George County Secondary RTE RECONSTRUCTION ROUTE 301 ROUTE 650 $55,966 VDOT Fredericksburg King George County Secondary FUTURE FEDERAL BRIDGE $11,257 VDOT Fredericksburg King William County Secondary RTE RECONSTRUCTION ROUTE MILE SOUTH ROUTE 615 $111,375 VDOT Fredericksburg King William County Secondary RTE BRIDGE & APPROACHES OVER HERRING CREEK (0.10 MILE SOUTH OF ROUTE 607) STRUCTURE #6002 $63,530 VDOT Fredericksburg Lancaster County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARD SURFACE RD ROUTE 643 HADLEA DRIVE $23,397 VDOT Fredericksburg Lancaster County Secondary RTE RECONSTRUCTION KILOMETER NORTH ROUTE 611(RELOCATED) KILOMETER SOUTH ROUTE 611(RELOCATED) $94,794 VDOT Fredericksburg Lancaster County Secondary RTE RECONSTRUCTION & BRIDGE OVER BROWNS CREEK 0.10 MILES WEST OF BROWNS CREEK 0.10 MILES EAST OF BROWNS CREEK $6,610 VDOT Fredericksburg Mathews County Primary RTE 14 - CONSTRUCT TURN LANES Mi. S. of Int. Rte. 14 & Mi. N. of Int. Rte. 14 & 198 $188,612 VDOT Fredericksburg Mathews County Primary RTE 14 - CONSTRUCT TURN LANES AT ROUTE 617 $15,178 VDOT Fredericksburg Mathews County Primary RTE 14 - CONTRUCT TURN LANES AT ROUTE 660 $36,416 RTE RURAL RUSTIC (SURFACE TREAT VDOT Fredericksburg Mathews County Secondary NON-HARDSURFACED ROAD) ROUTE 660 ESM $44,817 VDOT Fredericksburg Mathews County Secondary RTE RECONSTRUCTION Mi. N. int. Rte Mi. S. Int. Rte. 654 $80,033 VDOT Fredericksburg Middlesex County Primary RTE 33 - LENGTHEN RIGHT TURN LANE AND MEDIAN AT ROUTE 620 $50,297 VDOT Fredericksburg Middlesex County Secondary RTE RURAL RUSTIC (SURFACE TREAT NON-HARDSURFACED ROAD) ROUTE 17 ESM $61,570 VDOT 2257 Fredericksburg Middlesex County Secondary RTE RECONSTRUCTION ROUTE 3 ROUTE 33 $137,746 Rt SURFACE TREAT NON HARD 0.30 Mile South of Route 646 (End of State VDOT Fredericksburg Northumberland County Secondary SURFACE ROAD Route 646 Maint) $39,600 Page 9

10 VDOT Fredericksburg Northumberland County Secondary Rte 604 -Align Intersection & Reconstruct Intersection of Route 604 and Route 360 $110,110 VDOT Fredericksburg Richmond County Secondary RTE. 634 OVER CAT POINT CREEK Cat Point Creek Cat Point Creek $699,961 RTE RECONSTRUCTION(PE & PARTIAL VDOT 3609 Fredericksburg Richmond County Secondary R/W ONLY IN SYP) MID ROUTE MILE EAST ROUTE 639 $74,172 VDOT Fredericksburg Richmond County Secondary Rte. 634 over Cat Point Creek Cat Point Creek Cat Point Creek $6,348 VDOT Fredericksburg Spotsylvania County Primary RTE 208-SPOTSYLVANIA COURTHOUSE BYPASS- 4 LNS NEW LOCATION 1.2 KILOMETERS EAST PO RIVER 1.6 KILOMETERS WEST NI RIVER $550,945 VDOT Fredericksburg Spotsylvania County Primary ARRA-C Spotsylvania 208 Courthouse Bypass - Phase II 0.5 km West of the Ta River 1.2 km East of the Po River $202,613 VDOT Fredericksburg Spotsylvania County Secondary RTE RECONSTRUCTION ROUTE MILE NORTH ROUTE 618 $492,898 VDOT Fredericksburg Spotsylvania County Secondary RTE RECONSTRUCTION 0.22 Mile West of Route 1 (Jefferson Davis Hwy) Route 1 (Jefferson Davis Hwy) $250,157 VDOT Fredericksburg Spotsylvania County Secondary Rt Build New 2-Lane Bridge and Approaches over Massaponax Creek 0.45 Miles South of Route Miles South of Route 208 $53,160 VDOT Fredericksburg Stafford County Interstate I-95 RELOCATION OF INTERCHANGE AT Rt. 630 AT ROUTE 630 $14,033,000 VDOT Fredericksburg Stafford County Primary RT 17 RECONSTRUCTION McLANE DRIVE STAFFORD LAKES PARKWAY $33,393,369 VDOT Fredericksburg Stafford County Primary RTE 17 - RECONSTRUCTION McLANE DRIVE STAFFORD LAKES PARKWAY $773,440 VDOT Fredericksburg Stafford County Primary RTE 1 - BRIDGE REPLACEMENT & APPROACHES OVER AQUIA CREEK BRIDGE OVER AQUIA CREEK $666,945 VDOT Fredericksburg Stafford County Primary INTERSECTION IMPROVEMENTS (Routes 1, 17 and 218) Intersection Route Mi. east of Int. Route 1 $54,697 VDOT 4632 Fredericksburg Stafford County Secondary RTE WIDEN TO 4 LANES ROUTE MILE WEST OF ROUTE 628 $21,760,868 VDOT Fredericksburg Stafford County Secondary RTE RECONSTRUCTION MILE WEST ROUTE MILE EAST ROUTE 643 $633,504 RTE BRIDGE OVER CSX RAILROAD VDOT Fredericksburg Stafford County Secondary (STRUCTURE #6040) Route Mi. East of CSX Railroad $83,777 VDOT 4632 Fredericksburg Stafford County Secondary RTE WIDEN TO 4 LANES ROUTE MILE WEST OF ROUTE 628 $88,337 VDOT Fredericksburg Westmoreland County Primary RTE BRIDGE REPLACEMENT AT MATTOX CREEK 0.5 MILE SOUTH OF MATTOX CREEK 0.5 MILE NORTH OF MATTOX CREEK $63,811 VDOT Fredericksburg Westmoreland County Secondary RTE BRIDGE REPLACEMENT BRIDGE AND APPROACHES OVER NOMINI CREEK $482,325 VDOT 1896 Hampton Roads Accomack County Primary RTE REPLACE 1 BRIDGE ON NEW LOCATION APPROACHES & BRIDGE OVER BLACK NARROWS, CHINCOTEAGUE AND LEWIS CREEK CHANNELS $5,099,158 VDOT 8301 Hampton Roads Accomack County Secondary RTE RECONSTRUCTION ROUTE 789, ONLEY EAST CORPORATE LIMITS ONLEY $850,090 RTE RURAL RUSTIC ROAD (SURFACE VDOT Hampton Roads Accomack County Secondary TREAT NON-HARDSURFACE) ROUTE 617 ROUTE 178 $201,123 VDOT 8312 Hampton Roads Accomack County Secondary RTE RECONSTRUCTION ROUTE 13 ROUTE 679 $277,138 Page 10

11 VDOT Hampton Roads Accomack County Secondary Future Bridge Project $18,497 RTE 64 - WIDENING TO 6 LANES WITH HOV VDOT Hampton Roads Chesapeake Interstate LANES 1.17 MILES EAST BATTLEFIELD BLVD 0.87 MILE WEST SOUTHBOUND I-464 $366,724 VDOT Hampton Roads Chesapeake Interstate RTE 64 - Harbour North Sound Wall Ramp terminal at Rte 190 East side of high rise 166 $86,174 VDOT Hampton Roads Chesapeake Interstate ROUTE 64 - VARIABLE MESSAGE SIGNS ROUTE 464 ROUTE 17 $126,305 VDOT Hampton Roads Chesapeake Primary RTE 17 - WIDEN FROM 2 TO 4 LANES & REPLACE RIVER XING BRIDGE 0.75 Mile South of Cedar Road 0.52 Mile North of Great Bridge Blvd $3,129,436 VDOT Hampton Roads Chesapeake Urban Dominion Boulevard 0.75 Mile South of Cedar Road 0.52 Mile North of Great Bridge Blvd $150,000,000 VDOT 1904 Hampton Roads Chesapeake Urban RTE 13 - BRIDGE REPLACEMENT MILE WEST OF GILMERTON BRIDGE MILE EAST OF GILMERTON BRIDGE $11,607,577 VDOT Hampton Roads Chincoteague Urban Realign the intersection of Chicken City Road and Ridge Road miles south of Church Street miles north of Church Street $40,468 VDOT Hampton Roads Emporia Urban Improvement of the Halifax Street Bridge 150 feet north of Knox Street 400 feet north of Knox Street $11,264 VDOT Hampton Roads Emporia Urban East Atlantic Street Reconstruction US 58 West of Georgia Pacific Entrance $44,326 VDOT Hampton Roads Franklin Urban HUNTERDALE ROAD RESTORATION AND SHOULDER IMPROVEMENTS ROUTE 58 (CLAY STREET) ANDREWS AVENUE $78,335 VDOT Hampton Roads Greensville County Primary RTE BRIDGE REPLACEMENT OVER CSX RAILROAD 0.30 MILE NORTH OF CSX RAILROAD 0.30 MILE SOUTH OF CSX RAILROAD $90,235 VDOT Hampton Roads Greensville County Secondary RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD ROUTE 603 BRUNSWICK COUNTY LINE $424,321 VDOT Hampton Roads Greensville County Secondary RTE MINOR WIDENING MI. SOUTH OF INT. RTE. 693 (BOWEN RD.) MI. SOUTH OF INT. RTE. 693 (BOWEN RD.) $98,327 VDOT Hampton Roads Greensville County Secondary Rte 633 Reconstruction Intersection Route Miles North of Intersection Route 627 $59,236 VDOT Hampton Roads Greensville County Secondary RTE BRIDGE REPLACEMENT APPROACHES & DRAINAGE STRUCTURE OVER OTTERDAM SWAMP $8,990 ROUTE 199(INCLUDES NEWPORT VDOT Hampton Roads Hampton Interstate RTE 64 - TRAFFIC MANAGEMENT SYSTEM MAGRUDER BOULEVARD NEWS, HAMPTON & YORK COUNTY) $95,767 VDOT Hampton Roads Hampton Urban Bridge street over Salters Creek VA Str Bridge street over Salters Creek VA Str Bridge street over Salters Creek Str 8009 $98,882 VDOT Hampton Roads Hampton Urban CITY OF HAMPTON - FORMULA CITY PAYMENT $429,157 VDOT Hampton Roads Hampton Roads District-wide Interstate RTE 64 - CONSTRUCT NEW INTERCHANGE CHESAPEAKE/VIRGINIA BEACH AT CITY LINE ROAD $1,168,008 VDOT Hampton Roads Hampton Roads District-wide Interstate RTE TRAFFIC MANAGEMENT SYSTEM NORTH END MONITOR-MERRIMAC TUNNEL ROUTE 264 (BOWERS HILL) $631 VDOT Hampton Roads Hampton Roads District-wide Interstate RTE TRAFFIC MANGEMENT SYSTEM ROUTE 64 ROUTE 264 $733 Transportation improvements to Historic VDOT Hampton Roads Hampton Roads District-wide Miscellaneous Jamestown 2007 $587,886 Page 11

12 VDOT Hampton Roads Hampton Roads District-wide Miscellaneous Infastructure improvements for Jamestown 2007 $46,328 RTE 58 - PPTA PROJECT DEVELOPMENT & VDOT Hampton Roads Hampton Roads District-wide Primary MANAGEMENT (DT/MT/MLK) MIDTOWN TUNNEL CORRIDOR $5,717,654 VDOT Hampton Roads Hampton Roads District-wide Primary DT/MT/MLK PPTA - (Midtown Tunnel and MLK) $2,000,000 VDOT Hampton Roads Hampton Roads District-wide Primary In-plan Utility Work on Route 105 Widening KILOMETER EAST OF ROUTE KILOMETER WEST OF ROUTE 17 $40,000 RTE 58 - PPTA PROJECT DEVELOPMENT & INTERSTATE LONDON VDOT Hampton Roads Hampton Roads District-wide Primary MANAGEMENT (DT/MT/MLK) MARTIN LUTHER KING EXTENSION BOULEVARD $31,207 VDOT Hampton Roads Hampton Roads District-wide Primary RTE LANE REVERSAL RTE. 58 Lane Reversal $600,000 VDOT 4707 Hampton Roads Isle of Wight County Secondary RTE RECONSTRUCTION 0.4 MILE WEST ROUTE 652 WEST ROUTE 652 $15,733 VDOT Hampton Roads Isle of Wight County Secondary RTE RECONSTRUCTION MI. W. INT. ROUTE MI. E. INT. ROUTE 637 $184,339 VDOT Hampton Roads Isle of Wight County Secondary Rte 637 Over Great Swamp Branch VA str Rte 637 Over Great Swamp Branch VA str Rte 637 Over Great Swamp Branch Str 6045 $99,089 VDOT Hampton Roads James City County Secondary RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) 0.56 MILE WEST ROUTE MILE WEST ROUTE 1040 $107,633 VDOT Hampton Roads James City County Secondary MOORETOWN RD BIKEWAY Airport Rd Rain Tree Way $733, MILE SOUTH OF INTERSECTION VDOT Hampton Roads James City County Secondary RTE RECONSTRUCT TO 4 LANES ROUTE MILES SOUTH OF ROUTE 747 $457,393 VDOT Hampton Roads James City County Secondary Future Bridge Project $26,326 MARINER'S MUSEUM "USS MONITOR"-PHASE I VDOT Hampton Roads Newport News Enhancement - LANDSCAPING/PARKING Route 60 Mariners Museum/USS Monitor Center $116,180 VDOT Hampton Roads Newport News Urban RTE 60-6 LANES KM SOUTH OF ROUTE KM NORTH OF NETTLES DRIVE $623,827 VDOT Hampton Roads Newport News Urban MIDDLEGROUND BLVD - 4-LANE DIVIDED WITH CURB,GUTTER,SIDEWALK MI. EAST OF JEFFERSON AVENUE MI. WEST OF WARWICK BOULEVARD $1,574,110 VDOT Hampton Roads Newport News Urban RTE 60 - ROADWAY & DRAINAGE WORK FOR WIDENING WARWICK BLVD INTERSECTION OF NUTMEG QUARTER INTERSECTION OF NETTLES DRIVE $2,238,648 VDOT Hampton Roads Newport News Urban Washington Ave over NNS and DD RWY Va struc Mi to Rte Mi 41st Street $96,943 VDOT Hampton Roads Norfolk Interstate R000 - I-564 INTERMODAL CONNECTOR I-564 NORFOLK NAVAL BASE/N.I.T. $6,949,978 VDOT Hampton Roads Norfolk Interstate I- 64/NORVIEW AVENUE - RAMP IMPROVEMENT MI. WEST OF NORVIEW AVENUE MI. EAST OF NORVIEW AVENUE $230,573 VDOT Hampton Roads Norfolk Interstate I Install type B, class VI pavement line markings on I-state.01 Mi E of Downtown Tunnel WCL City of VA Beach $44,729 VDOT Hampton Roads Norfolk Public Transportation DOUBLE STACK CLEARANCE OF TUNNELS ON THE NORFOLK WESTERN MAI $722,734 VDOT Hampton Roads Norfolk Urban RTE RECONSTRUCTION KILOMETER NORTH OF ROGERS AVENUE KILOMETER SOUTH OF "B" AVENUE $844,296 Page 12

13 VDOT Hampton Roads Norfolk Urban RTE 58 - WIDEN TO 6 LANES KM West of JETT STREET KM East of BRIAR HILL ROAD $262,991 VDOT Hampton Roads Norfolk Urban Robin Hood Rd & Military Hwy Phase 1, link w/ UPC 1765 & mi. North of Northampton Blvd mi North of Rte I-64 $203,923 VDOT Hampton Roads Norfolk Urban Debt Reimbursement( ) for Norfolk Light Rail Transit Citywide $67,344 VDOT 8342 Hampton Roads Northampton County Secondary RTE RECONSTRUCTION 0.23 MILE EAST OF INTERSECTION OF ROUTE MILE WEST OF INTERSECTION ROUTE 600 $107,359 VDOT Hampton Roads Northampton County Secondary FUTURE STATE MATCH - HES/RR SAFETY VARIOUS LOCATIONS IN COUNTY $7,524 VDOT Hampton Roads Poquoson Urban RTE CITY OF POQUOSON - PHASE I ALPHUS STREET SCL POQUOSON $28,105 VDOT Hampton Roads Portsmouth Primary RTE RAIL RELOCATION RAIL RELOCATION ALONG ROUTE 164 CORRIDOR $282,333 VDOT Hampton Roads Portsmouth Urban RTE LANE MILES EAST OF FREDERICK BOULEVARD CONSTITUTION AVENUE $198,528 VDOT Hampton Roads Smithfield Enhancement ARRAC-Smithfield Downtown Revitalization- Streetscaping Ph. V Luter Drive 1,300 feet east of Jericho Road $60,482 VDOT Hampton Roads Southampton County Primary RTE 58 - CONSTRUCT INTERCHANGE ROUTE 58 BUSINESS INTERCHANGE (EAST END COURTLAND BYPASS) $20,223,194 VDOT Hampton Roads Southampton County Primary RTE 35 - BRIDGE REPLACEMENT IN SOUTHAMPTON COUNTY $300,000 VDOT Hampton Roads Southampton County Secondary RTE RECONSTRUCTION 2.5 MILES EAST ECL COURTLAND ROUTE 641 $1,853,171 VDOT Hampton Roads Southampton County Secondary RTE 659 OVER FLAT SWAMP VA STR $590,000 VDOT Hampton Roads Southampton County Secondary RTE LANES WITH TURN LANE ROUTE 650 ROUTE 687 $151,849 VDOT Hampton Roads Southampton County Secondary RTE RECONSTRUCTION 2.5 MILES EAST ECL COURTLAND ROUTE 641 $15,685 VDOT Hampton Roads Suffolk Urban RTE RECONSTRUCTION ROUTE 1007 END OF STATE MAINTENANCE $30,844 VDOT Hampton Roads Suffolk Urban RTE WIDEN TO 4 LANES 0.37 Mile E. of Shoulder Hill Road (Rte. 626) Mile E. of Shoulder Hill Road (Rte. 626) $237,613 VDOT Hampton Roads Suffolk Urban RTE RECONSTRUCTION (PE & RW ONLY IN SSYP) ROUTE 337 ROUTE 17 $280,964 VDOT Hampton Roads Surry County Primary RTE 31 - WIDEN & RESTRIPE PAVEMENT MI SOUTH OF FERRY PIER FERRY PIER $116,180 VDOT Hampton Roads Surry County Secondary RTE Widen pavement and address geometric deficiencies ROUTE 618 DARK SWAMP $60,291 VDOT Hampton Roads Surry County Secondary Rt Loafers Oak Rd over Cypress Swamp Va struc mi to Int Rte mi to Int Rte 616 $96,374 VDOT Hampton Roads Sussex County Secondary RT STOKES RD OVER MAGUS MILL POND VA STRUC 6054 $317,694 VDOT Hampton Roads Sussex County Secondary ROUTE 699- SURFACE TREAT NON-HARD SURFACE ROAD Route 630 Route 698 $150,000 VDOT Hampton Roads Sussex County Secondary ROUTE PAVE NON-HARD SURFACE ROAD Route 602 Prince George CL $131,325 Page 13

14 ROUTE PAVE NON-HARD SURFACE VDOT Hampton Roads Sussex County Secondary ROAD Route 605 Southampton CL $68,688 VDOT Hampton Roads Sussex County Secondary ROUTE PAVE NON-HARD SURFACE ROAD Route 610 Route 609 $158,532 VDOT Hampton Roads Sussex County Secondary ROUTE 626 RECONSTRUCTION 300' SOUTH OF THE SOUTHERN CONNECTION WITH ROUTE ' NORTH OF THE NORTHERN CONNECTION WITH ROUTE 636 $109,658 VDOT Hampton Roads Sussex County Secondary Rt Stokes Rd over Magus Mill Pond Va struc 6054 $11,914 VDOT Hampton Roads Virginia Beach Interstate ARRA-C VA Beach 264 Lynnhaven Interchange Improvements/Ramps 0.33 Mi. east of Lynnhaven Parkway (Rte 414) along I Mi. south of I-264 along London Bridge Road (Rte 279) $1,194,467 VDOT Hampton Roads Virginia Beach Interstate RTE INTERCHANGE IMPROVEMENT MILE EAST OF WBL I MILE EAST OF WITCHDUCK RD $28,551 VDOT N/A Hampton Roads Virginia Beach Miscellaneous Norfolk Southern Corridor ROW $20,000,000 RT 58 WIDEN TO 6 LAND DIVIDED FACILITY KILOMETER WEST OF FIRST KILOMETER EAST OF BIRDNECK VDOT Hampton Roads Virginia Beach Urban COLONIAL ROAD ROAD $66,495,301 RTE 58 - WIDEN TO 6 LANES PHASE III VDOT Hampton Roads Virginia Beach Urban 0.32 MILES EAST OF BIRDNECK ROAD MILES WEST OF PACIFIC AVENUE $19,563,540 VDOT Hampton Roads Virginia Beach Urban LYNNHAVEN PARKWAY - WIDENING TO 4 LANES Miles East of Centerville Turnpike Miles West of Indian River Road $17,489,275 HOLLAND ROAD - UPGRADE TO 4 LANES VDOT Hampton Roads Virginia Beach Urban MILE NORTH OF DAM NECK ROAD MILE SOUTH OF NIMMO PARKWAY $25,894,198 VDOT Hampton Roads Virginia Beach Urban ELBOW RD - UPGRADE TO 4 LANES & EXTENSION INDIAN RIVER ROAD 0.5 MILE WEST OF PRINCESS ANN ROAD $41,440,418 VDOT Hampton Roads Virginia Beach Urban INDIAN RIVER ROAD - UPGRADE TO 4 LANES LYNNHAVEN PARKWAY ELBOW ROAD $58,876,881 VDOT Hampton Roads Virginia Beach Urban WITCH DUCK ROAD - 6 LANES I-264 VIRGINIA BEACH BLVD $29,249,483 VDOT Hampton Roads Virginia Beach Urban LESNER BRIDGE REPLACEMENT VA beach VA beach $78,750,000 VDOT Hampton Roads Virginia Beach Urban BIRDNECK ROAD - WIDEN FROM 2 TO 4 LANES MILE EAST OF GENERAL BOOTH BOULEVARD MILE NORTH OF SOUTHERN BOULEVARD $824,358 VDOT Hampton Roads Virginia Beach Urban CITY OF VA BEACH - FORMULA CITY PAYMENT $239,648 VDOT Hampton Roads Williamsburg Urban Install Traffic Signal - Int. Waltz Farm Dr./Richmond Rd. Intersection Richmond Rd. & Waltz Farm Dr. $22,892 VDOT Hampton Roads Williamsburg Urban Install Traffic Signal - Int. York St./ Quarterpath Rd. Intersection of York Street & Quarterpath Road $5,511 VDOT Hampton Roads York County Primary RTE 17 - WIDEN FROM 4 TO 6 LANES MILE SOUTH ROUTE 620 (LAKESIDE DRIVE) MILE NORTH ROUTE 620 (LAKESIDE DRIVE) $19,140,246 VDOT Hampton Roads York County Primary RTE 17 - WIDEN FROM 4 TO 6 LANES MILE SOUTH ROUTE 620 (LAKESIDE DRIVE) MILE NORTH ROUTE 620 (LAKESIDE DRIVE) $355,762 VDOT Hampton Roads York County Secondary RTE CONSTRUCT LTLS AND RTLS AT VARIOUS LOCATIONS KILOMETER EAST INTERSECTION ROUTE KILOMETER SOUTH INTERSECTION ROUTE 621 $31,841 VDOT Hampton Roads York County Secondary RTE CONSTRUCT LTLS AND RTLS AT VARIOUS LOCATIONS KILOMETER EAST INTERSECTION ROUTE KILOMETER SOUTH INTERSECTION ROUTE 621 $78,200 VDOT Hampton Roads York County Secondary Future Bridge Project $25,879 Page 14

15 VDOT Lynchburg Altavista Urban DEVELOP PITTSYLVANIA AVE. TO 4 LANES MAIN STREET ALTAVISTA SCL $37,904 VDOT Lynchburg Amherst County Primary ROUTE REPLACE BRIDGE AND APPROACHES OVER JAMES RIVER 0.00 Miles to Amherst County Line 0.00 Miles to Bedford County Line $10,328,794 VDOT Lynchburg Amherst County Primary RTE 29 NBL D-B REPLACE BRIDGE & APPROACH OVER TYE RIVER MILES SOUTH OF AMHERST/NELSON COUNTY LINE MILES NORTH OF AMHERST/NELSON COUNTY LINE $964,584 VDOT Lynchburg Amherst County Primary RTE 60 - BRIDGE REPLACEMENT & APPROACHES OVER BUFFALO RIVER 0.05 Miles North Rte Miles South Rte. 635 $787,905 VDOT Lynchburg Amherst County Primary Route Replace Bridge and Approaches over James River 0.00 Miles to Amherst County Line 0.00 Miles to Bedford County Line $205,355 VDOT Lynchburg Amherst County Primary RTE 29 - NBL BRIDGE REPLACEMENT & APPROACHES OVER BUFFALO RV 1.16 MILES SOUTH ROUTE MILES SOUTH ROUTE 151 $187,147 VDOT 6555 Lynchburg Amherst County Secondary RTE RECONSTRUCTION & BRIDGE OVER GRAHAM CR (#6048) MILE EAST ROUTE MILE EAST ROUTE 675 SOUTH $76,233 VDOT Lynchburg Amherst County Secondary RTE Bridge Relocation and Approaches RTE MI. N. INT. RTE. 643 RTE MI. N. INT. RTE. 635 $204,527 VDOT Lynchburg Appomattox County Secondary RTE RECONSTRUCTION & HARDSURFACING ROUTE 712 DEAD END $120,147 VDOT Lynchburg Appomattox County Secondary ROUTE MINOR WIDENING/ STRENGTHENING/ ASPHALT OVERLAY ROUTE MILE NORTH ROUTE 752 $254,823 VDOT Lynchburg Appomattox County Secondary RTE BRIDGE REPLACEMENT - STR. #6036 OVER BIG CUB CREEK 1.62 MILE SOUTH ROUTE MILE SOUTH ROUTE 630 $10,400 VDOT Lynchburg Buckingham County Primary Route 20 - Replace Bridge and Approches over Slate River 0.79 Miles from Route Miles from Route 617 $412,863 VDOT Lynchburg Buckingham County Primary RTE 15 - IMPROVE CORRIDOR MI. S. CONN. RTE. 669 RT MI. N. CONN. RTE. 617 RT $116,180 VDOT Lynchburg Buckingham County Secondary RTE RURAL RUSTIC ROUTE MW ROUTE 646 $1,315,120 VDOT Lynchburg Buckingham County Secondary Rt RELOCATE CONNECTION TO ROUTE 20. Route miles east of route 20. $62,876 VDOT Lynchburg Buckingham County Secondary RECONSTRUCT APPROX. 0.5 MILE OF VA. RTE 20 AT RTE. 631 INTER 0.25 miles south of route miles north of route 631 $1,585,600 VDOT Lynchburg Buckingham County Secondary Route 629 Reconstruction Rte. 60 Dillwyn Town Limits $136,837 VDOT Lynchburg Campbell County Secondary BRIDGE REPLACEMENT, RTE 643 OVER FALLING RIVER 0.60 Miles from Route Miles from Route 642 $995,773 VDOT 5542 Lynchburg Campbell County Secondary Rt 622 RECONSTRUCTION ROUTE 683 ROUTE 29 $7,901,193 VDOT 5543 Lynchburg Campbell County Secondary RTE RECONSTRUCTION ROUTE 711 ROUTE 682 $335,716 RTE BRIDGE REPL. & APPR. OVER NS VDOT Lynchburg Campbell County Secondary RAILWAY 1.64 MILES TO ROUTE MILE TO ROUTE 626 $130,752 VDOT 5542 Lynchburg Campbell County Secondary RTE RECONSTRUCTION ROUTE 683 ROUTE 29 $53,974 VDOT Lynchburg Charlotte County Primary Rte 40 Over Louse Creek Va Str Miles to Route Miles to Route 617 $130,000 RTE BRIDGE & APPROACHES OVER CUB VDOT Lynchburg Charlotte County Secondary CREEK 0.07 Mi. W. Cub Creek 0.07 Mi. E. Cub Creek $121,222 Page 15

16 VDOT 5240 Lynchburg Cumberland County Secondary RTE RECONSTRUCTION BUCKINGHAM COUNTY LINE ROUTE 690 $77,722 VDOT Lynchburg Cumberland County Secondary Rt Replace Existing Bridge and Approaches Replace Existing Bride # 6001 HTRIS $7,693 VDOT Lynchburg Danville Urban RTE 41 - WIDEN TO 4 LANES UNDIVIDED, CURB, GUTTER & SIDEWALK KM SOUTH ROUTE 29 (PINEY FOREST ROAD) NCL DANVILLE $229,640 VDOT Lynchburg Danville Urban PIEDMONT DRIVE - INCLUDING PARALLEL ROBERTSON BRIDGE INT. of MEMORIAL DRIVE 0.32 Mi. N. of INT. of MEMORIAL DRIVE $810,314 VDOT Lynchburg Danville Urban ARRA-C DANVILLE PIEDMONT DRIVE REPLACE ROBERTSON BRIDGE Int. of Memorial Drive 0.32 Mi. N. of Int. of Memorial Drive $153,773 VDOT Lynchburg Danville Urban Piedmont Drive Landscaping / Mitigation Project Intersection of Memorial Miles North of intersection of Memorial Drive $19,390 VDOT Lynchburg Farmville Urban RTE 15 - BRIDGE REPLACEMENT BRIDGE OVER BUFFALO CREEK $24,119 VDOT Lynchburg Farmville Urban Bic/Ped Bridge over Buffalo Cr. Parallel to Third St. Br. Bridge over Buffalo Creek $39,978 VDOT Lynchburg Halifax County Primary RTE BRIDGE REPLACEMENT-BANISTER RIVER(STR# 1024) Miles East Rte Miles East Rte 501 $706,600 VDOT Lynchburg Halifax County Primary Construct Temp. Detour for Rte. 360 over Banister River MI. W. Banister River MI. E. Banister River $137,413 VDOT Lynchburg Halifax County Primary ROUTE 49 - BRIDGE REPL & APPR OVER AARON'S CREEK AT HALIFAX/MECKLENBURG COUNTY LINE $214,734 VDOT Lynchburg Halifax County Secondary RELOCATE RTE Mi. North of Route Mi. South of Route 501 $268,997 VDOT Lynchburg Lynchburg Primary RTE 460 AND RTE 29 ROUTE 501 CAMPBELL AVE POSTON ST $171,450 VDOT Lynchburg Lynchburg Primary RTE 460 AND RTE 29 NO PLAN PROJECT ROUTE 501 CAMPBELL AVE ROUTE 29 MONACAN PARKWAY $101,036 VDOT Lynchburg Lynchburg Urban WIDEN GREENVIEW DRIVE FROM 2 TO 4 LANES Hermitage Road 0.22 mi. South of Leesville Road $9,339,150 VDOT Lynchburg Lynchburg Urban CITY OF LYNCHBURG - FORMULA CITY PAYMENT $619,165 VDOT Lynchburg Nelson County Secondary RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) ROUTE 151 END OF MAINTENANCE $55,000 VDOT Lynchburg Nelson County Secondary RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) MILE NORTH ROUTE MILE NORTH ROUTE 699 $535,075 VDOT Lynchburg Nelson County Secondary RTE 6 - ADD TURN LANE FOR RTE MILE SOUTH RTE MILE NORTH RTE 634 $80,071 VDOT Lynchburg Nelson County Secondary RTE 6 - ADD TURN LANE FOR RTE MILE WEST RTE MILE EAST RTE 639 $41,039 VDOT Lynchburg Nelson County Secondary Future Federal Formula STP Funds $12,384 VDOT Lynchburg Nelson County Secondary RTE RECONSTRUCTION ROUTE 630 ROUTE 804 $3,490 VDOT Lynchburg Pittsylvania County Primary RTE FRANKLIN TURNPIKE CONNECTOR MILE WEST ROUTE MILE WEST ROUTE 360 $1,425,539 Page 16

Using a Statewide Model to Analyze Truck Traffic for the I-81 Corridor Study in Virginia

Using a Statewide Model to Analyze Truck Traffic for the I-81 Corridor Study in Virginia Using a Statewide Model to Analyze Truck Traffic for the I-81 Corridor Study in Virginia Presented by Paul Agnello, VDOT Central Office TRB Annual Meeting, January 25, 2006 I-81 Study Area I-81 Study Area

More information

Appendix 11-B 24-HOUR RAINFALL DEPTH DATA FOR VIRGINIA

Appendix 11-B 24-HOUR RAINFALL DEPTH DATA FOR VIRGINIA Appendix 11-B 24-HOUR RAINFALL DEPTH DATA FOR VIRGINIA Table of Contents TABLES Table 11-B.1. NRCS Implementation of NOAA s ATLAS 14 Rainfall Data for Virginia 11-B-2 FIGURES Figure 11-B-1. NRCS Rainfall

More information

HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN

HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN Prepared By: HRTPO Staff June 16, 2011 2 COMMITTED PROGRAMMED PROJECTS List of and Studies Committed are fully

More information

Approved Revenue Sharing Projects for De-Allocation "Attachment A"

Approved Revenue Sharing Projects for De-Allocation Attachment A Approved Revenue Sharing s for De-Allocation "Attachment A" # Bristol Abingdon (Town of) U000-40-R69 05675 Sidewalk (new construction) $355,50.00 04-5 Russell County Abingdon (Town of) summary: Saltville

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning

More information

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build 1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian

More information

SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS

SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS AS OF 11/20/2018 Regional Standings Region Standings WESTERN 1 691 303 739 22 281 NORTHERN 2 2341 921 2434 138 783 EASTERN

More information

SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS AS OF 4/10/2019

SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS AS OF 4/10/2019 SONS OF THE AMERICAN LEGION DETACHMENT OF VIRGINIA REGION AND DISTRICT STANDINGS AS OF 4/10/2019 Regional Standings Region Standings NORTHERN 1 2341 2189 2434 346 1841 EASTERN 2 1293 1070 1344 162 908

More information

MAP 1.

MAP 1. MAP 1. MAP 2. MAP 3. MAP 4a. MAP 4b. MAP 4c. MAP 4d. MAP 5a. MAP 5b. MAP 5c. MAP 5d. MAP 5e. MAP 6a. MAP 6b. MAP 6c. MAP 7a. MAP 7b. MAP 7c. MAP 7d. Appendix Example SPSS Syntax: 1989. TITLE "RABIES DATA

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 9/20/2018

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 9/20/2018 THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS ZONE Standings Region Standings EASTERN 1 671 2736 2871 NORTHERN 2 511 92 3141 WESTERN 3 187 1160 1219 24.52% 17.08% 16.12%

More information

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 9/13/2018

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 9/13/2018 THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS ZONE Standings Region Standings EASTERN 1 645 2736 2871 WESTERN 2 175 1160 1219 NORTHERN 3 412 2992 3141 23.57% 15.09% 13.77%

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

research report Safety Belt and Motorcycle Helmet Use in Virginia: The Summer 2007 Update Virginia Transportation Research Council

research report Safety Belt and Motorcycle Helmet Use in Virginia: The Summer 2007 Update Virginia Transportation Research Council Final Report VTRC 08-R6 Virginia Transportation Research Council research report Safety Belt and Motorcycle Helmet Use in Virginia: The Summer 2007 Update http://www.virginiadot.org/vtrc/main/online_reports/pdf/08-r6.pdf

More information

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 1/5/2018

THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS AS OF 1/5/2018 THE AMERICAN LEGION AUXILIARY DEPARTMENT OF VIRGINIA ZONE AND DISTRICT STANDINGS ZONE Standings Region Standings EASTERN 1 1680 30 2822 NORTHERN 2 1820 3097 3185 WESTERN 3 694 1242 04 61.54% 58.77% 55.88%

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Park & Ride Lot Investment Strategies

Park & Ride Lot Investment Strategies Park & Ride Lot Investment Strategies Hampton Roads Transportation Technical Advisory Committee May 7, 2014 Carl E. Jackson, AICP Transportation Planning Specialist Hampton Roads District VDOT Park & Ride

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Racing to Charlotte 9/11/2013

Racing to Charlotte 9/11/2013 District Standings 9th District 10th District 14th District 13th District 7th District 15th District 5th District 12th District 8th District 16th District 11th District 6th District 17th District 4th District

More information

Project No. CSC Contract No. Title: Safety Belt and Motorcycle Helmet Use In Virginia: The Summer 2005 Update

Project No. CSC Contract No. Title: Safety Belt and Motorcycle Helmet Use In Virginia: The Summer 2005 Update Standard Title Page - Report on State Project Report No. Report Date No. Pages Type Report: Final VTRC 06-R4 September 2005 22 Period Covered: July 1, 2004, to June 30, 2005 Title: Safety Belt and Motorcycle

More information

Swing For The Fences

Swing For The Fences September 21, 2016 Department is in 10 th Place Nationally Swing For The Fences 90 Beaverdam 100% 13 th District 58 Dublin 97.561% 7 th District 113 Princess Anne 96.296% 2 nd District Top Four Districts:

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Pit Crew Chiefs 151,165,2003,45,260,62,1991,264,123,314,99,232,217,137,1, 128,34,93,160,201,41,245. District Standings. 13th District.

Pit Crew Chiefs 151,165,2003,45,260,62,1991,264,123,314,99,232,217,137,1, 128,34,93,160,201,41,245. District Standings. 13th District. District Standings 13th District 5th District 9th District 7th District 10th District 16th District 17th District 8th District 11th District 14th District 12th District 6th District 3rd District 15thDistrict

More information

Impact of Virginia's Gubernatorial Personal Property Tax Relief Plans Vary Widely by Locality

Impact of Virginia's Gubernatorial Personal Property Tax Relief Plans Vary Widely by Locality Sinc e 193 7 TAX FOUNDATION October 1997, No. 73 Impact of Virginia's Gubernatorial Personal Property Tax Relief Plans Vary Widely by Locality By Patrick Fleenor Economis t Tax Foundation As part of their

More information

FINAL REPORT SAFETY BELT AND MOTORCYCLE HELMET USE IN VIRGINIA: THE DECEMBER 2003 UPDATE. Jami L. Kennedy Research Associate

FINAL REPORT SAFETY BELT AND MOTORCYCLE HELMET USE IN VIRGINIA: THE DECEMBER 2003 UPDATE. Jami L. Kennedy Research Associate FINAL REPORT SAFETY BELT AND MOTORCYCLE HELMET USE IN VIRGINIA: THE DECEMBER 2003 UPDATE Jami L. Kennedy Research Associate Cheryl W. Lynn Senior Research Scientist Virginia Transportation Research Council

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

CLIMATOLOGICAL DATA VIRGINIA. SEPTEMBER 2012 VOLUME 122 NUMBER 09 ISSN GHCND Ver: 3.00-upd

CLIMATOLOGICAL DATA VIRGINIA. SEPTEMBER 2012 VOLUME 122 NUMBER 09 ISSN GHCND Ver: 3.00-upd CLIMATOLOGICAL DATA SEPTEMBER 2012 VOLUME 122 NUMBER 09 ISSN 0364-5630 GHCND Ver: 3.00-upd-2013012406 TEMPERATURE AND PRECIPITATION EXTREMES HIGHEST TEMPERATURE 99 SEPTEMBER 01 WALKERTON 2 NW LOWEST TEMPERATURE

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS

UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS 04/25/2018 Pit Bosses (District Standings) SJP13 th 16 th 15 h 10 th 12 th 9 th 5 th 17 th 2 nd 1 st 3 rd 11 th 14 th 4 th 8 th 7 th 6 th What

More information

Wet Accident Reduction Program (WARP) in Virginia. Bipad Saha, P.E. Pavement Design Engineer

Wet Accident Reduction Program (WARP) in Virginia. Bipad Saha, P.E. Pavement Design Engineer Wet Accident Reduction Program (WARP) in Virginia Bipad Saha, P.E. Pavement Design Engineer Presentation Outline Introduction to WARP Background WARP Outline 2008 WARP Results Historical Data and Results

More information

UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS 07/03/2018

UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS 07/03/2018 UPPING the ANTE JACKPOT WINNINGS FROM RENO TO MINNEAPOLIS Pit Bosses (District Standings) SJP16 th SJP13 th 10 th 15 th 2 nd 17 th 12 th 9 th 3 rd 5 th 1 st 11 th 8 th 4 th 14 th 7 th 6 th 07/03/2018 Our

More information

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018 Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

2005 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 20

2005 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 20 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 20 City of Colonial Heights City of Richmond Prepared By In Cooperation With U.S. Department

More information

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017 CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 17 From the District Engineer: In 17, the Culpeper District successfully delivered several large projects that have been years in the making. In Culpeper

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129

2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 129 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 99

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 99 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 99 City of Poquoson Prepared By In Cooperation With U.S. Department of Transportation Federal

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

Regional Transportation Priority Projects 2009 Richmond Area MPO

Regional Transportation Priority Projects 2009 Richmond Area MPO Regional Transportation Priority Projects 2009 9211 Forest Hill Ave, Suite 200 Richmond, Virginia, 23235 Phone: (804) 323-2033 Fax: (804) 323-2025 www.richmondregional.org Ashland Charles City Chesterfield

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) LEVY COUNTY Highways: State Highways 4135251 D2-LEVY COUNTY TRAFFIC SIGNAL

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation September 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown

More information

Regional Transportation Priority Projects 2009 Richmond Area MPO

Regional Transportation Priority Projects 2009 Richmond Area MPO Regional Transportation Priority Projects 2009 9211 Forest Hill Ave, Suite 200 Richmond, Virginia, 23235 Phone: (804) 323-2033 Fax: (804) 323-2025 www.richmondregional.org Ashland Charles City Chesterfield

More information

SECONDARY ROAD CONSTRUCTION PROGRAM

SECONDARY ROAD CONSTRUCTION PROGRAM Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system

More information

CLIMATOLOGICAL DATA VIRGINIA. MARCH 2015 VOLUME 125 NUMBER 03 ISSN GHCND Ver: 3.21-upd TEMPERATURE AND PRECIPITATION EXTREMES

CLIMATOLOGICAL DATA VIRGINIA. MARCH 2015 VOLUME 125 NUMBER 03 ISSN GHCND Ver: 3.21-upd TEMPERATURE AND PRECIPITATION EXTREMES CLIMATOLOGICAL DATA MARCH 2015 VOLUME 125 NUMBER 03 ISSN 0364-5630 GHCND Ver: 3.21-upd-2015070705 TEMPERATURE AND PRECIPITATION EXTREMES HIGHEST TEMPERATURE 83 MARCH 16 DANVILLE REGIONAL AP LOWEST TEMPERATURE

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

Directions to The MITRE Corporation

Directions to The MITRE Corporation MITRE-1 Building (H) 7525 Colshire Drive McLean, VA 22102-7539 Phone: (703) 983-6000 McLean Metro Station Old Meadow Dr. The MITRE Corporation - McLean Campus Colshire Meadow Drive Rt. 123 (Dolley Madison

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions RECOMMENDATIONS 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 A Call to Action 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan

More information

DRAFT DRAFT. Agenda Item #8. Presented to the Hampton Roads Transportation Planning Organization Board March 19, 2015

DRAFT DRAFT. Agenda Item #8. Presented to the Hampton Roads Transportation Planning Organization Board March 19, 2015 Agenda Item #8 Presented to the Hampton Roads Transportation Planning Organization Board March 19, 2015 Dale M. Stith, AICP, GISP Principal Transportation Planner Hampton Roads Transportation Planning

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

TRAFFIC ENGINEERING DIVISION MEMORANDUM

TRAFFIC ENGINEERING DIVISION MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: Signs SPECIFIC SUBJECT: Overhead Street Name Signs (OSNS) DIRECTED TO: District Location & Design Engineers

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 10 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A Page 1 of 5 PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A FY 2017 TOTAL BUDGETED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Local Option Gas Taxes Total 49,679,000 49,679,000 49,679,000

More information

CLIMATOLOGICAL DATA VIRGINIA. JANUARY 2015 VOLUME 125 NUMBER 01 ISSN GHCND Ver: 3.20-upd TEMPERATURE AND PRECIPITATION EXTREMES

CLIMATOLOGICAL DATA VIRGINIA. JANUARY 2015 VOLUME 125 NUMBER 01 ISSN GHCND Ver: 3.20-upd TEMPERATURE AND PRECIPITATION EXTREMES CLIMATOLOGICAL DATA JANUARY 2015 VOLUME 125 NUMBER 01 ISSN 0364-5630 GHCND Ver: 3.20-upd-2015051305 TEMPERATURE AND PRECIPITATION EXTREMES HIGHEST TEMPERATURE 75 JANUARY 04 NORFOLK INTL AP LOWEST TEMPERATURE

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Brent Spence Bridge Design Exceptions - Alternative I

Brent Spence Bridge Design Exceptions - Alternative I s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight

More information

Regional Transportation. Priority Projects. Richmond Area Metropolitan Planning Organization

Regional Transportation. Priority Projects. Richmond Area Metropolitan Planning Organization Regional Transportation Priority Projects 2011 Richmond Area Metropolitan Planning Organization Regional Transportation Priority Projects September 8, 2011 This list of Regional Transportation Priority

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

East Kings Highway and Roberts Avenue Speed Hump Analysis

East Kings Highway and Roberts Avenue Speed Hump Analysis East Kings Highway and Roberts Avenue Speed Hump Analysis BOROUGH OF HADDONFIELD, CAMDEN COUNTY, NEW JERSEY 5/18/2018 Prepared By: Remington & Vernick Engineers 232 EAST KINGS HIGHWAY, HADDONFIELD, NEW

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 00

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 00 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 00 Arlington County City of Alexandria Prepared By In Cooperation With U.S. Department of Transportation

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Local Public Agency Obligated Projects SFY 2015

Local Public Agency Obligated Projects SFY 2015 Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

Local Public Agency Obligated Projects SFY 2018

Local Public Agency Obligated Projects SFY 2018 Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 133

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 133 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 133 Information in this report is included in Report

More information

Elizabeth River Crossings Study June 2008

Elizabeth River Crossings Study June 2008 Elizabeth River Crossings Study June 2008 T08-07 HAMPTON ROADS METROPOLITAN PLANNING ORGANIZATION Chesapeake Poquoson * Clifton E. Hayes, Jr. * Charles W. Burgess, Jr. Gloucester County Portsmouth * Lane

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2017 2022 TRANSPORTATION IMPROVEMENT PROGRAM 24 11 B 1 23 14 25 10 13 A 28 6 12 27 19 5 18 17 21 15 16 C 9 8 7 26 29 16 22 4 6 2 8 20 MAP I.D. A B C PROJECTS ADDED TO THE TIP PROJECT NAME Bay View-Edison

More information

2013 AMERICA S 9/11 RIDE FRIDAY, AUGUST 16

2013 AMERICA S 9/11 RIDE FRIDAY, AUGUST 16 FRIDAY, AUGUST 16 Start: Highland HD, Somerset, Pennsylvania DEPARTS 7:15am Right turn out of Highland HD onto Center Street Left turn onto Stoystown Road (Rt 281 North) Right turn onto Pompey Hill Road

More information

CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE

CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE CONTACT INFORMATION AND DIRECTIONS TO SCHOOLS ON UPPER MERION MIDDLE SCHOOL S ATHLETIC SCHEDULE Arcola Middle School (Methacton School District) 4001 Eagleville Road Norristown, PA 19403 (610) 489-5000

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation October 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown By...

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

VDOT Unused Facilities

VDOT Unused Facilities VDOT Unused Facilities Appropriation Act Item 457 K.1 (2010) Report to the Chairmen of House Appropriations and Senate Finance Committees Virginia Department of Transportation 1401 East Broad Street Richmond,

More information

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011 South Dakota Transportation Improvement Program Economic Stimulus Package (2009-2013 AND 2010-2014 STIPs) Report Date 09/26/2011 Item 1.00 ES 0903(78)142 000M Jackson 32.2 I90E EBL, Fm E of the SD73 N

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2016 2021 TRANSPORTATION IMPROVEMENT PROGRAM 25 21 12 1 24 C B 26 13 29 30 3 6 19 7 27 14 18 17 15 16 28 22 11 10 9 A 7 D E 4 23 5 2 8 20 PROJECTS ON THE TIP PROJECTS ADDED TO THE TIP MAP I.D. PROJECT

More information

December 12, Dear Secretary Foxx:

December 12, Dear Secretary Foxx: Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December

More information

2040 Metropolitan Transportation Plan -- Table XVII-1

2040 Metropolitan Transportation Plan -- Table XVII-1 C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital

More information

2016 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates

2016 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 133 Information in this report is included in Report

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information