1 Engineering Studies Coordination Study Every 5 years and in conjunction with electrical system modifications. Short Circuit Study NETA MTS 6.2 Every 5 years and in conjunction with electrical system modifications. Arc Flash Analysis NETA MTS 6.1 Every 5 years and in conjunction with electrical system modifications. Consideration should also be given to recapitalization and NFPA-70E. Utility (Medium Voltage) Systems NETA MTS 6.3 Service entrance load measurements Medium voltage conductors and NETA MTS 7.3.3

2 connections Visual Inspection Infrared Scan Very Low frequency or Hipot test (DC) 1 1 It is important to understand that a Hi-pot test generates voltages and currents that can cause harm to testers or equipment. When considering a Hi-pot test, the tester should understand the risks, such as the potential to cause harm and/or potential damage to cables with extended service lives.

3 Utility (Medium Voltage) Systems Oil test (dielectric, acidity, color, pf interfacial tension) After transformer fuse or OCPD activation due to fault Oil test (dissolved gas) Insulation resistance (power factor) De-energized cleaning and testing After transformer fuse or OCPD activation due to fault Low Voltage(<600V) Systems Mechanical electrical distribution load measurements Low voltage conductors and Infrared scan NETA MTS connections Splices in conductors that support mission critical equipment Infrared scan

4 Low Voltage(<600V) Systems Dry type transformers Switchgear Infrared scan NETA MTS , cleaning/deenergizing is recommended every 1-2 years NETA MTS , consideration should be given to both switchgear and switchboards. Infrared scan De-energized cleaning and testing Test alarms and remote monitoring Control batteries and battery charger Backup PLC and system programs/ software After all changes in program and PLC reboot verifies program has been downloaded

5 Visual inspection Test batteries Instruments and metering Fuses and fuse holders Inspect and calibrate Inspect and test Functional Test Low Voltage(<600V) Systems Draw-out type breakers Operate breaker Internal inspection of the breaker Test and lubricate breaker Insulation resistance test Test trip unit (primary or secondary injection) Consideration also to NETA MTS when conducting Trip unit settings

6 Contact conductivity test Molded case circuit breakers NETA MTS Operate breaker Functional Test Low Voltage(<600V) Systems Test trip unit (primary or secondary injection) Refer to NETA MTS for primary versus secondary testing recommendations Panel boards Infrared scan Protective relays 2 NETA MTS 7.9.1, Test (timing, pickup, time delay) 2 Protective relays should be tested with its associated MV breaker to ensure control power/wiring, trip coil, and batteries work properly.

7 Check settings UPS System UPS Output Load Measurements Visual inspection Preventive maintenance per manufacturers recommendations

8 UPS System Transfer of UPS system to bypass Test alarms and remote monitoring VRLA batteries Per IEEE 1188 Wet cell batteries Per IEEE 450 Power Systems Directly Supporting DODIN Equipment Rectifiers and Battery Chargers NETA MTS , Visual inspection Preventive maintenance per manufacturers recommendations Load test of batteries using DODIN equipment as load Test alarms and remote monitoring

9 Power Systems Directly Supporting DODIN Equipment VRLA batteries Per IEEE 1188 Wet cell batteries Per IEEE 450 Generator Plant UPS output load measurements Visual inspection (temp > 32ᵒF) Visual inspection (temp < 32 ᵒF) Twice Per Week Test alarms and remote monitoring Engine Preventive maintenance per manufacturer recommendations Generator Vibration analysis (standby systems)

10 Generator Plant Batteries and battery charger Vibration analysis (continuous systems) Test batteries Fuel System Visual inspection Fuel System Filter Change Bi-weekly are also acceptable based on mission constraints Or manufacturer s recommendation if sooner Test Operational Tests Generator Operational run utilizing control test functions (with building load) Utility fail test Full load test with load banks should be performed annually After repair or modification to the controls of the generator plant

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton Advances in technology to address safety Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton 1 Advances in technology could mean use existing technology & back to basics Advances in safety are

More information

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit

More information

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations 1 IEEE1818-2017 Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations Sponsored by the IEEE Substations Committee Presented By Joe Gravelle Organization of the Guide 1. Scope

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 1 2 3 4 5 6 7 8 9 Q. Please describe Hydro s terminal station and substation inspections policies and practices. In

More information

In any of the 5 star hotels. The exact venue will be informed once finalized.

In any of the 5 star hotels. The exact venue will be informed once finalized. Training Title ELECTRIC DISTRIBUTION SYSTEM EQUIPMENT: Transformers, Switchgears, Circuit Breakers, Relays, Capacitors, Surge Arresters, Cables & Meters: Operation, Inspection, Testing, Evaluation, Maintenance

More information

MAINTENANCE TESTING SPECIFICATIONS

MAINTENANCE TESTING SPECIFICATIONS MTS-2001 Appendix B Frequency of Maintenance Tests MAINTENANCE SPECIFICATIONS FOR POWER DISTRIBUTION EQUIPMENT AND SYSTEMS InterNational Electrical Testing Association Inc. Quality Since 1972 Copyright

More information

Transfer switch OTEC and OTECSE open transition

Transfer switch OTEC and OTECSE open transition Specification sheet OTEC and OTECSE open transition 125-600 Amp Description OTEC transfer es are designed for operation and ing of electrical loads between primary power and standby generator sets. They

More information

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Robert P. Hansen, P.E., PhD GE Specification Engineer Introduction Switchboards are a widely used type of equipment

More information

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability?

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability? Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability? The 2005 NEC has new sections that require people transporting

More information

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

1. The term withstand means the unit will remain in place without separation of any parts from the device when subjected to the seismic forces. SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fusible switches. 2. Nonfusible switches. 3. Receptacle switches. 4. Shunt trip switches. 5.

More information

Electrical maintenance and testing guidelines! endre.

Electrical maintenance and testing guidelines! endre. Electrical maintenance and testing guidelines! endre. Introduction Scope: In industry today, it is common practice for management to overlook electrical equipment, particularly non-rotating machinery,

More information

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy ETAP 17 Goodyear, Suite 100 Irvine, CA 92618 White Paper No.001.14-2016 Albert Marroquin, PE Member

More information

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work Section 16435 - SWITCHBOARDS Introduction Part 1 - General Related Work Section 16070 Seismic Anchorage and Restraint Section 16075 Electrical Identification Section 16080 Power Distribution Acceptance

More information

Optimizing Emergency Power Systems for Health Care Applications

Optimizing Emergency Power Systems for Health Care Applications 2018 Annual Conference Optimizing Emergency Power Systems for Health Care Applications aka: Using the latest code changes to improve system reliability and maybe even save some $$$... Overview Michigan

More information

TIME REQUIREMENT GUIDE (TRG)

TIME REQUIREMENT GUIDE (TRG) CAT SWITCHGEAR TIME REQUIREMENT GUIDE (TRG) This warranty repair time requirement guide is designed to: Provide detailed guidance on troubleshooting Determine possible solutions Guide the technician to

More information

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE IMPLEMENT ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE Gemitech was founded in 1990 and, in just a few short years, grew to be recognized as medium and IMPLEMENT

More information

SECTION MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS. This section is organized as indicated below. Select desired Paragraphs.

SECTION MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS. This section is organized as indicated below. Select desired Paragraphs. SECTION 16904 MICROPROCESSOR TRIP UNITS FOR LV CIRCUIT BREAKERS PART 2 PRODUCTS 01 MANUFACTURERS A. B. C. Eaton * * The listing of specific manufacturers above does not imply acceptance of their products

More information

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931 Data Bulletin 0931DB0101 July 2001 Cedar Rapids, IA, USA Ground-Censor Ground-Fault Protection System Type GC Class 931 09313063 GT Sensor Shunt Trip of Circuit Interrupter Window Area for Conductors GC

More information

Stationary Battery Testing

Stationary Battery Testing Stationary Battery Testing STATIONARY BATTERY TESTING The stationary backup batteries are the life line in any safety system, a life line that simply cannot fail. In order to ensure safe operation it is

More information

ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS. UAE, Sharjah, Copthorne Hotel Sharjah

ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS. UAE, Sharjah, Copthorne Hotel Sharjah Training Course : ELECTRICAL EQUIPMENT : TRANSFORMERS, INVERTERS, RECTIFIERS, UNINTERRUPTABLE POWER SYSTEMS, GENERATORS Training Course For One Week In UAE, Sharjah, Copthorne Hotel Sharjah Which Be Held

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Acceptance Inspection Date of Review / / BLD20 - Project Address: Project Name: Numbers following worksheet comments represent an NFPA

More information

OTEC Transfer switch open transition

OTEC Transfer switch open transition Specification sheet OTEC Transfer switch open transition 40 1200 amp Description OTEC transfer switches are designed for operation and switching of electrical loads between primary power and Standby generator

More information

GPA 13.8 kv Semi-Annual Slip Ring PM, Sav 10-41

GPA 13.8 kv Semi-Annual Slip Ring PM, Sav 10-41 GPA 13.8 kv Semi-Annual Slip Ring PM, Sav 10-41 Crane number Contrator Job # Inspection date: GPA Work Order # Inspected by: Trolley Hour Meter Reading Crane Hour Meter Reading Gantry Hour Meter Reading

More information

Frequency of Maintenance Tests These specifications have been developed by the InterNational Electrical Testing Association for use by electrical power distribution system engineers. Copyright 2001 InterNational

More information

IN2 Enclosed Switches and Circuit Breakers

IN2 Enclosed Switches and Circuit Breakers Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Enclosed Switches and Circuit Breakers Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

APC Smart-UPS. GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply

APC Smart-UPS. GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply APC Smart-UPS GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply PART 1 - GENERAL 1.1 SUMMARY A. This specification describes the operation and functionality of a continuous

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin LowNOx Commercial Gas Electronic Spark Ignition Sequence

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin LowNOx Commercial Gas Electronic Spark Ignition Sequence The Universal TM gas LowNOx series water heaters contain an electronic spark ignition system. The heater is connected to a 120VAC power source required by the transformer. The transformer steps down the

More information

Bussmann series Quik-Spec Coordination Panelboard

Bussmann series Quik-Spec Coordination Panelboard Quik-Spec electrical gear 12 Contents Bussmann series Quik-Spec Coordination Panelboard Section page Description Quik-Spec Coordination Panelboards Up to 400 A 2 600 to 1200 A 3 Quik-Spec elevator disconnects

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

PREMIER POWER PACK INSTRUCTION MANUAL EN54-4 POWER SUPPLY UNIT INSTRUCTION MANUAL. GLT.MAN-138 Issue: /05/2016 N.R.P.J.

PREMIER POWER PACK INSTRUCTION MANUAL EN54-4 POWER SUPPLY UNIT INSTRUCTION MANUAL. GLT.MAN-138 Issue: /05/2016 N.R.P.J. EN54-4 POWER SUPPLY UNIT INSTRUCTION MANUAL GLT.MAN-138 CONTENTS Introduction to the Premier Power Pack PSU... 2 Changes to EN54-4 (The Fire Alarm Equipment Power Supply Standard)... 3 Indications... 4

More information

TABLE OF CONTENTS. Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2

TABLE OF CONTENTS. Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2 TRIPP Model D ELECTRICAL TABLE OF CONTENTS Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2 LVDT Setup/Adjustments...2 Basic Troubleshooting...3

More information

V. Design, Application, Maintenance & Operation Technical Requirements

V. Design, Application, Maintenance & Operation Technical Requirements V. Design, Application, Maintenance & Operation Technical Requirements V.L Line & Substation Operation and Maintenance 1.0 General Requirements 1.1 Each facility owner shall have an established and documented

More information

N Daily Weekly Monthly Every 3 months. Every 6 months 1 Remove any materials not related

N Daily Weekly Monthly Every 3 months. Every 6 months 1 Remove any materials not related MV / LV cabins maintenance The operation and maintenance of the cabins are meant to ensure high reliability (i.e. the early detection of anomalies, the failure prevention and monitoring functional) and

More information

PRACTICAL TROUBLESHOOTING OF ELECTRICAL EQUIPMENT & CONTROL SYSTEMS

PRACTICAL TROUBLESHOOTING OF ELECTRICAL EQUIPMENT & CONTROL SYSTEMS Training Title PRACTICAL TROUBLESHOOTING OF ELECTRICAL EQUIPMENT & CONTROL SYSTEMS Training Duration 5 days Training Venue and Dates Practical Troubleshooting Of Electrical Equipment & Control Systems

More information

your Green Power WIND POWER SOLUTIONS only Greener

your Green Power WIND POWER SOLUTIONS only Greener your Green Power WIND POWER SOLUTIONS only Greener WIND POWER SOLUTIONS Thomas & Betts is committed to being your partner in power delivery by leading the industry in innovative wind power solutions and

More information

Power System Solutions (PSS)

Power System Solutions (PSS) About Power System Solutions mission The Power System Solutions Mission Statement To achieve customer satisfaction by providing innovative solutions to improve upon power quality, energy efficiency, and

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

4-Day Power System Analysis, Coordination, System Studies

4-Day Power System Analysis, Coordination, System Studies 4-Day Power System Analysis, Coordination, System Studies Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Our

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

SECTION SWITCHGEAR. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION SWITCHGEAR. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes metal-enclosed,

More information

16.13 Unit Substation to 15kV Construction Standards Page 1 of 7

16.13 Unit Substation to 15kV Construction Standards Page 1 of 7 Construction Standards Page 1 of 7.1 General.1 New buildings are to be provided with an indoor unit substation designed to accept 15kV and 25kV primary voltages, however, the primary voltage connected

More information

Arc flash hazard mitigation

Arc flash hazard mitigation Low Voltage Products Arc flash hazard mitigation Each year more than 2,000 people are treated in burn centers with severe arc flash injuries. ABB designs and manufactures products and solutions to provide

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 ENCLOSED SWITCHES AND PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following individually mounted, enclosed switches and circuit breakers rated 600V AC and less: 1. Fusible switches.

More information

Quick Start Guide TS 910

Quick Start Guide TS 910 Quick Start Guide TS 910 DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read and understand this quick start guide before installing and operating the transfer switch The installer is responsible

More information

Foreword

Foreword Foreword Content 1. Summary 2. Safety instruction Safety Symbol Indication Attention Static discharge sensitive Electric shock Dangerous Indicate risk of serious injury or death or seriously damage the

More information

IEEE IAS Atlanta Chapter

IEEE IAS Atlanta Chapter Stationary Battery Sizing IEEE IAS Atlanta Chapter Presented by: Lesley Varga, P.E. Quality Standby Services, LLC 1649 Sands Place, SE, Suite C Marietta, GA 30067 (770) 916-1747 lesley@qualitystandbyservices.com

More information

MEDIUM-VOLTAGE SWITCHGEAR

MEDIUM-VOLTAGE SWITCHGEAR REVISION RECORD SECTION 16341 Medium-Voltage Switchgear REV DATE PAGE PARA NO. DESCRIPTION APPROVED BY 28SEP01 ALL Initial issue. 1 29SEP03 ALL General update with miscellaneous changes in entire document.

More information

TABLE OF CONTENTS. Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2

TABLE OF CONTENTS. Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2 TRIPP Model B ELECTRICAL TABLE OF CONTENTS Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2 LVDT Setup/Adjustments...2 Basic Troubleshooting...3

More information

SECTION MOTOR CONTROLLERS

SECTION MOTOR CONTROLLERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 11 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // ---- // if not applicable to project. Also, delete any other item or paragraph

More information

Metal-Enclosed Switches. Medium Voltage. Medium Voltage Metal-Enclosed Switches Contents

Metal-Enclosed Switches. Medium Voltage. Medium Voltage Metal-Enclosed Switches Contents January 2003 Vol. 1, Ref. No. [1011] -1 Medium Voltage Metal-Enclosed Switches Contents Description Page MVS................................... -2 and Breaker MSB........................ -3 Metal-Enclosed

More information

TYPE KF UNDER-FREQUENCY RELAY A. Figure 1: Type KF Relay for 60 Hertz without Case. (Front & Rear View.) Front View Rear View

TYPE KF UNDER-FREQUENCY RELAY A. Figure 1: Type KF Relay for 60 Hertz without Case. (Front & Rear View.) Front View Rear View 41-503.21A TYPE KF Front View Rear View Figure 1: Type KF Relay for 60 Hertz without Case. (Front & Rear View.) 2 TYPE KF 41-503.21A lower pin bearing, which is mounted on the frame, with respect to the

More information

Medium Voltage Metal-Enclosed Switches

Medium Voltage Metal-Enclosed Switches Medium Voltage Metal-Enclosed Switches Outdoor Medium Voltage Switch.1 Medium Voltage Switch MVS Product Description............................................. 2 Application Description..........................................

More information

DO-III Fuse Holder TPL , May 2000, Page 1 of 4. General Information on the DO-III Draw Out Load Break Expulsion Fuse Holder. ABB Inc.

DO-III Fuse Holder TPL , May 2000, Page 1 of 4. General Information on the DO-III Draw Out Load Break Expulsion Fuse Holder. ABB Inc. DO-III DO-III Fuse Holder TPL 44-835, May 2000, Page 1 of 4 General Information on the DO-III Draw Out Load Break Expulsion Fuse Holder ABB Inc. General Description The ABB DO-III fuse holder is a draw

More information

FUSES VERSUS CIRCUIT BREAKERS FOR LOW VOLTAGE APPLICATIONS

FUSES VERSUS CIRCUIT BREAKERS FOR LOW VOLTAGE APPLICATIONS FUSES VERSUS CIRCUIT BREAKERS FOR LOW VOLTAGE APPLICATIONS Copyright Material Mersen BY STEVE HANSEN, BYRON JORDAN, MIKE LANG, AND PETER WALSH I. INTRODUCTION This paper discusses the differences between

More information

Quick Start Guide TS 910 & TS 920

Quick Start Guide TS 910 & TS 920 Quick Start Guide TS 910 & TS 920 DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read and understand this quick start guide before installing and operating the transfer switch The installer

More information

Medium Voltage Metal-Enclosed Switches

Medium Voltage Metal-Enclosed Switches Medium Voltage Metal-Enclosed Switches Outdoor Medium Voltage Switch.1 Introduction Product Selection Guide....................................2 Medium Voltage Switch MVS Product Description......................................

More information

Zone Selective Interlocking

Zone Selective Interlocking Application Paper AP02602002EN Supersedes 08/2003 Zone Selective Interlocking Contents Description.... Page What is Zone Selective Interlocking?... 3 What is the purpose of Zone Selective Interlocking?....3

More information

7. SERVICES OVER 600 VOLTS

7. SERVICES OVER 600 VOLTS 7. SERVICES OVER 600 VOLTS 7.1 GENERAL The Company shall always be consulted to obtain required design criteria where service is contemplated.preliminary plans of the Customer shall be submitted for review

More information

ASCO Low Voltage Automatic Transfer Switch Systems

ASCO Low Voltage Automatic Transfer Switch Systems ASCO Low Voltage Automatic Transfer Switch Systems Suitable for Emergency, Peak and Prime Power System Applications ASCO s experience and commitment to excellence in designing and building Emergency Power

More information

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications PART 1 GENERAL 1.1 SUMMARY A. The Defender Mini CLI specification describes a single phase, online, solid state Lighting

More information

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types: SECTION 262913 600 VOLT ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification

More information

Tradition. Technology. Innovation.

Tradition. Technology. Innovation. Tradition. Technology. Innovation. 2 Tradition. Technology. Innovation. 50433 IEM CorpBror1.indd 2 4/3/15 2:41 PM Today, IEM has expanded beyond Silicon Valley to supply specialized electrical equipment

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5 DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5 1.1. APPLICABLE PUBLICATIONS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this

More information

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8 , Chapter 8 as amended by CCR, Title 19 Page 1 of 8 Address: City: Date of Pump Test: Shaft Orientation: Horizontal Vertical Annual Fire Pump Test Results Number of pumps at this location: If multiple

More information

3.0 CHARACTERISTICS E Type CO-4 Step-Time Overcurrent Relay

3.0 CHARACTERISTICS E Type CO-4 Step-Time Overcurrent Relay 41-106E Type CO-4 Step-Time Overcurrent Relay A core screw accessible from the top of the switch provides the adjustable pickup range. The IIT contacts are connected in the trip circuit to trip instantaneously.

More information

Modular medium-voltage switchgear. NorMax

Modular medium-voltage switchgear. NorMax Modular medium-voltage switchgear NorMax NorMax MODULAR MEDIUM-VOLTAGE SWITCHGEAR 2 NorMax Modular medium-voltage switchgear Contents Subject Page Table of contents 2 Introduction and main features 2 Technical

More information

Electromagnetic Industries LLP

Electromagnetic Industries LLP GROUND FAULT CURRENT DETECTION GFM Relay (Model 252 & 262) The GFM system is designed for electrical protection, not for personnel protection Application: These Class 1 (Model GFM) Ground Fault protection

More information

User Manual 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER

User Manual 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER User Manual 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER CONTENTS ABOUT THIS MANUAL... 1 Purpose... 1 Scope... 1 SAFETY INSTRUCTIONS... 1 INTRODUCTION... 2 Features... 2 Basic System Architecture... 2 Product Overview...

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

Integrated Inverter/Battery Monitoring System (IBMS)

Integrated Inverter/Battery Monitoring System (IBMS) Integrated Inverter/Battery Monitoring System (IBMS) Battery monitoring at its finest Maintenance Bypass Switch Input AC to DC Converter DC to AC Inverter Static Bypass Switch Output Operations: Normal

More information

UL and CSA Requirement for LED Tubes and LED Bulbs. UL Safety for LED Tubes and Bulbs

UL and CSA Requirement for LED Tubes and LED Bulbs. UL Safety for LED Tubes and Bulbs UL and CSA Requirement for LED Tubes and LED Bulbs UL Safety for LED Tubes and Bulbs Version and Validation UL effective date: December 4, 2012 UL transition period to: December 4, 2015 2 Enclosure Requirement

More information

Remote Temperature Controller for Heated Mold Shoes, using a RTD/Digital Display, # C (version pre-2009).

Remote Temperature Controller for Heated Mold Shoes, using a RTD/Digital Display, # C (version pre-2009). Knowledge Base Article Type: Instructions Remote Temperature Controller for Heated Mold Shoes, using a RTD/Digital Display, #601127.C (version pre-2009). Description: Instructions on How to properly set-up

More information

Transformer Protection

Transformer Protection Transformer Protection Course No: E01-006 Credit: 1 PDH Andre LeBleu, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com

More information

Low Voltage Automatic Transfer Switch Systems

Low Voltage Automatic Transfer Switch Systems Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in

More information

SECTION MOTOR CONTROLLERS

SECTION MOTOR CONTROLLERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 11 MOTOR CONTROLLERS SPEC WRITER NOTE: Delete between // ---- // if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) (Corr.1 June 2018) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements

More information

Protective Link Expulsion Fuse Type Prolink, Oil Immersed, PTAP-APR925 IZUA Technical Guide 15 kv, 23 kv, & 35 kv

Protective Link Expulsion Fuse Type Prolink, Oil Immersed, PTAP-APR925 IZUA Technical Guide 15 kv, 23 kv, & 35 kv Protective Link Expulsion Fuse Type Prolink, Oil Immersed, PTAP-APR925 IZUA 5670-100 Technical Guide 15 kv, 23 kv, & 35 kv General Description The Protective link is an oil immersed, expulsion type, fuse

More information

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version MD10 Engine Controller Installation and User Manual for the MD10 Engine Controller. Full Version File: MartinMD10rev1.4.doc May 16, 2002 2 READ MANUAL BEFORE INSTALLING UNIT Receipt of shipment and warranty

More information

Sentry Battery Charger. Installation and Operations Manual Section 75

Sentry Battery Charger. Installation and Operations Manual Section 75 Sentry Battery Charger Installation and Operations Manual 00-02-0616 03-03-08 Section 75 In order to consistently bring you the highest quality, full featured products, we reserve the right to change our

More information

GP/GPA GROUND FAULT PROTECTION

GP/GPA GROUND FAULT PROTECTION GP/GPA GROUND FAULT PROTECTION GROUND FAULT PROTECTION C-220EM Instruction Manual, June 2015 ABOUT I-GARD I-Gard s commitment to electrical safety provides both industrial and commercial customers with

More information

NETWORK ELECTRICAL TECHNOLOGY LLC

NETWORK ELECTRICAL TECHNOLOGY LLC 2016 NETWORK ELECTRICAL TECHNOLOGY LLC Sameh Al-Sinani Network Electrical Technology 12/1/2016 Network Electrical Technology established in 2010 as Electrical Services Company. In 2014 NET registered in

More information

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Main Service s INTRODUCTION by Robert E. Fuhr, P.E. The use of electronic equipment has dramatically increased

More information

Illuminator Series CM. GUIDE SPECIFICATIONS And TECHNICAL DESCRIPTION. 500W, 1000W, 1500W and 2000W Single-Phase Emergency Power System

Illuminator Series CM. GUIDE SPECIFICATIONS And TECHNICAL DESCRIPTION. 500W, 1000W, 1500W and 2000W Single-Phase Emergency Power System Illuminator Series CM GUIDE SPECIFICATIONS And TECHNICAL DESCRIPTION 500W, 1000W, 1500W and 2000W Single-Phase Emergency Power System This description contains all the necessary functional and technical

More information

COM Overcurrent Relay

COM Overcurrent Relay 41-102.1B COM Overcurrent Relay Figure 1: COM-5 Class 1E Relay (Front View) 9664A28 Photo Figure 2: COM-5 Class 1E Relay (Rear View) 9664A29 Photo Photo needed here 2 COM Overcurrent Relay 41-102.1B 3

More information

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY PART B-04 TITLE: DISTRIBUTION SUBSTATIONS SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 2 YEAR PERIOD) AMENDMENTS/REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

Illuminator Series CR NEMA 3R

Illuminator Series CR NEMA 3R Illuminator Series CR NEMA 3R GUIDE SPECIFICATIONS And TECHNICAL DESCRIPTION For 3.0, 4.0, 5.0, 6.5, 8.0kVA / kw Series CR - Single Phase Uninterruptible Power System This description contains all the

More information

Now - Up To 400A Mains!

Now - Up To 400A Mains! Quik-Spec Family Specification has never been easier or faster for the distribution products you need to achieve selective coordination, and improve electrical system safety and performance Quik-Spec Coordination

More information

User Manual 4KVA/ 5KVA INVERTER / CHARGER. With MPPT Controller

User Manual 4KVA/ 5KVA INVERTER / CHARGER. With MPPT Controller User Manual 4KVA/ 5KVA INVERTER / CHARGER With MPPT Controller CONTENTS ABOUT THIS MANUAL... 1 Purpose... 1 Scope... 1 SAFETY INSTRUCTIONS... 1 INTRODUCTION... 2 Features... 2 Basic System Architecture...

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

Transfer switch OTEC open or delayed transition

Transfer switch OTEC open or delayed transition Transfer switch OTEC open or delayed transition 40-1000 Amp Description OTEC transfer switches are designed for operation and switching of electrical loads between primary power and standby generator sets.

More information

twin engine two battery bank split charge system

twin engine two battery bank split charge system twin two battery bank split charge system P2331 12 volt. P2331 part number. 12331-0 24 volt. P2341 part number. 12341-0 contactor current rating continuous... 0 amp @ mv / contact / 0 A start... 0 amp

More information

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers The National Electrical Code makes the following statement regarding ground fault conformance testing:

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

High Voltage Electrical Maintenance Training

High Voltage Electrical Maintenance Training High Voltage Electrical Maintenance Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq High Voltage Electrical

More information

Design considerations for generator set mounted paralleling breakers

Design considerations for generator set mounted paralleling breakers Our energy working for you. Design considerations for generator set mounted paralleling breakers White Paper Hassan Obeid, Application Group Cummins Power Generation Cummins Power Systems has been delivering

More information

take to complete our safety compliance

take to complete our safety compliance This presentation is one of three steps you will take to complete our safety compliance requirements ECR Energizer Contractor Representative Primaryliaison between Energizer and the contractor for matters

More information

BREAKER FAILURE PROTECTION

BREAKER FAILURE PROTECTION 29 th Annual HANDS-ON RELAY SCHOOL March 12-16, 2012 BREAKER FAILURE PROTECTION Brent Carper, PE Protection & Integration Engineer brent.c@relayapplication.com OUTLINE Protection System Failures and Breaker

More information