Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011

Size: px
Start display at page:

Download "Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011"

Transcription

1 Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011

2 Concepts of SC CW 3GeV, 1mA Linac H - gun RFQ MEBT SSR0 SSR1 SSR2 β=0.6 β=0.9 ILC RT (~15m) 325 MHz MeV 650 MHz GeV 1.3 GHz 2-3 GeV Section Freq, MHz Energy(MeV) Cav/mag/CM Type SSR0 ( G =0.11) /26/1 SSR, solenoid SSR1 ( G =0.22) /18/ 2 SSR, solenoid SSR2 ( G =0.42) /24/ 4 SSR, solenoid LB 650 ( G =0.61) /21/ 7 5-cell elliptical, doublet HB 650 ( G =0.9) / 12/ 12 5-cell elliptical, doublet ILC 1.3 ( G =1.0) / 8/ 8 9-cell elliptical, quad Initial configuration. Now changed to reduce gradient in HE650 N.Solyak, Project-X Linac design FNAL PrX Retreat, Nov.2,

3 Project X optics layout (version 3.7.4) TTC WG-2 - March 2, 2011 Page 3

4 SSR cryomodule configurations (version 3.7.4) (18 / 18) (10 / 10) (10 / 5) TTC WG-2 - March 2, 2011 Page 4

5 Front end optics (version 3.7.4) TTC WG-2 - March 2, 2011 Page 5

6 Segmentation features Coarse segmentation Large diameter interconnect bellows at each end of each module. All internal piping connection from one module to another are made inside the interconnect region, usually by a bellows. Continuous insulating vacuum space (at least between vacuum breaks). Fine segmentation One or more cryogenic distribution boxes at each module. The only direct connection between modules is the beam tube. Internal cold-to-warm transitions required at each end of each beam tube. TTC WG-2 - March 2, 2011 Page 6

7 Considerations Inter-cavity spacing between cryomodules. Alignment of elements inside individual cryomodules (inter-cryomodule segmentation). Warm diagnostics requirements. Total cryomodule heat load (affects heat exchanger size). Pressure relief size and frequency. Cooldown and warm-up time. Cost, including interconnects, feed cans, transfer lines, tunnel length, etc. Cryomodule pipe sizes. Technical risks in cryomodule design. Cryomodule installation, maintenance, and replacement time and effort. Considerations pertain to both cryo and vacuum segmentation. The type and degree of segmentation will likely be driven by requirements, not the other way around. TTC WG-2 - March 2, 2011 Page 7

8 SSR cavity and cryomodule assumptions Fine segmentation in all SSR sections, i.e. each cryomodule is selfcontained. Cavities and solenoids operate at 2 K. 2 K heat exchanger in each cryomodule. Cavity string supported by warm strongback. Conduction cooled current leads for all magnet coils. Cavity MAWP = 2.5 bar warm, 4 bar cold. Button BPM s between each cavity and solenoid. Cavities and solenoids individually aligned. No adjustment after final assembly into the cryomodule, but verifiable via optical windows. Warm magnetic shield inside vacuum vessel wall capable of reducing residual field to 10 T. Cold magnetic shield on each solenoid. TTC WG-2 - March 2, 2011 Page 8

9 Initial solenoid and cavity mounting scheme Cavity and solenoid mounted on separate supports. Strongback Becomes cumbersome when element spacing decreases, as in SSR0. TTC WG-2 - March 2, 2011 Page 9

10 SSR0, solenoid, and BPM assembly 610 mm Solenoid is the same one used in the HINS front end, RT section. 2 K operation gives additional field and margin needed for SSR0 and SSR1 cryomodules. Reduced element spacing, especially for SSR0 made the original scheme less attractive. TTC WG-2 - March 2, 2011 Page 10

11 SSR1, solenoid, and BPM assembly mm TTC WG-2 - March 2, 2011 Page 11

12 SSR0 cavity string BPM C/W transition Strongback Support post TTC WG-2 - March 2, 2011 Page 12

13 Cavity string, piping, leads, etc. 2-phase header Solenoid and shield Heat exchanger Check valve (may omit) Current lead assembly C/W transition Solenoid pedestal TTC WG-2 - March 2, 2011 Page 13

14 Prototype cryomodule Heat exchanger and relief line Cryogenic feeds and controls Cavity vacuum pumpout Current lead assemblies RF input couplers Alignment viewports TTC WG-2 - March 2, 2011 Page 14

15 Domed end alternative TTC WG-2 - March 2, 2011 Page 15

16 Prototype cryomodule flat ends (SSR0 cavities shown) TTC WG-2 - March 2, 2011 Page 16

17 Prototype cryomodule domed ends (SSR0 cavities shown) TTC WG-2 - March 2, 2011 Page 17

18 Prototype cryomodule flat ends (SSR0 cavities shown) TTC WG-2 - March 2, 2011 Page 18

19 Prototype cryomodule domed ends (SSR0 cavities shown) TTC WG-2 - March 2, 2011 Page 19

20 SSR estimated heat loads SSR0 (qty 1) Each unit Mult Total 18 cavities, 18 solenoids 70 K 4.5 K + 2 K 70 K 4.5 K + 2 K Input coupler static Input coupler dynamic Cavity dynamic load Support post Conduction lead assembly MLI (total 70 K +2 K) Cold to warm transition Total SSR1 (qty 2) Each unit Mult Total 10 cavities, 10 solenoids 70 K 4.5 K + 2 K 70 K 4.5 K + 2 K Input coupler static Input coupler dynamic Cavity dynamic load Support post Conduction lead assembly MLI (total 70 K +2 K) Cold to warm transition Total SSR2 (qty 4) Each unit Mult Total 10 cavities, 5 solenoids 70 K 4.5 K + 2 K 70 K 4.5 K + 2 K Input coupler static Input coupler dynamic Cavity dynamic load Support post Conduction lead assembly MLI (total 70 K +2 K) Cold to warm transition Total Summary Each unit Mult Total SSR0, SSR1, SSR2 70 K 4.5 K + 2 K 70 K 4.5 K + 2 K SSR SSR SSR Total Notes: 1. Assume 2 pairs of 50 A and 1 pair of 200 A leads per solenoid. 2. Cavity dynamic loads from N. Solyak. TTC WG-2 - March 2, 2011 Page 20

21 SSR1 cavity 2 cavities in-house, one from Zanon, one from Roark. 2 are in-process in India. An order for 10 more is in-process at Roark/Niowave. TTC WG-2 - March 2, 2011 Page 21

22 Dressed SSR1 Cavity and Tuner Parts for 2 helium vessels are in-house, one of which is welded. One prototype tuner is being tested warm. TTC WG-2 - March 2, 2011 Page 22

23 Support post 2 supports built to date, one proof-tested to failure, one installed in the test cryostat. TTC WG-2 - March 2, 2011 Page 23

24 Input coupler Coaxial design, adjustable, 76.9 mm outer/33.4 mm inner, two disk-type ceramic windows. 3 couplers are in-house and tested. One currently installed in test cryostat. Design modifications in-process to reduce weight. TTC WG-2 - March 2, 2011 Page 24

25 Alternate design input coupler TTC WG-2 - March 2, 2011 Page 25

26 Conduction cooled current lead assembly Modeled after similar leads designed at CERN. 4 leads at 50 A, 2 leads at 200 A. Thermal intercepts at 80 K and 5 K. Sample leads currently being fabricated to verify thermal performance of conductor and intercepts. TTC WG-2 - March 2, 2011 Page 26

27 SSR0 BPM assembly 270 mm 205 mm Beam Cavity end 4-1/2 fixed Conflat 1-1/2 OD, 30 mm ID tube 4-1/2 rotatable Conflat TTC WG-2 - March 2, 2011 Page 27

28 Test cryostat installed in MDB TTC WG-2 - March 2, 2011 Page 28

29 325 MHz steady-state results Number of cavities vs. 2-phase pipe size Small 2-phase pipe OK for steady-state SSR0 SSR1 and SSR2 From Tom Peterson TTC WG-2 - March 2, 2011 Page 29

30 325 MHz steady-state results Number of cavities vs. 2-phase pipe size Emergency venting of 10 cavities results in 2 bar pressure drop Emergency venting of 8 cavities results in 1 bar pressure drop For mechanical space reasons we would like to use a 5-inch OD tube in our 325 MHz CM. The practical limit then is 8 cavities in series for emergency venting flow. From Tom Peterson TTC WG-2 - March 2, 2011 Page 30

31 325 MHz 2-Phase pipe conclusion Steady-state flow requirement is relatively low. 4 cm ID is adequate to keep a low helium vapor velocity (< 5 m/sec) with over 20 cavities in series, such as one long SSR0 cryomodule (neglecting cross-section occupied by liquid, so we have to add to the diameter for a liquid level). Venting for loss of cavity vacuum determines 2-phase pipe size. A 3 inch air inlet hole implies roughly a 14 cm 2-phase pipe and a 19 cm vent line. Basically 5-6 inch and 8 inch diameter, respectively. Prototype SSR cryomodule will incorporate these pipe sizes even though they would not be required for this small cryomodule alone. TTC WG-2 - March 2, 2011 Page 31

32 FRIB bathtub design cryomodule TTC WG-2 - March 2, 2011 Page 32

33 Status and plans Optics design is in-process and seems to be converging. SSR1 cavity design complete. SSR0 nearly complete. SSR2 in-process. Helium vessel designs for all are in-process (1 st generation SSR1 helium vessel will not be used in prototype cryomodule). Prototype cryomodule design in-process. It will contain 4 cavities and 4 solenoids, either SSR0 or SSR1. Final configuration to be determined. Functional specification for the prototype is complete and those for the production SSR cryomodules are in-process. Many sub-component designs are complete or nearly so. Strongback Support post Input coupler Current lead assembly First generation tuner BPM Need to work out assembly procedure details, especially for the longest cryomodules. Test cryostat for single, dressed cavity tests is installed. A 2 K conversion is being designed. Weighing pros and cons of adopting the bathtub style cryomodule. TTC WG-2 - March 2, 2011 Page 33

Task Cryomodule. Paolo Pierini INFN Sezione di Milano - LASA

Task Cryomodule. Paolo Pierini INFN Sezione di Milano - LASA Task 1.3.3 Cryomodule Paolo Pierini INFN Sezione di Milano - LASA Outline Schedule borrowed from Alex Karlsruhe presentation Aim of the task & work split Comment on existing cryomodule designs, trying

More information

Solenoid Magnets for the Front End of a Neutrino Factory

Solenoid Magnets for the Front End of a Neutrino Factory Solenoid Magnets for the Front End of a Neutrino Factory M.A. Green and S.S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720 J.R. Miller and S. Prestemon National High Magnetic Field Laboratory,

More information

M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA

M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA LBNL-48445 SCMAG-749 SUPERCONDUCTING MAGNETS FOR INDUCTION LINAC PHASE-ROTATION IN A NEUTRINO FACTORY M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA ABSTRACT The neutrino

More information

Present and Future Cryogenics at Cornell

Present and Future Cryogenics at Cornell QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. QuickTime and a TIFF (Uncompressed) decompressor

More information

Review of the Magnetic Shielding Design of Low-Beta Cryomodules Bob Laxdal, TRIUMF

Review of the Magnetic Shielding Design of Low-Beta Cryomodules Bob Laxdal, TRIUMF Review of the Magnetic Shielding Design of Low-Beta Cryomodules Bob Laxdal, TRIUMF 25/09/2013 SRF2013 - Bob Laxdal - TRIUMF 1 Outline Introduction Facilities, projects and proposals General considerations

More information

Major Upgrade Activity of the PLS in PAL: PLS-II

Major Upgrade Activity of the PLS in PAL: PLS-II Major Upgrade Activity of the PLS in PAL: PLS-II S. H. Nam on behalf of the PAL staff Pohang Accelerator Laboratory (PAL) POSTECH May 7, 2009 Particle Accelerator Conference 2009 Vancouver, British Columbia,

More information

SNS Operation and Upgrade Plans

SNS Operation and Upgrade Plans SNS Operation and Upgrade Plans Andrei Shishlo SNS Project, Oak Ridge National Lab Warm Linac Physicist On behalf of Accelerator Physics Team June 21, 2018 Presented at the HB2018, Daejeon, Korea, June

More information

ILC. CFS update for Europe (CERN): Cross Sections 3d Layout and BDS tunnel diameters CERN Resources. LCWS10 and ILC10 - Beijing

ILC. CFS update for Europe (CERN): Cross Sections 3d Layout and BDS tunnel diameters CERN Resources. LCWS10 and ILC10 - Beijing ILC CFS update for Europe (CERN): Cross Sections 3d Layout and BDS tunnel diameters CERN Resources John Osborne March 2010 LCWS10 and ILC10 - Beijing Cross section for Europe (CERN) 5.2m diameter for Kly

More information

Hall C SHMS Progress

Hall C SHMS Progress Hall C SHMS Progress Paul Brindza Hall C Senior Engineer January 25, 2013 Page 1 SHMS and Magnet Systems Overview Cryo-Control Reservoirs Cryogenics Infrastructure Power Supplies & Controls HB Q1 Q2 Q3

More information

Analyzing the Thermal Operating Conditions of a Solenoid

Analyzing the Thermal Operating Conditions of a Solenoid A CASE STUDY FROM SOLENOID SYSTEMS Analyzing the Thermal Operating Conditions of a Solenoid BACKGROUND When designing a Solenoid the operating temperature of the Coil must be taken into account when assessing

More information

PRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION

PRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION PRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION X.R. Wang, C. Koehly, M. S. Tillack, S. Malang and F. Najmabadi ARIES-Pathways Project Meeting Germantown, DC May 21-22, 2013 OVERALL LAYOUT OF THE ACT-2

More information

Central Region Group Status and Positron Region

Central Region Group Status and Positron Region Central Region Group Status and Positron Region K. Yokoya 2016.9.14. Posipol2016, LAL 2016/9/14 Posipol2016 1 Issues Discussed in CRWG Positron-related 10Hz operation Auxiliary positron source (APS) Positron

More information

Status of the Nuclotron-M project

Status of the Nuclotron-M project Status of the Nuclotron-M project PAC for Particle Physics, Dubna, 14 Jan 2010 G. Trubnikov for the project team NICA: Nuclotron based Ion Collider facility Nuclotron provides now performance of experiments

More information

ARIEL s E-linac and beam transport line vacuum systems

ARIEL s E-linac and beam transport line vacuum systems Canada s National Laboratory for Particle and Nuclear Physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules ARIEL s E-linac and beam transport line

More information

Summary of Working Group C: Injection, Extraction, Accelerator Systems

Summary of Working Group C: Injection, Extraction, Accelerator Systems Summary of Working Group C: Injection, Extraction, Accelerator Systems D. Johnson and S. Cousineau ICFA HB2010 Sept 27 Oct. 1 Morschach, Switzerland Outline of Summary 1. Essence of the Work Group New

More information

UPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION

UPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION UPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION AND SYSTEM INTEGRATION X.R. Wang, M. S. Tillack, S. Malang, C. Koehly, F. Najmabadi and the ARIES Team ARIES-Pathways Project Meeting UC San Diego January

More information

1. Review of the Test

1. Review of the Test NuMI-B-800 Ionization Chambers used at the Fermilab Booster Test Beam Sacha E. Kopp, Robert M. Zwaska, Marek Proga University of Texas, Austin, TX 1. Review of the Test The Beam Monitoring group wished

More information

DEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance

DEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance DEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance 1.) Overview on European Blanket Concepts and Integration principles 2.) Large Module Integration 3.) Multi Module Segment (MMS) Integration

More information

Cryogenic Improvements for the ATLAS Energy Upgrade

Cryogenic Improvements for the ATLAS Energy Upgrade Cryogenic Improvements for the ATLAS Energy Upgrade Cryogenic Operations Workshop May 9-11, 2006 Presented by Steve MacDonald Argonne National Laboratory A Laboratory Operated by The University of Chicago

More information

KSTAR Assembly. National Fusion Research Center, Daejeon, Korea

KSTAR Assembly. National Fusion Research Center, Daejeon, Korea 1 FT/2-2 KSTAR Assembly H. L. Yang, H. K. Kim, K. M. Kim, J. W. Sa, S. T. Kim, H. T. Kim, K. H. Hong, W. C. Kim, K. H. Kim, Y. S. Kim, J. Y. Kim, C. H. Choi, Y. K. Oh, Y. M. Park, M. Kwon, J. S. Bak, G.

More information

Camera Electronics Systems

Camera Electronics Systems Camera Electronics Systems September 2008 Rick Van Berg Outline Camera Electronic Systems Science Electronics (including corner rafts) Power regulation and distribution Cabling Controllers / sensors Safety

More information

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory R.D. Scarpetti, S. Nath, J. Barraza, C. A. Ekdahl, E. Jacquez, K. Nielsen, J. Seitz Los Alamos National Laboratory, Los Alamos,

More information

600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS

600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 605 600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS T.P. Andersen

More information

Mu2e Solenoids! Michael Lamm! L2 for the Mu2e Solenoid! July 27, 2015!

Mu2e Solenoids! Michael Lamm! L2 for the Mu2e Solenoid! July 27, 2015! Mu2e Solenoids Michael Lamm L2 for the Mu2e Solenoid July 27, 2015 Mu2e Solenoids Perform many functions in the Mu2e Experiment One continuous field, generated by 3 unique superconducting solenoid systems

More information

CRYO FTIR.

CRYO FTIR. FTIR Cryostats Cryostats for FTIR Experiments Cryo Industries Variable Temperature Continuous Flow Cryostas (Models RC-102 and RC-152) are an excellent choice for Fourier Transform Infra-Red (FTIR) spectroscopy

More information

Performance of Small-Gap Undulators at the SLS Intermediate Energy Storage Ring

Performance of Small-Gap Undulators at the SLS Intermediate Energy Storage Ring Performance of Small-Gap Undulators at the SLS Intermediate Energy Storage Ring Gerhard Ingold Paul Scherrer Institut Laboratory for Synchrotron Radiation FEMTO Group New Frontiers in Insertion Devices

More information

Study of the impact of the remote alignment in the vacuum system

Study of the impact of the remote alignment in the vacuum system Study of the impact of the remote alignment in the vacuum system R. Rego, V. Baglin, J. Hansen CERN, 24 th September 2018 EDMS: 2027649 Outline 1. Introduction 2. Inner triplet area 3. TAXN-D2 area 4.

More information

Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron

Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron Josep Campmany on behalf of CELLS Accelerators Division 10/11/2011 J. Campmany ALBA- CELLS (Barcelona)

More information

Models: CS210A-X5

Models: CS210A-X5 Neutron Scattering Closed Cycle Cryostat Closed Cycle Cryostat for Neutron Scattering Experiments. The CS-210 is a high power cooler with fast cooldown and high cooling power. Models: CS210S-X5 CS210A-X5

More information

UHV Flow Cryostat - Helitran

UHV Flow Cryostat - Helitran The ARS manufactured LT3B Helitran is a True UHV cold head (10-11 Torr) where all of the rubber o-ring seals have been replaced with welded joints and metal seals. Like all of our LT3 helium flow cryostats,

More information

Approaches to Maintenance. S. Malang

Approaches to Maintenance. S. Malang Approaches to Maintenance S. Malang FNST Meeting, UCLA, August 12-14, 2008 Areas involved in the selection of methods for blanket maintenance: (Emphasis may be different for FNF and DEMO) - Segmentation

More information

Liquid Nitrogen Research Dewars

Liquid Nitrogen Research Dewars Liquid Nitrogen Research Dewars Sample in Vacuum: Detector Series Industries of America www.cryoindustries.com Sample in Vacuum Detector Series UNIQUE THERMAL LINK DESIGN VARIABLE TEMPERATURE LIQUID NITROGEN

More information

THE 12 GeV ENERGY UPGRADE AT JEFFERSON LABORATORY

THE 12 GeV ENERGY UPGRADE AT JEFFERSON LABORATORY THE 12 GeV ENERGY UPGRADE AT JEFFERSON LABORATORY F. Pilat Thomas Jefferson National Accelerator Facility, Newport News, VA 23606, USA Abstract Jefferson Laboratory has undertaken a major upgrade of its

More information

Future opportunities for Industry

Future opportunities for Industry Neutral Beam Test Facility Heating Neutral Beam Injectors Electron Cyclotron Power Supplies and Sources Tullio Bonicelli and the NB&EC PSS Project Team with thanks to all European Laboratories and Industries

More information

PF Coil Fabrication Overview

PF Coil Fabrication Overview PF Coil Fabrication Overview PF Coils Information Meeting Barcelona - 15 th October 2012 This presentation is intended for reference purposes only and is not a legally binding document PF Building Layout

More information

Mini-F: A Small Plasma Focus Device

Mini-F: A Small Plasma Focus Device Mini-F: A Small Plasma Focus Device Steve Hansen I. INTRODUCTION Those who have followed this publication know of my fondness for coaxial plasma guns. I constructed my first gun sometime around 1972 and

More information

STATUS OF THE LARGE HADRON COLLIDER (LHC)

STATUS OF THE LARGE HADRON COLLIDER (LHC) EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1130 STATUS OF THE LARGE HADRON COLLIDER (LHC) F. Bordry CERN, Geneva,

More information

Glove Box Instrumentation Specifications

Glove Box Instrumentation Specifications Glove Box Instrumentation Specifications Steve Hardy March 2, 2007 This document will act as a list of the technical specifications and other useful information for the insertion system instrumentation.

More information

BNC and MHV SHV-5 and SHV-10 SHV-20 and SHV-B

BNC and MHV SHV-5 and SHV-10 SHV-20 and SHV-B Coaxial is the description for electrical feedthroughs with parallel and concentric conductor paths, and with the inner most conductor path electrically isolated from the vacuum flange. Grounded Shield

More information

Single-phase Coolant Flow and Heat Transfer

Single-phase Coolant Flow and Heat Transfer 22.06 ENGINEERING OF NUCLEAR SYSTEMS - Fall 2010 Problem Set 5 Single-phase Coolant Flow and Heat Transfer 1) Hydraulic Analysis of the Emergency Core Spray System in a BWR The emergency spray system of

More information

The Results of the KSTAR Superconducting Coil Test

The Results of the KSTAR Superconducting Coil Test 1 FT/3-2 The Results of the KSTAR Superconducting Coil Test Y. K. Oh, Y. Chu, S. Lee, S. J. Lee, S. Baek, J. S. Kim, K. W. Cho, H. Yonekawa, Y. Chang, K. R. Park, W. Chung, S. H. Lee, S. H. Park, I. S.

More information

Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource

Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource Johannes Bauer, James Liu, Alyssa Prinz, Sayed Rokni Radiation Protection Department SLAC National Accelerator

More information

Electron Beam Alignment Strategy in the LCLS Undulators

Electron Beam Alignment Strategy in the LCLS Undulators Electron Beam Alignment Strategy in the LCLS Undulators Undulator Overview Tolerances Controls Monitoring Alignment Diagnostics System Task Scheduling August 31, 2006 Collaborators: Georg L. Gassner Paul

More information

PETRA III Damping Sections

PETRA III Damping Sections PETRA III Damping Sections Markus Tischer, HASYLAB 05.05.06 Damping wiggler sections BINP / DESY cooperation on Damping wiggler Vacuum system Absorber M. Tischer PETRA III Damping Sections (MAC meeting,

More information

ITER Magnets Update European perspective

ITER Magnets Update European perspective ITER Magnets Update European perspective Hannu Rajainmaki, Boris Bellesia, Alessandro Bonito-Oliva, Eva Boter, Thierry Boutboul, Eugen Bratu, Marc Cornelis, John Fanthome, Robert Harrison, Peter Readman,

More information

Powering Schemes for the Strip Trackers

Powering Schemes for the Strip Trackers Powering Schemes for the Strip Trackers Peter W Phillips STFC Rutherford Appleton Laboratory and ATLAS ITk Strip Community ACES, CERN, 8 th March 2016 Outline Proposed CMS Tracker Distribution Scheme Module

More information

INTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT

INTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT INTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT X.R. Wang 1, S. Malang 2, L.A. El-Guebaly 3, A. R. Raffray 1 and the ARIES Team 1 University of California, San

More information

Magnet, Support and Infrastructure. Whit Seay November 7, 2014

Magnet, Support and Infrastructure. Whit Seay November 7, 2014 Magnet, Support and Infrastructure Whit Seay November 7, 2014 Engineering Progress Efforts in cost and labor estimate Contributions to pcdr document Visit to Cornell Dry Run - Magnet - Hall A Layout for

More information

Dual-Cooled Blanket Modular Replacement Design Approach

Dual-Cooled Blanket Modular Replacement Design Approach Dual-Cooled Blanket Modular Replacement Design Approach Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray, and The ARIES Team ARIES Meeting General Atomics, San Diego February 24-25, 2005 Outline

More information

PF Coil 2-6 Supply. Main technical aspects. P. Valente

PF Coil 2-6 Supply. Main technical aspects. P. Valente PF Coil 2-6 Supply Main technical aspects P. Valente PF Coils EI Information Meeting Cadarache, 19 February 2013 This presentation is intended for reference purposes only and is not a legally binding document

More information

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada CANADA S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada

More information

Vacuum pumps for the ESRF EBS project Michael Hahn

Vacuum pumps for the ESRF EBS project Michael Hahn 3 rd Rencontres Nationales DU RESEAU TECHNOLOGIES DU VIDE SEVRIER, 10 13 October 2016 Vacuum pumps for the ESRF EBS project Michael Hahn On behalf of the EBS Accelerator Project Team OUTLINE Project definition

More information

Powering Schemes for the Strip Trackers

Powering Schemes for the Strip Trackers Powering Schemes for the Strip Trackers Peter W Phillips STFC Rutherford Appleton Laboratory and ATLAS ITk Strip Community ACES, CERN, 8 th March 2016 Outline Proposed CMS Tracker Distribution Scheme ATLAS

More information

Gazprom s Helium Facility in Orenburg Supply & Start-Up of a Linde Liquefier. Klaus Ohlig Twente, July 9 th, 2014

Gazprom s Helium Facility in Orenburg Supply & Start-Up of a Linde Liquefier. Klaus Ohlig Twente, July 9 th, 2014 Gazprom s Helium Facility in Orenburg Supply & Start-Up of a Linde Liquefier Klaus Ohlig Twente, July 9 th, 2014 Table of Contents 1. Introduction 2. Linde s Helium Product Portfolio 3. Key Components

More information

XFEL Bunch Compressor BC1 and BC2 Vacuum Issues

XFEL Bunch Compressor BC1 and BC2 Vacuum Issues Bunch Compressor BC1 and BC2 Vacuum Issues Nils Mildner, Torsten Wohlenberg, Kirsten Zapfe Beam Dynamic Meeting 1 Bunch compressor section BC1 and BC2 General remarks Lengths of the vacuum system BC1 and

More information

UPDATE ON THE LHC MAIN MAGNETS. Lucio Rossi CERN - LHC MAC 15

UPDATE ON THE LHC MAIN MAGNETS. Lucio Rossi CERN - LHC MAC 15 UPDATE ON THE LHC MAIN MAGNETS Lucio Rossi CERN - LHC MAC 15 Content Cable Components Production of dipoles and learing curves Fiedl quality Collared cois CM production Results and Delivery Plan for dipoles

More information

JLab. By JLab Cryo Group. Presenter: VenkataRao Ganni January 25, 2011

JLab. By JLab Cryo Group. Presenter: VenkataRao Ganni January 25, 2011 Cryogenics @ JLab By JLab Cryo Group Presenter: VenkataRao Ganni January 25, 2011 Page 1 Outline JLab Overview What is Cryogenics? Applications of Cryogenics Temperature Choice for Jlab Linacs Overview

More information

Progress of the JT-60SA Project

Progress of the JT-60SA Project Progress of the JT-60SA Project P. Barabaschi, Y. Kamada, H. Shirai For the JT-60SA Integrated Project Team EU: F4E-CEA-ENEA-CNR/RFX-KIT-CIEMAT-SCKCEN JA: QST C.R.FRASCATI- ITALY 1 JT-60SA Project Agreement

More information

Support and Infrastructure

Support and Infrastructure Support and Infrastructure SoLID Director s Review Whit Seay February 23, 2014 SoLID Experimental Set-ups Design a system for mounting experimental apparatus that can be utilized by both set-ups. Integrate

More information

Holds six crystals with robust, automatic switching to maximize process uptime

Holds six crystals with robust, automatic switching to maximize process uptime CrystalSix Sensor The INFICON CrystalSix sensor is critical for long processes demanding continuous rate control. Whether an OLED, MBE, Solar, long Optical Coating, or other processes having an extended

More information

Pumping Systems for ITER, FIRE and ARIES

Pumping Systems for ITER, FIRE and ARIES Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications F, Inc. March 6, 2001 1 ITER Vacuum System Tritium compatible batch regenerating

More information

Richard Hull s Mysterious Motor

Richard Hull s Mysterious Motor Update June 2009: The following is some updated information regarding http://www.mtaonline.net/~hheffner/hullmotor.pdf fig. 3 provided below is an improved version of Fig. 3 in the above original work.

More information

ITER Vacuum Vessel Loads. Jake Blanchard October 2011

ITER Vacuum Vessel Loads. Jake Blanchard October 2011 ITER Vacuum Vessel Loads Jake Blanchard October 2011 Introduction As we consider alternative materials for our vacuum vessel, it is natural to compare to the ITER vessel To make appropriate use of their

More information

Status of the MYRRHA Project

Status of the MYRRHA Project Status of the MYRRHA Project Carmen Angulo Head of Expert Group Accelerator Project SCK CEN, Mol, Belgium carmen.angulo@sckcen.be AccApp 17, August 2, 2017, Ville de Québec, Québec, Canada Outline What

More information

The LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges:

The LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges: The LHCb experiment The LHCb experiment dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges: highly selective trigger to collect large samples of B decays in specific

More information

Costing of Test Articles Ancillary Equipment and Costing Methodology

Costing of Test Articles Ancillary Equipment and Costing Methodology Costing of Test Articles Ancillary Equipment and Costing Methodology 0.504 m x 1.71 m x 0.413 m C. Wong, S. Malang, M. Youssef, N. Morley, M. Ulrickson and the TBM design team US ITER-TBM Meeting August

More information

LET9045C. RF power transistor from the LdmoST family of n-channel enhancement-mode lateral MOSFETs. Features. Description

LET9045C. RF power transistor from the LdmoST family of n-channel enhancement-mode lateral MOSFETs. Features. Description RF power transistor from the LdmoST family of n-channel enhancement-mode lateral MOSFETs Features Excellent thermal stability Common source configuration P OUT (@28 V) = 45 W with 18.5 db gain @ 960 MHz

More information

CONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT

CONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT CONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT X.R. Wang 1, S. Malang 2, A. R. Raffray 1 and The ARIES Team 1 University of California, San Diego, CA, 9500 Gilman

More information

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon September 2018

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon September 2018 GENERAL ATOMICS ITER Central Solenoid Module Fabrication September 2018 ITER Central Solenoid The heart of the international fusion energy device The Central Solenoid (CS) is the heart of ITER. The 5-story,

More information

EVT A Memo 34. ig^la MONITOR AND CONTROL SYSTEM Monitor and Control Points. George Peck

EVT A Memo 34. ig^la MONITOR AND CONTROL SYSTEM Monitor and Control Points. George Peck EVT A Memo 34 ig^la MONITOR AND CONTROL SYSTEM Monitor and Control Points George Peck PROGRESS REPORT - March 12, 2002 This report summarizes the information gathered so far about monitor and control points

More information

The Status of SSRF Survey and Alignment System. ChenghaoYu, Hanwen Du Lixin Yin

The Status of SSRF Survey and Alignment System. ChenghaoYu, Hanwen Du Lixin Yin The Status of SSRF Survey and Alignment System ChenghaoYu, Hanwen Du Lixin Yin Content I. Introduction II. Design of SSRF survey and alignment system III. Implementation Introduction Shanghai Synchrotron

More information

PPMS family of instruments. April 2014

PPMS family of instruments. April 2014 PPMS family of instruments April 2014 outline PPMS family wet: PPMS, EverCool, EverCool- II (SQUID also) dry: Dynacool, VersaLab Temperature control all but VL: He gas flow VL: thermal switch Field control

More information

Portable. Storage and Transport Dewars. CL/CLPB Series, CH Series, CFN/CFL Series

Portable. Storage and Transport Dewars. CL/CLPB Series, CH Series, CFN/CFL Series Portable Storage and Transport Dewars CL/CLPB Series, CH Series, CFN/CFL Series CL/CLPB Series Cryofab s CL series portable liquid cylinders are intended for low-pressure transport and storage of liquid

More information

Vacuum isolated transfer lines for bath cryostats

Vacuum isolated transfer lines for bath cryostats for bath cryostats Last modified /09 Description The vacuum isolated transfer lines are used for transferring liquid helium. The vacuum isolated transfer lines can be manufactured with different diameters,

More information

From MYRRHA to XT-ADS: lessons learned and towards implementation

From MYRRHA to XT-ADS: lessons learned and towards implementation From MYRRHA to XT-ADS: lessons learned and towards implementation Didier De Bruyn On behalf of the EUROTRANS DM1 partners AccApp 09 Satellite meeting 1 Summary More than 40 partners have started the FP6

More information

Development of the LPT W Concentric Pulse Tube

Development of the LPT W Concentric Pulse Tube Page: 1 of 7 Conference naam Cryogenic Engineering Conference Conference year 2005 Title of paper J. C. Mullié 1, P. C. Bruins 1, T. Benschop 1, Authors of paper I. Charles 2, A. Coynel 2, L. Duband 2

More information

Linac Girder R&D. C. Boffo E. Borissov H. Carter. Fermilab, Technical Division RF Technology and Development Group

Linac Girder R&D. C. Boffo E. Borissov H. Carter. Fermilab, Technical Division RF Technology and Development Group C. Boffo E. Borissov H. Carter Fermilab, Technical Division RF Technology and Development Group F. Le Pimpec A. Seryi C. Adolphsen SLAC T. Khabiboulline FNAL C. Boffo Slide 1/27 OUTLINE Strongbacks for

More information

Progress Towards Doubling the Beam Power at Fermilab s Accelerator Complex

Progress Towards Doubling the Beam Power at Fermilab s Accelerator Complex Progress Towards Doubling the Beam Power at Fermilab s Accelerator Complex June 17, 2014 Ioanis Kourbanis FERMILAB Outline Introduction. Review of past MI high power operations. Plan of doubling the MI

More information

AGILENT VACUUM VALVEs

AGILENT VACUUM VALVEs GILENT VCUUM valves 2-3 gilent Vacuum Valve Solutions 4-17 gilent High Performance Valves 18-21 Stainless Steel Tube Valves 22-23 Electromagnetic Block Valves 24 Variable Leak Valves gilent Vacuum Valve

More information

Created: 4/23/2003 Page: 1 of 12. Abstract

Created: 4/23/2003 Page: 1 of 12. Abstract Collimators and Transport Solenoid Shielding Reference Design Document No: Created: 4/23/2003 Page: 1 of 12 MECO-MUB-03-002 Modified: 10/13/03 Version: 1.01 Prepared by: M. Hebert, V. Tumakov Approved

More information

Senior Design: Validation of Design. December 15, 2008

Senior Design: Validation of Design. December 15, 2008 Senior Design: Validation of Design December 15, 2008 What s a Seal? A mechanical device used to prevent leakage from pumped fluids along a drive shaft. Mechanical seals increase efficiency and reliability

More information

Draft Working List to be done at CERN for ATLAS Central Solenoid. Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK)

Draft Working List to be done at CERN for ATLAS Central Solenoid. Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK) Draft Working List to be done at CERN for ATLAS Central Solenoid Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK) 1 General Working List Works in Bldg. 180: CS system delivered and acceptance

More information

Key Stellarator Engineering Issues and Constraints

Key Stellarator Engineering Issues and Constraints Key Stellarator Engineering Issues and Constraints P. Heitzenroeder for the NCSX Engineering Team ARIES Meeting at PPPL - October, 2002 1 How The Engineering of a Compact Stellarator Differs from Most

More information

CFD Analysis and Comparison of Fluid Flow Through A Single Hole And Multi Hole Orifice Plate

CFD Analysis and Comparison of Fluid Flow Through A Single Hole And Multi Hole Orifice Plate CFD Analysis and Comparison of Fluid Flow Through A Single Hole And Multi Hole Orifice Plate Malatesh Barki. 1, Ganesha T. 2, Dr. M. C. Math³ 1, 2, 3, Department of Thermal Power Engineering 1, 2, 3 VTU

More information

Laser Land Leveling System AG308

Laser Land Leveling System AG308 Image of Mast : 2.The Installation of Hydraulic Parts The Hydraulic Parts includes: Oil Tank, Oil Tube, Oil Pump, Group Valve and Oil Cylinder. The Oil Pump linked with the Power-Output Shaft, it is the

More information

Coreless Concept for High Gradient Induction Cell

Coreless Concept for High Gradient Induction Cell SLAC-WP-078 November 2007 Coreless Concept for High Gradient Induction Cell Anatoly Krasnykh Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 Work supported by US Department

More information

A Division of Nailor International Inc. ECONOMY AIR HANDLERS

A Division of Nailor International Inc. ECONOMY AIR HANDLERS A Division of Nailor International Inc. MODEL : ECONOMY AIR HANDLERS Thermal Model Standard Specification MODEL 800-4000 CFM AIR HANDLERS Description Model air handlers are designed for efficient and economical

More information

Basic Thermal Energy Transfer with a Heat Exchanger

Basic Thermal Energy Transfer with a Heat Exchanger Exercise 4-1 Basic Thermal Energy Transfer with a Heat Exchanger EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the basic principles of operation of a typical heat

More information

First Applications on AltaLink s Network. Roggero Ciofani, P. Eng. Colin Clark, P. Eng.

First Applications on AltaLink s Network. Roggero Ciofani, P. Eng. Colin Clark, P. Eng. First Applications on AltaLink s Network Roggero Ciofani, P. Eng. Colin Clark, P. Eng. Overview Technology Overview Applications and Alternatives Advantages Alberta Special Considerations Operational Implications

More information

DEVELOPMENT OF A 3D MODEL OF TUBE BUNDLE OF VVER REACTOR STEAM GENERATOR

DEVELOPMENT OF A 3D MODEL OF TUBE BUNDLE OF VVER REACTOR STEAM GENERATOR DEVELOPMENT OF A 3D MODEL OF TUBE BUNDLE OF VVER REACTOR STEAM GENERATOR V.F. Strizhov, M.A. Bykov, A.Ye. Kiselev A.V. Shishov, A.A. Krutikov, D.A. Posysaev, D.A. Mustafina IBRAE RAN, Moscow, Russia Abstract

More information

The ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto

The ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto The ATLAS Detector at the Large Hadron Collider Peter Krieger IPP/University of Toronto The ATLAS Detector at the Large Hadron Collider Peter Krieger IPP/Toronto CAP Congress, Winnipeg 2004 2 Peter Krieger

More information

Beam Energy Absorber and

Beam Energy Absorber and ADS Workshop VirginiaTech, September 2010 Beam Energy Absorber and Converter with Moving Core Pavel Degtiarenko ESH&Q Division, JLab 1 Contents Brief review Properties of High Power and High Energy Beam

More information

Sputter System. SPS-R2R series. ULTECH Co., Ltd.

Sputter System. SPS-R2R series. ULTECH Co., Ltd. Sputter System SPS-R2R series Introduction System Picture (reference) Process 1) Application : 2) Sputtering material : TCO (ITO,AZO,ZnO), Metal 3) Film width : max. 100mm 4) Film length : max. 100M 4)

More information

GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION

GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION January 2018 ITER Central Solenoid The heart of the international fusion energy device The Central Solenoid (CS) is the heart of ITER. The 5-story,

More information

Optimizing Airflow on Dust, Mist and Fume Collection Systems

Optimizing Airflow on Dust, Mist and Fume Collection Systems Optimizing Airflow on Dust, Mist and Fume Collection Systems Extend filter life. Conserve energy. Save money. by Lori Lehner, Donaldson Torit Technical Training Manager Optimizing airflow control in your

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur 208016, Uttar Pradesh, India Centre for Lasers and Photonics Enquiry no.: CELP/RV/EQP/MHR/2017/1 Enquiry date: 23/04/2018 Closing date: 17/05/2018 Sealed quotations

More information

Electrostatic Charging

Electrostatic Charging 64 Electrostatic Charging Equipment List Qty Items Part Numbers 1 Charge Sensor CI-6555 1 Charge Producers and Proof Planes ES-9057A 1 Faraday Ice Pail ES-9024A Introduction The purpose of this activity

More information

Extended requirements on turbogenerators

Extended requirements on turbogenerators , Siemens AG, Mülheim/Ruhr, Germany Extended requirements on turbogenerators due to changed operational regimes siemens.com Table of Content Evaluation of current operation regimes Extended requirements

More information

Cooldown Measurements in a Standing Wave Thermoacoustic Refrigerator

Cooldown Measurements in a Standing Wave Thermoacoustic Refrigerator Cooldown Measurements in a Standing Wave Thermoacoustic Refrigerator R. C. Dhuley, M.D. Atrey Mechanical Engineering Department, Indian Institute of Technology Bombay, Powai Mumbai-400076 Thermoacoustic

More information

Carlo J. Bocchetta ESLS XIX Aarhus, Denmark November Status of Solaris

Carlo J. Bocchetta ESLS XIX Aarhus, Denmark November Status of Solaris Carlo J. Bocchetta ESLS XIX Aarhus, Denmark 23-24 November 2011 Status of Solaris What is Solaris? Polish Synchrotron Radiation Facility in Krakow Replica of the MAX IV 1.5 GeV Storage Ring and parts of

More information