1 Selective Coordination Compliance Methods for Evaluation and Mitigation Dave Bradley, PE, LEED AP August 8, 2008 New requirements for Selective Coordination became a part of the National Electrical Code in Since then the topic has been often misunderstood, avoided, discussed and debated. Selective Coordination is an enforceable code requirement in many areas, and as such is also a design requirement. This document will attempt to give the engineer and designer basic background, methodology and mitigation methods to assist in designing to these new requirements. BACKGROUND What is selective coordination? Selective coordination is a design requirement where only the overcurrent device immediately upstream from the fault will operate, minimizing the outage caused by the fault NEC Article 100 defines Coordination (Selective) as Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the choice of overcurrent protective devices and their ratings or settings. In the diagram below, only device C would open under the fault. For selective coordination, the system would be designed so that for a fault of any magnitude (up to the available fault current at device C) device C is guaranteed to clear the fault with neither B nor A opening. What do the new code sections say? In addition to the definition above, new requirements were added in the 2005 and 2008 National Electrical Code to Article Emergency Systems (see ), Article Legally Required Standby Systems (see ), and by the 2008 NEC to Article Critical Operations Power Systems (COPS) (see ). These Articles also apply to Health Care Facilities as noted in The new requirements state that the overcurrent devices of those systems shall be selectively coordinated with all supply side overcurrent protective devices. There is also a clarification on the scope of the required coordination for in the 2008 National Electrical Code Handbook This coordination must be carried through each level of distribution that supplies power to the emergency system. What s different from the way we ve designed these systems for years? Prior to 2005, selective coordination was only required for some elevator applications by Article 620. Until the 2005 NEC, a properly coordinated system was generally regarded as ensuring the timely operation of Page 1

2 overcurrent devices to assure safety and protection of equipment (using damage curves) while minimizing nuisance trips. We ve tried to minimize nuisance trips as much as possible by ensuring that there was no overlap in coverage in the thermal region of the time-current curves, and by adjusting the instantaneous range for as little overlap as possible. However, some overlap almost always existed and was accepted. Most of us have heard of a nuisance trip or two in our careers, but probably not too many. To get two breakers to open simultaneously (or have only the upstream breaker open), a very low impedance fault would have to occur to supply a very high fault current. Low impedance faults almost always occur due to bus or cable wiring mistakes at the time of construction or during a repair these faults are quickly identified and remedied. The vast majority of real world faults are higher impedance and generally do not cause multiple breakers to operate. It is a safe bet that the building you are in right now has breakers with overlap in the instantaneous range of their time-current curves, and that virtually all the buildings you have designed in your career do as well. However, now in order to comply with the NEC for Sections 700, 701 and 708, the engineer needs to be able to prove, using curves or other manufacturer s data, that there is NO overlap in curves at the available fault current at that point in the system. Fuse vs. circuit breakers? Systems can, and are, being designed using either (or both) circuit breakers or fuses that selectively coordinate. In some cases fuses may more easily selectively coordinate than circuit breakers, however fuses still have inherent drawbacks that continue to make designing with circuit breakers the preferred method. These drawbacks include increased training of owners to safely replace fuses, requirement for spares and storage, single phasing, increased arc flash hazard and increased PPE requirements. Because circuit breaker design is by far more common, this paper will address system design using circuit breakers. Is it being enforced? There are several areas of the country that are currently enforcing selective coordination, and many more areas that are not these areas can begin active enforcement at any time, and it could start with your project tomorrow. If you are in an area that has not yet begun enforcement but has adopted the requirement, remember that the Engineer and his firm may still be liable if someone is injured due to a selective coordination accident for the life of the building, even if the code inspector did not enforce the requirement. Applicable codes vary by location be aware of the local requirements. Only areas that have adopted the 2005 or 2008 versions of the NEC will be affected by the changes discussed in this paper. There are also several municipalities, counties and states that have amended, or are in the process of amending, code requirements to modify or eliminate the NEC selective coordination requirements. Examples of proposed modifications include: requiring selective coordination only where determined practicable by the Engineer not requiring selective coordination of time current curves below 0.1 seconds eliminating the ability of the inspector to deny a Certificate of Occupancy based on noncompliance at the time of construction This is a period of change and adjustment in the industry, so you should always consult the code enforcement officer or authority having jurisdiction in the project location to make sure you are following the correct standards. What if I already call for coordination studies? Coordination studies are performed after construction so that the actual equipment, fault current levels, conductor lengths and trip settings can be used to evaluate the system coordination. In the past these Page 2

3 studies have allowed for proper adjustment of the breakers to minimize nuisance trips and establish the base system settings. However if the study indicates that there are areas that do not selectively coordinate (which is almost assured if not designed properly), it is too late to fix easily. All the study can do is to confirm that the system was designed in a non-compliant fashion. In many, if not most, cases redesign and replacement of many system components (switchboards, panelboards, ATS, etc.) will be required to meet NEC requirements and allow you to get a Certificate of Occupancy. Can I require the manufacturer to provide selectively coordinated breakers in the project specifications? No, and for several important reasons. There s no such thing as a selectively coordinated breaker, only two breakers that selectively coordinate at a given available fault current. In order to even evaluate if two breakers selectively coordinate, one must know the available fault current at each applicable point in the system. If the Engineer has provided the calculated available fault currents (not to be confused with AIC ratings) at each of the panels, it is possible to evaluate the sizes he has scheduled. Without these values, no evaluation can be made. If a breaker must increase in size to selectively coordinate (a very common and likely condition), a series of additional changes must occur that are outside the scope and ability of the contractor or manufacturer during the bidding period. The new breaker may not fit in the specified panel type and the new panel may not fit in the space anticipated by the engineer. In some cases rooms may need to be enlarged. The wiring and conduit size must change due to the increased breaker size the increased breaker size and the upsized conductor are design changes that must be approved by the Engineer. Other components that are not supplied by the manufacturer may also be required to change in size (automatic transfer switches, generators, etc.) these changes and their possible impact on space requirements can not be accounted for during the bidding period. The increased conductor size requires recalculation of the available fault current, which in turn may require another increase in breaker size only the Engineer can do these design calculations. In the majority of projects the bidding package drawings and specifications are never seen by the manufacturer. In most cases the contractor does the take-off and asks a distributor or manufacturer for a price on the bill of materials the contractor created. The Engineer can not delegate design responsibility to a contractor, distributor or manufacturer, especially during the bid period. In most states, sealed drawings require that the Licensed Engineer be in direct supervision of project designers and engineers that produced the contract documents. Page 3

4 NUTS & BOLTS How do I evaluate a system for compliance with NEC? Let s take a look at a very simple system and evaluate it for compliance with The riser above shows a 480V system with an automatic transfer switch (ATS) and a 35kW natural gas fueled generator. The main switchboard has a 2000A insulated case main circuit breaker, and has a 60A molded case circuit breaker feeding the 60A ATS. The ATS feeds a 100A main lug only panelboard with 20A branch circuit breakers that feed egress lights, exit signs and the fire alarm panel. The building has an occupancy that requires these emergency loads to meet the building code requirements, and the community has adopted the 2005 National Electrical Code. The Engineer has calculated the available fault current at the main switchboard to be 9,000A and the available fault current on the normal source at the emergency branch panelboard to be 900A. This is a typical design that many of us have done in the past (and may have out to bid right now). As shown, does this meet code? No. Let s evaluate it and see what has to change. We have the essential first piece of information the available fault currents computed by the Engineer (remember, the Engineer of record is the only person who can issue these values for design purposes). The first step is to evaluate the largest branch breaker in the emergency branch panel and the next supply side breaker (the 60A feeder in the main switchboard). You need to evaluate the largest breaker in the branch panel because that s the worst case it would be harder for the supply side breaker to coordinate with a 90A breaker than a 20A. Since a 20A branch is the largest in our example, we ll compare the curves for that and the 60A feeder. Page 4

5 We always evaluate breakers in pairs for selective coordination, and only look at the curve to the left of the available fault current. Imagine taking scissors and cutting the right side of the paper off at the current available at the downstream breaker if the curves on the left side of the available fault current do not overlap, the breakers selectively coordinate. The 20A (red) and 60A (orange) breaker curves shown above clear each other in the entire thermal range (curved part), however the instantaneous ranges begin to overlap at just under 600A. This makes sense, since a typical 60A molded case breaker will have an instantaneous pickup about 10 to 12 times its frame rating minus a +/- manufacturing tolerance (the width of the curve). Since we have 900A of available fault current in our example, we will need an upstream breaker that does not trip on instantaneous at that value the first breaker with an instantaneous pickup (left edge of the vertical section) above 1000A is a 125A (see green curve below). The 125A breaker will now selectively coordinate with the 20A branch at an available fault current value of 900A. Page 5

6 A - Our first change is to replace the 60A feeder breaker with a 125A breaker (the red A refers to the designation on Page 4). In this case, a 125A breaker will physically fit without problem in our switchboard, but had this been a regular branch panelboard with a maximum breaker size of 100A, a larger panel would have had to be installed. The next breaker pair that must selectively coordinate is the new 125A breaker and the next supply side overcurrent device, the 2000A main breaker. Comparing the curves below (125A green, 2000A blue), we see that these two breakers do selectively coordinate at 9,000A of available fault current (no overlap to the left of the available fault current at the downstream device), so no additional changes are needed. Note that these two curves actually do not overlap at any current, so they would selectively coordinate in any situation where the available fault current didn t exceed their AIC ratings. Page 6

7 B - There are now several things that must change due to increasing the size of that feeder breaker. The branch panel, a 100A, must now be increased in size to at least a 125A. Make sure there is space to mount this larger panelboard. C - The 60A ATS must also be increased in size so its rating is at least 125A. Remember to check for additional mounting space for the larger transfer switch. D - The conductor and conduit size between the feeder breaker and the ATS, and between the ATS and the branch panel must also change because of the increased size of the breaker. Now comes a fun part you must recalculate the available fault current at the branch panel because the conductor got larger, then recheck the curves to make sure the 20A branch breaker still selectively coordinates with the 125A feeder at the new, larger available fault current. Sometimes they will, sometimes they won t and you must upsize again. In our example they did coordinate so an additional increase is not needed. E - We have now modified the design to comply with code on the normal supply side. Now we must evaluate the emergency source side. On emergency source, the next supply side overcurrent device from the 20A branch is the 60A output circuit breaker at the generator. In most cases the Page 7

8 manufacturer of this breaker will be unknown, but for this exercise we ll assume it is the same as the 60A curves above. Will this 60A breaker selectively coordinate with the 20A? It all depends on the available fault current, in this case the fault current delivered by the generator. Since we need to evaluate these breakers in the instantaneous range of operation, we need to know the fault current the generator can produce in the 1-6 cycle range. To find this we must know the sub-transient reactance (not transient or steady state) of the alternator on the generator. This per unit value, X d, is available from the generator manufacturers and varies a good bit between alternators and generators. Once you obtain the value of X d, you divide the rated output current of the generator by this value and you will have the sub-transient available fault current at the generator output from this you can determine the available fault current at the branch panel. In our example (based on real values from an actual project) the generator provided 700A of fault current at the panel. The 60A output breaker curve overlaps the 20A at this value, so we must increase the size of the output breaker. The only problem is that the output breaker protects the alternator windings, so the only apparent alternative is F - increase the size of the generator so that the output breaker can get larger. A larger generator has a larger fault current and a different X d, and in the real world project a 50kW generator with its larger output breaker finally did selectively coordinate with the 20A branches. Anything else that can go wrong in the process of meeting code for this example? Remember to check to see if there was enough natural gas pressure at the jobsite to increase from 35kW to 50kW! The example has now been modified to meet National Electrical Code requirements. This example was of a small project with a relatively small available fault current from the utility. If the design were of a more complex system with a distribution level on the load side of the ATS, and 50,000A of available fault current at the service entrance, and had the same emergency requirements (60A), another selective coordination issue may appear. A large normal source available fault current can cause the breakers to grow very quickly. If we had 5,000A at our example branch panel instead of 1,000A, the feeder breaker would have grown from 125A (won t trip on 1,000A instantaneous) to a 600A (won t trip on 5,000A). There are methods given of reducing these growing breakers later in this paper, but many breakers will still have to increase in size in systems with high available currents. If the output breaker of the generator is less than twice the size of the largest downstream breaker (a reasonable ratio in many cases to keep the curves from overlapping) it will probably not selectively coordinate. Even though the output breaker only has to coordinate in the instantaneous range based on its own available fault current producing ability (X d), it still has to selectively coordinate with the downstream breakers in the thermal curve area. If we have a 125A breaker downstream of the 60A output breaker and we get a 70A fault, the output breaker will trip before the downstream breaker and we lose selective coordination. As pointed out by this example, the evaluation and correction of this design to meet code is something that can only be reasonably done by the Engineer during the design phase. If this project were to bid with the uncorrected drawings, and the specifications were written to require the manufacturer (or study provider) to provide selectively coordinated breakers, one can see that it is just about impossible to comply. If the project were to be built as shown and the code enforcement officer asked for proof of compliance before a Certificate of Occupancy would be given, one can easily add up the extras and liquidated damages resulting from making the changes A - F above in the field vs. on the drawing board. If someone gives you assurances that their breakers selectively coordinate without having evaluated the entire design with you, for the sake of your firm s name, insurance, and your license, make sure that you go through all the steps yourself before issuing drawings for bid. Page 8

9 MITIGATION What are some ways to design the system to meet code? The best way to design for selective coordination may be to change how we approach the design from the start. New ideas and methods will continue to appear as long as the requirements exist. There are many complex applications, such as hospitals, that will truly challenge the engineer, but there are also many smaller applications where mitigation is more easily achieved. Here are a few methods that may help mitigate some of the problems associated with selective coordination: Is selective coordination really needed? - Let s look again at our example. Selective coordination was required because of the presence of components covered under Section 700. If I called for the installation of unit equipment to provide the minimum allowable egress illumination and exit signage, and my fire alarm panel had an integral emergency power supply (as required for listing), I could have bid the project as drawn with no requirement for selective coordination. Here s why NEC states in part Unit equipment in accordance with (F) shall satisfy the applicable requirements of this article. For a simple installation such as our example, installing unit equipment satisfies the code requirements I can then install the generator and transfer switch to feed any loads I wish, even additional egress lighting in excess of the bare minimum provided by the unit equipment. This approach will not be reasonable for large projects, but may be perfectly applicable to many smaller ones. Minimize the emergency system. - Carefully evaluate the loads on the emergency ATS. Have only the loads required by 700 and 701 (and 708 if applicable) on the emergency transfer switch. Optional loads may then be supplied by a second ATS. Smaller loads with smaller overcurrent devices are easier to selectively coordinate than larger ones. Use less levels of distribution. - Fewer levels are far simpler to coordinate. The fewest is achievable by feeding the ATS from a second main disconnect (one of the six allowable). That provides the smallest load with the smallest conductor running the longest distance which minimizes the available fault current to the emergency side and further facilitates selective coordination. Use turned down solid state circuit breakers. - Molded case circuit breakers are required to have instantaneous devices, and in the majority of devices this pick-up level is times the breaker s frame size. If you have a circumstance where you need a larger breaker for its higher instantaneous pick-up but really want a smaller breaker, consider adjustable solid state breakers. For example, 175A breaker will have an instantaneous curve where the leading edge (left side) picks up at about 900A. As an alternative you can take a 600A solid state breaker with a 0.3x long time setting (180A) and turn the instantaneous setting to maximum the left edge is now at 5,000A. Use insulated case circuit breakers for high fault current applications. - You may find that fault currents are so high that coordinating the instantaneous band with molded case breakers is impractical. Using an insulated case breaker (available in both switchboard and switchgear versions) in many cases allows you to turn off the instantaneous range simplifying selective coordination. These are larger, higher end breakers and should be evaluated by the Engineer for practicality. Use special breakers. - There are some circuit breakers whose curves have shorter instantaneous feet, such as the Siemens NGB breaker. These make coordination easier than standard breakers, but they must be specifically called for by the Engineer. Page 9

10 Use transformation to reduce high available fault currents. - If you have a very high normal source available fault current it can make selective coordination very difficult. Inserting an isolation transformer or step down transformer will immediately limit the downstream available fault current to a more manageable level. There is, however, a catch to using transformers in any selective coordination application. The code required secondary overcurrent device for three phase transformers is almost always too small to selectively coordinate with any other breakers in that panel. For example, a 75kVA 480V transformer has a rated output of about 90A, an available fault current at 4.5% of about 2,000A, and a maximum secondary overcurrent device of 125A. Even if you use the actual primary available fault current to calculate the secondary fault current, you still can t selectively coordinate with a typical 20A branch breaker. This is a perfect application for an adjustable solid state breaker for the secondary protection. What information and aids are available from manufacturers? There are aids available from all the manufacturers to assist the Engineer. Curves - Most manufacturers provide time-current curves for all their breakers. Siemens provides their curves in electronic form in its EasyTCC software available for free download on its website (don t forget the www2). This software allows the user to overlay curves and adjust all settings for all Siemens circuit breakers. The example curves in this paper were created using EasyTCC. Charts - Charts are available which list, in varying styles, breakers that selectively coordinate with other breakers at specific available fault current levels. An advantage of the charts is that they are often more accurate than curve comparisons as they are based on more specific test data derived for selective coordination. If there is disagreement between overlaid curves and charts, the chart data should be used. These charts do not always list all breakers from the manufacturer. Siemens breaker coordination charts are available for download on its website and are included on the Siemens Design Assistant Disc. Tools - Siemens has developed a Selective Coordination Tool (part of the Available Fault Current Tool) to assist in designing code compliant systems. This tool provides very conservative (and more likely to be competitively biddable) sizing for design. It is available for free download on Siemens website and is included on the Siemens Design Assistant Disc. What else should I be aware of as the Engineer? The rules changed slightly from the 2005 to the 2008 NEC regarding overcurrent devices in series. It was observed, and changed in 2008, that devices in series of the same ampere rating and the primary and secondary overcurrent devices for transformer protection may not themselves selectively coordinate, but do not affect the selective coordination of the system (the scope of the outage is not increased by the upstream device or both devices operating). However, if your project is still governed by 2005 code make sure that the AHJ will accept the variance if you use the 2008 rules. Arc flash hazard is also a much discussed topic recently, and it should be. There are people injured each day from arc flash incidents, including contractors, building occupants, and even consulting engineers. Some important variables that determine arc flash energy are the voltage (can t change that), the current (can t do much about that) and the duration of the flash (this we have some control over). In reducing arc flash energy the object is to drive the overcurrent devices feeding the arc fault into their instantaneous operation as soon as possible to more quickly extinguish the arc. High available fault currents are actually better for this application because overcurrent devices can be driven into their instantaneous ranges and clear more quickly. Even though it sounds backwards, low available fault currents will actually increase the arc flash energies in many circumstances because overcurrent devices may stay in the thermal range of operation allowing the arc to stay lit longer. Ironically, the same attributes that make thermal magnetic breakers harder to apply in selective coordination applications can make them more suited for arc flash hazard reduction. Accepted methods of reducing arc flash energy include Page 10

11 lowering the instantaneous pick-up of adjustable breakers (moving the instantaneous band to the left) and having overlap in the instantaneous ranges of multiple breakers. Contrast these goals to the goals of selective coordination design it mandates that there be no overlap in operation, and to do that the engineer will deliberately keep the instantaneous settings as high as possible and limit the available fault current in the system to facilitate coordination. Once again the Engineer must decide between the two extremes of design better coordination (higher pickup values, longer clearing times, less nuisance trips) or greater safety (lower pickup values, shorter clearing times, more nuisance trips). In the case of selective coordination, however, there is now a code requirement to bias the design in favor of coordination. What s the conclusion? Selective coordination is a requirement in most areas of the country for emergency systems, and barring legislation that modifies or eliminates it, will be a requirement in the future. The only person who can plan and design a system to comply with this requirement is the Engineer responsibility for selecting components can not be passed on to the contractor or supplier. There is technical help available to the Engineer and designer. Use these early days of enforcement and compliance to change your design approach and meet the required codes do not let your firm be the first to be exposed to liability when a code that has been in effect for the past several years begins to be enforced in your area tomorrow morning. National Electrical Code and NEC are registered trademarks of the National Fire Protection Association by Siemens Energy & Automation Page 11

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability?

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability? Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability? The 2005 NEC has new sections that require people transporting

More information

Selective Coordination

Selective Coordination Circuit Breaker Curves The following curve illustrates a typical thermal magnetic molded case circuit breaker curve with an overload region and an instantaneous trip region (two instantaneous trip settings

More information

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections One-Line / Riser Diagrams Drawings are not reviewed prior to submission. Because of

More information

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards Robert P. Hansen, P.E., PhD GE Specification Engineer Introduction Switchboards are a widely used type of equipment

More information

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers

Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Utility Main Service Transformers Power Quality and Protective Device Coordination: Problems & Solutions Part 1 Undersizing of Main Service s INTRODUCTION by Robert E. Fuhr, P.E. The use of electronic equipment has dramatically increased

More information

Optimizing Emergency Power Systems for Health Care Applications

Optimizing Emergency Power Systems for Health Care Applications 2018 Annual Conference Optimizing Emergency Power Systems for Health Care Applications aka: Using the latest code changes to improve system reliability and maybe even save some $$$... Overview Michigan

More information

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton Advances in technology to address safety Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton 1 Advances in technology could mean use existing technology & back to basics Advances in safety are

More information

Selective Coordination Requirements

Selective Coordination Requirements Selective Coordination Requirements Background Selective coordination of all upstream overcurrent protective devices in the supplying circuit paths is required by the NEC for a limited number of specific

More information

Applying Interrupting Rating: Circuit Breakers

Applying Interrupting Rating: Circuit Breakers Series Rating: Protecting Circuit Breakers Generally, a circuit breaker should not be applied where the available shortcircuit current at its line side terminals exceeds the circuit breaker s interrupting

More information

Selective Coordination Enforcement:

Selective Coordination Enforcement: Selective Coordination Enforcement: Overcurrent Protective Device Basics by Tim Crnko The Basics of Selective Coordination Merely having a higher ampere overcurrent protective device (OCPD) feeding a lower

More information

Alternator protection, part 1: Understanding code requirements

Alternator protection, part 1: Understanding code requirements Power topic #6002 Part 1 of 3 Technical information from Cummins Power Generation Alternator protection, part 1: Understanding code requirements > White paper By Gary Olson, Technical Counsel This paper

More information

Evaluating Selective Coordination Between Current-Limiting Fuses And Non Current-Limiting Circuit Breakers

Evaluating Selective Coordination Between Current-Limiting Fuses And Non Current-Limiting Circuit Breakers Evaluating Selective Coordination Between And Non Current-Limiting Circuit Breakers Tech Topics: Selective Coordination Note 1, Issue 1 Steve Hansen Sr. Field Engineer Robert Lyons Jr. Product Manager

More information

Applying Interrupting Rating: Circuit Breakers

Applying Interrupting Rating: Circuit Breakers The professional engineer must be qualified by primarily working in the design or maintenance of electrical installations. Documents on the selection shall be stamped and available to all necessary parties.

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

Load Side PV Connections

Load Side PV Connections Perspectives on PV Load Side PV Connections 705.12(D) in the 2014 NEC by John Wiles Through the exceptional efforts of the members of NFPA NEC Code-Making Panel 4 working with the proposals and comments

More information

Evaluating Selective Coordination Between

Evaluating Selective Coordination Between Evaluating Selective Coordination Between Current-Limiting Fuses And Non Current- Limiting Circuit Breakers selective coordination note 1 By Steve Hansen Sr. Field Engineer and Robert Lyons Jr. Product

More information

Installation and Construction Notes for EVSE4

Installation and Construction Notes for EVSE4 Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process

More information

Service Entrance Methods

Service Entrance Methods Service Section Typical switchboards consist of a service section, also referred to as the main section, and one or more distribution sections. The service section can be fed directly from the utility

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I recently installed a 45-KVA transformer, 480-volt primary

More information

3.2. Current Limiting Fuses. Contents

3.2. Current Limiting Fuses. Contents .2 Contents Description Current Limiting Applications................. Voltage Rating.......................... Interrupting Rating....................... Continuous Current Rating................ Fuse

More information

ECET Distribution System Protection. Overcurrent Protection

ECET Distribution System Protection. Overcurrent Protection ECET 4520 Industrial Distribution Systems, Illumination, and the NEC Distribution System Protection Overcurrent Protection One of the most important aspects of distribution system design is system protection.

More information

Engineering Dependable Protection

Engineering Dependable Protection Electrical Distribution System Engineering Dependable Protection Engineering Dependable Protection - Part II "Selective Coordination of Overcurrent Protective Devices" Table of Contents Page Basic Considerations

More information

www. ElectricalPartManuals. com Engineering Dependable Protection

www. ElectricalPartManuals. com Engineering Dependable Protection Electrical Distribution System Engineering Dependable Protection Engineering Dependable Protection - Part II "Selective Coordination of Overcurrent Protective Devices" Table of Contents Page Basic Considerations

More information

Design Standards NEMA

Design Standards NEMA Design Standards Although several organizations are involved in establishing standards for the design, construction, and application of motor control centers, the primary standards are established by UL,

More information

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

90.2 Scope. The installation of electrical conductors, equipment and raceways for: NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors

More information

Electrical safety and reliability: Selective coordination. Protect with selective coordination

Electrical safety and reliability: Selective coordination. Protect with selective coordination Electrical safety and reliability: Selective coordination Protect with selective coordination Safe, reliable and cost-effective power distribution Commercial, healthcare and industrial facilities require

More information

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals?

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals? White paper Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals? Darryl Moser, Business Development Manager, DEM Sales, ABB, Electrification Products Division

More information

Design considerations for generator set mounted paralleling breakers

Design considerations for generator set mounted paralleling breakers Our energy working for you. Design considerations for generator set mounted paralleling breakers White Paper Hassan Obeid, Application Group Cummins Power Generation Cummins Power Systems has been delivering

More information

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc. Chapter 3 TRANSMISSION SYSTEMS 1 Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution

More information

Recommended Procedures

Recommended Procedures Selective Coordination Study Recommended Procedures The following steps are recommended when conducting a selective coordination study.. One-Line Diagram Obtain the electrical system one-line diagram that

More information

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work Section 16435 - SWITCHBOARDS Introduction Part 1 - General Related Work Section 16070 Seismic Anchorage and Restraint Section 16075 Electrical Identification Section 16080 Power Distribution Acceptance

More information

MOLDED CASE CIRCUIT BREAKER BASICS. David Castor, P.E.

MOLDED CASE CIRCUIT BREAKER BASICS. David Castor, P.E. MOLDED CASE CIRCUIT BREAKER BASICS David Castor, P.E. History of MCCBs 1904 - Cutter Manufacturing Co., Philadelphia, produces circuit breakers. They called it the Inverse Time Element breaker, or I-T-E

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TRANSMISSION SYSTEMS

TRANSMISSION SYSTEMS TRANSMISSION SYSTEMS Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution of electric

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 ENCLOSED SWITCHES AND PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following individually mounted, enclosed switches and circuit breakers rated 600V AC and less: 1. Fusible switches.

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor Reducing Arc Flash Energies on Transformer Secondaries arc flash note 6 By Mike Lang, principal field engineer and Dave Komm, Technical Services Supervisor 1. Introduction Arc flash incident energy calculations

More information

Selective Coordination

Selective Coordination Introduction and Requirements 5 NEC Code: Definitions 240.12 517.17(B) Healthcare 517.26 Healthcare 620.62 Elevators 700.27 Emergency Systems 701.18 Legally Required Standby Systems What Is Selective Coordination?

More information

Grounding Of Standby & Emergency Power Systems

Grounding Of Standby & Emergency Power Systems July / August 2007 ELECTRICAL LINE 53 Grounding Of Standby & Emergency Power Systems By Andrew Cochran Power continuity is essential in many industrial and commercial installations where a trip out due

More information

Busway. Siemens STEP 2000 Course. STEP 2000 Courses distributed by

Busway. Siemens STEP 2000 Course. STEP 2000 Courses distributed by Siemens STEP 2000 Course Busway It's easy to get in STEP! Download any course. Hint: Make sure you download all parts for each course and the test answer form. Complete each chapter and its review section

More information

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith University of California, San Diego Cal (IT) 2 Technical Assignment #2 Brian Smith Advisor: Dr. Moeck 31 October 2005 Brian Smith Lighting/Electrical Option University of California, San Diego Cal (IT)

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under

More information

NEC REQUIREMENTS FOR GENERATORS

NEC REQUIREMENTS FOR GENERATORS PROFESSIONAL DEVELOPMENT SEMINAR SERIES NEC REQUIREMENTS FOR GENERATORS (Based on NEC 2005 with limited 2008 commentary) AIA certified Continuing Education Units (CEU) Available GPS-140 National Electric

More information

Overcurrent Protection According to the 2011 NEC

Overcurrent Protection According to the 2011 NEC Overcurrent Protection According to the 2011 NEC Utah Electrical License This course will cover overcurrent protection according to the 2011 NEC. The key sections of Article 240 will be discussed. Overcurrent

More information

THE CURVE FOR DOUBLE PROTECTION TRANSFORMER & SYSTEM PROTECTION WITH CHANCE SLOFAST FUSE LINKS

THE CURVE FOR DOUBLE PROTECTION TRANSFORMER & SYSTEM PROTECTION WITH CHANCE SLOFAST FUSE LINKS THE CURVE FOR DOUBLE PROTECTION TRANSFORMER & SYSTEM PROTECTION WITH CHANCE SLOFAST FUSE LINKS CHANCE SLOFAST FUSE LINKS ARE DESIGNED FOR BOTH TRANSFORMER AND SYSTEM PROTECTION. For many years in the electric

More information

Learning Module 10: Loadcenters. 101 Basic Series

Learning Module 10: Loadcenters. 101 Basic Series Learning Module 10: Loadcenters 101 Basic Series What You Will Learn We ll step through each of these topics in detail: What Does a Loadcenter Do? 4 Applications 4 Basic Circuitry and Wiring 5 Residential

More information

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Data Bulletin March 2002 Lexington, KY, USA Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Table 1: Insulation Type Figure 1: Figure 2: Ampacity of a 1/0

More information

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy ETAP 17 Goodyear, Suite 100 Irvine, CA 92618 White Paper No.001.14-2016 Albert Marroquin, PE Member

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to

More information

Fuseology. Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression. Optima Fuse Holders & Overcurrent Protection Modules.

Fuseology. Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression. Optima Fuse Holders & Overcurrent Protection Modules. Fuseology Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression Optima Fuse Holders & Overcurrent Protection Modules Compact, full-featured modules that deliver Type 2 coordinated protection,

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 6 PROTECTIONS 1 FUNCTION OF ELECTRICAL PROTECTION SYSTEMS Problems:

More information

Why is the Breaker Tripping?

Why is the Breaker Tripping? Why is the Breaker Tripping? Breakers are designed to trip anytime the circuit draws a current above the rating for a period of time. The time the breaker takes to trip is a function of how high the circuit

More information

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H)

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H) 2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 263010-H: SUPPLEMENTAL PARALLELING GEAR (16315-H) Related Sections Basis Guideline: N/A For an explanation of

More information

CSDA Best Practice. Hi-Cycle Concrete Cutting Equipment. Effective Date: Oct 1, 2010 Revised Date:

CSDA Best Practice. Hi-Cycle Concrete Cutting Equipment. Effective Date: Oct 1, 2010 Revised Date: CSDA Best Practice Title: Hi-Cycle Concrete Cutting Equipment Issue No: CSDA-BP-010 : Oct 1, 2010 Revised : Introduction Hi-cycle/high frequency concrete cutting equipment has become more prevalent in

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications Sectionalizing Rick Seeling Introduction Philosophy Pete Malamen Three Phase Reclosers High-Side Protection Specific Applications History Early 1970 s Small Substation Transformers

More information

A case study in solving SCCR issues

A case study in solving SCCR issues White Paper 10601 Effective September 2016 A case study in solving SCCR issues By: Joe Graveline, Sr. application engineer, Eaton, Bussmann Division, and Erik Barnes, marketing manager, Eaton, Bussmann

More information

Joseph Lookup Senior Thesis 2005 Wegmans Fairfax. Section 2.0. Electrical Depth

Joseph Lookup Senior Thesis 2005 Wegmans Fairfax. Section 2.0. Electrical Depth Section 2.0 Electrical Depth 2.0 Electrical Depth 2.1 Introduction The electrical distribution system was analyzed to determine if any improvements could be made, to analyze its capabilities, to verify

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

Overcurrent protection

Overcurrent protection Overcurrent protection This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,

More information

Source-Side Fuse/Load-Side Recloser Coordination

Source-Side Fuse/Load-Side Recloser Coordination How to Coordinate ransformer Primary-Side Fuses with Feeder Reclosers Using Coordinaide M he S&C Protection and Coordination Assistant Part I: Conservative Method his is the first in a series of articles

More information

Battery Technology for Data Centers and Network Rooms: Site Planning

Battery Technology for Data Centers and Network Rooms: Site Planning Battery Technology for Data Centers and Network Rooms: Site Planning White Paper # 33 Executive Summary The site requirements and costs for protecting information technology and network environments are

More information

The purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection.

The purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection. 1 The purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection. Two learning objectives for this lab. We will proceed over the remainder

More information

Overcurrent Protection (2014 NEC) (Homestudy)

Overcurrent Protection (2014 NEC) (Homestudy) Overcurrent Protection (2014 NEC) (Homestudy) Oregon Electrical License The key sections of Article 240 will be discussed. Overcurrent protection for panelboards, appliances, motors, motor compressors,

More information

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers White Paper Ground Fault Application Guide WL Low Voltage Power Circuit Breakers Table of Contents Introduction 3 Need for ground fault tripping 3 Requirements from industry standards 3 National Electrical

More information

Zone Selective Interlock Module. For GE Circuit Breakers

Zone Selective Interlock Module. For GE Circuit Breakers GE Zone Selective Interlock Module For GE Circuit Breakers Table of Contents 1. Introduction... 4 What is Zone-Selective Interlocking (ZSI)?...4 What is a Zone-Selective Interlock Module?...4 2. Description...

More information

Electrical Depth. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC CURRENT SYSTEM

Electrical Depth. Mark W. Miller Sibley memorial Hospital Grand Oaks Washington, DC CURRENT SYSTEM CURRENT SYSTEM The current electrical system can best be described as star; one main switchboard that feeds to the main distribution panel, which then feeds the other panels. The normal power is provided

More information

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer Achieving Higher Short Circuit Current Ratings for Industrial Control Panels Standards & codes note 1 By Steve Hansen Sr. Field Engineer Introduction Articles 9.1 and. in the National Electrical Code require

More information

Troubleshooting Guide for Limoss Systems

Troubleshooting Guide for Limoss Systems Troubleshooting Guide for Limoss Systems NOTE: Limoss is a manufacturer and importer of linear actuators (motors) hand controls, power supplies, and cables for motion furniture. They are quickly becoming

More information

ACHIEVING MAXIMUM BENEFITS WITH A FUSE PROTECTED MOTOR CONTROL CENTER

ACHIEVING MAXIMUM BENEFITS WITH A FUSE PROTECTED MOTOR CONTROL CENTER ACHIEVING MAXIMUM BENEFITS WITH A FUSE PROTECTED MOTOR CONTROL CENTER SYSTEM PROTECTION NOTE 2 BY MIKE LANG, PRINCIPAL FIELD ENGINEER INTRODUCTION Increasing concern for arc flash safety has grown to include

More information

Supply-Side PV Connections

Supply-Side PV Connections Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

400/230 Volt 60Hz UPS Power

400/230 Volt 60Hz UPS Power olt 60Hz Power Using ual Voltage standby generation and in one Nothing protects quite like Piller www.piller.com Contents 1 Abstract...3 2 Introduction...4 3 Alternative Power istribution...6 4 Integrating

More information

GET GROUNDED. Renewable Energy System Grounding Basics

GET GROUNDED. Renewable Energy System Grounding Basics GET GROUNDED Renewable Energy System ing Basics by Christopher Freitas ASK TEN RENEWABLE ENERGY INSTALLERS ABOUT SYSTEM GROUNDING and you ll likely get ten different opinions as to what the National Electrical

More information

Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear

Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear ENGINEERING SERVICES 809 Gleneagles Court, Suite 309; Towson, MD 21286 Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear Prepared by: Keith Robertson, PE Staff Power

More information

Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR

Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR Assembly Short-Circuit Current Ratings What Is A Short-Circuit

More information

Don t Discriminate: The importance of selective coordination in electrical installations

Don t Discriminate: The importance of selective coordination in electrical installations Don t Discriminate: The importance of selective coordination in electrical installations Prepared by: Design Engineer: Anthony Unsworth anthonyunsworth@sudlows.com What is Discrimination? Discrimination,

More information

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008 NB Power Customer Service and Distribution June 2008 Prepared by: Steven Wilcox Revised by: Steven Wilcox TABLE OF CONTENTS 1.0 Introduction 4 2.0 NB Power Policy on Independent Power Production 4 3.0

More information

Enhancing Short Circuit Selective Coordination with Low Voltage Circuit Breakers

Enhancing Short Circuit Selective Coordination with Low Voltage Circuit Breakers Data Bulletin 0100DB0403R5/05 05/2005 Cedar Rapids, Iowa, USA Enhancing Short Coordination with Low Voltage s Retain for future use. INTRODUCTION DEFINITIONS ASSUMPTIONS CIRCUIT BREAKER BASICS The purpose

More information

FUSE: SAFE & RELIABLE

FUSE: SAFE & RELIABLE FUSE: SAFE & RELIABLE VS. CIRCUIT BREAKER Tech Topics: Selective Coordination Note 2, Issue 1 Franck Charlier Technical Support Engineer Points of interest: Power fuse needs no repair only to be replaced

More information

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Arc Fault Circuit Interrupter (AFCI) FACT SHEET Arc Fault Circuit Interrupter (AFCI) FACT SHEET THE AFCI The AFCI is an arc fault circuit interrupter. AFCIs are newly-developed electrical devices designed to protect against fires caused by arcing faults

More information

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS

DIVISION 26 ELECTRICAL SECTION CIRCUIT BREAKERS DIVISION 26 ELECTRICAL SECTION 26 28 19 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install circuit breakers in switchboards, distribution panelboards, and separate enclosures for overcurrent protection

More information

Take a fresh look at solar things you should consider when purchasing a solar system

Take a fresh look at solar things you should consider when purchasing a solar system Take a fresh look at solar things you should consider when purchasing a solar system you re not JusT buying hardware 1 2 3 Get a system designed to suit your electricity usage Get long-term support Think

More information

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail

More information

Fused Coordination Panelboard

Fused Coordination Panelboard Fused Coordination Panelboard SOLUTIONS GUIDE SOLUTIONS GUIDE Branch Circuit Protection Introducing Mersen s Fused Coordination Panelboard Selective Coordination is required in several locations as defined

More information

Fusing Equipment. Kearney Fuse Links. general. Internal Construction. tin element

Fusing Equipment. Kearney Fuse Links. general. Internal Construction. tin element Fusing Equipment Kearney Fuse Links Electrical Apparatus 327-40 general Cooper Power Systems Kearney fuse links can be applied to a variety of applications requiring overcurrent protection of distribution

More information

January 30, Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT. Re: NFPA 70E Hazard Assessment. Date of Visit.

January 30, Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT. Re: NFPA 70E Hazard Assessment. Date of Visit. 3018 Eastpoint Parkway Louisville, KY 40223 (502) 716-7073 January 30, 2006 Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT Re: NFPA 70E Hazard Assessment Date of Visit January 24, 2006

More information

PHY152H1S Practical 3: Introduction to Circuits

PHY152H1S Practical 3: Introduction to Circuits PHY152H1S Practical 3: Introduction to Circuits Don t forget: List the NAMES of all participants on the first page of each day s write-up. Note if any participants arrived late or left early. Put the DATE

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

PROTECTION OF THE BRANCH CIRCUIT

PROTECTION OF THE BRANCH CIRCUIT PROTECTION OF THE BRANCH CIRCUIT Branch circuit should always be protected from over current. Hence, an overall current devices shall be installed in all branch circuitries. Function of the over-current

More information

21 Keep Residential Stairwells & Hallways Lit During Blackouts

21 Keep Residential Stairwells & Hallways Lit During Blackouts NEW CODE FURTHER ACTION 21 Keep Residential Stairwells & Hallways Lit During Blackouts I. Summary Issue: All buildings are required to have 90 minutes of emergency lighting so they can be safely evacuated.

More information

Devices for Branch Circuits and Feeders

Devices for Branch Circuits and Feeders Devices for Branch Circuits and Feeders Branch Circuit Overcurrent Protective Devices and s Fusible Solutions: When selecting fusible overcurrent protective devices, the type of fuse holder or switch is

More information

MTU Onsite Energy powers critical equipment in Rush University Medical Center expansion

MTU Onsite Energy powers critical equipment in Rush University Medical Center expansion Contact: Gary Mason MTU America Inc. Phone: +1 248 560 8480 E-mail: gary.mason@mtu-online.com Agency contact: Karah Davenport Stratacomm Phone: +1 248 213 7340 E-mail: kdavenport@stratacomm.net MTU Onsite

More information

705.12(D) The requirements pertaining to the connection. Unraveling the Mysterious. Load Side PV Connections. by John Wiles

705.12(D) The requirements pertaining to the connection. Unraveling the Mysterious. Load Side PV Connections. by John Wiles Unraveling the Mysterious 705.12(D) Load Side PV Connections by John Wiles The requirements pertaining to the connection of utility-interactive photovoltaic (PV) power systems to the load side of the main

More information

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES DIVISION 311 MISCELLANEOUS ELECTRICAL RULES 918-311-0000 Design, Planning and Lay Out of Electrical Installations by Supervising Electricians A licensed supervising electrician may design, plan and lay

More information

Kearney fuse links. Technical Data General. Effective December 2013 Supersedes November 2009

Kearney fuse links. Technical Data General. Effective December 2013 Supersedes November 2009 Kearney fuse links Supersedes November 2009 General Eaton's Cooper Power Systems Kearney fuse links can be applied to a variety of applications requiring overcurrent protection of distribution systems

More information

Fig. 1. Sample calculation for determining the proper conductor size needed to serve a motor controller and avoid voltage drop problems.

Fig. 1. Sample calculation for determining the proper conductor size needed to serve a motor controller and avoid voltage drop problems. Power to the Pump By Mike Holt, NEC Consultant Why some fire pump requirements are "backward" One of the principal NEC requirements for circuit protection is that you shut down the equipment rather than

More information

Understanding Arc Flash Hazards. White Paper

Understanding Arc Flash Hazards. White Paper White Paper By: Kevin J. Lippert Eaton Electrical 170 Industry Drive Pittsburgh, PA 15275 Donald M. Colaberardino Eaton Electrical 170 Industry Drive Pittsburgh, PA 15275 Clive W. Kimblin Eaton Electrical

More information