DENTON VACUUM UNIVERSITY OF UTAH

Size: px
Start display at page:

Download "DENTON VACUUM UNIVERSITY OF UTAH"

Transcription

1 DENTON VACUUM DISCOVERYTM-18 DEPOSITION SYSTEM OPERATING MANUAL UNIVERSITY OF UTAH JOB #: Tel: Fax: DENTON VACUUM, INC North Church Street, Moorestown, NJ December 1996

2 Table of Contents Denton Vacuum. Inc. DiscoveryTM-18 Deposition System TABLE OF CONTENTS Section Page 1. INTRODUCTION SAFETY WARNINGS SYSTEM SPECIFICATIONS Deposition Chamber Loadlock Chamber Deposition Chamber Pumping System Loadlock Pumping System Vacuum Gauging/Process Gas 3-3 and Pressure Control 3.6 Sputter Sources Sputter Power Supplies RF-Bias Substrate Stage Substrate Heat System Control and Automation Utilities System Documentation Sputter Targets SYSTEM OPERATION 4.1 Cold Start 4.2 System Pumping and Venting Main Chamber Pumping - Automatic Mode Main Chamber Pumping - Manual Mode Loadlock Pumping - Automatic Mode Loadlock Pumping - Manual Mode Main Chamber Venting - Automatic Mode Main Chamber Venting - Manual Mode Loadlock Venting - Automatic Mode Loadlock Venting - Manual Mode 4.3 Manual Processing Loadlock to Chamber Substrate Transfer

3 Table of Contents Denton Vacuwn. Inc. DiscoveryTM-18 Deposition System TABLE OF CONTENTS Section Page 4. SYSTEM OPERATION (cont'd) Chamber to Loadlock Substrate Transfer Fixed-Flowrate Process Gas Substrate Heat Plasma Processing DC Sputtering (Cathodes 1, 2 or 3) RF Sputtering (Cathodes 1 and 2) RF Bias Cathode Construction Cathode Disassembly Cathode Re-Assembly/System Installation 3.0" Cathode Assembly Drawing Legend \0 LIST DISCOVERyTM-18 "SOFTWARE" INTERLOCKS 6.1 Varian CC2 Sentorr Setpoints 6.2 Mechanical Pump 6.3 Turbo Pump 6.4 Chamber Rough Valve 6.5 Chamber Vent Valve 6.6 Chamber HiVac Valve 6.7 Turbo Backing Valve 6.8 Loadlock Rough Valve 6.9 Loadlock Vent Valve 6.10 Gas#l and Gas#2 Isolation Valves 6.11 Source/Stage Shutters 6.12 Rotation 6.13 Heat Power 6.14 RFX#l RF Power Supply 6.15 RFX#2 RF Power Supply 6.16 MDX DC Power Supply

4 Table of Contents Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System TABLE OF CONTENTS Section Page 7. GE LADDER LOGIC PROGRAM TROUBLESHOOTING 8.1 Introduction 8.2 Basic Tool Requirements 8.3 Vacuum System Control Rack 8.4 PLC Controller 8.5 Valves and Shutters 8.6 Rotation 8.7 Substrate Heat SRC Controller 8.8 Summary SPARE PARTS LISTS 10. ELECTRICAL SCHEMATICS Description Interlock RFX Power Supply MDX 1.5K Power Supply Pumps & Valves Gas & Pressure Control Rotation Control PLC Rack Layout TCflON Gauge Control Power Distribution Heat Control Loadlock Control File Name UTA-INTL.DWG UTA-RFX.DWG UTA-MDX.DWG UTA-PUMP.DWG UTA-GAS.DWG UTA-ROTA.DWG UTA-PLC.DWG UTA-ION.DWG UTA-POWE.DWG UTA-HEAT.DWG UTA-LL.DWG 111

5 Table of Contents Denton Vacuum, Inc. DiscoveryTM-18 Deposition System TABLE OF CONTENTS Section Page 11. MECHANICAL DRAWINGS Description General Arrangement & Floor Plan Baseplate Detail Poppet Valve Assembly Air Piping Assembly Water Piping Assembly Vacuum Piping Assembly 3.0" Sputter Cathode Shutter Assembly Transport Mechanism Assembly 3 kw Heater Fixture Biasable Substrate Rotation Assembly Number D-O D-O D C l1 C-O D Q12 C-O C-Q D C C PREVENTIVE MAINTENANCE 12.1 Mechanical Pump 12.2 Deposition Chamber 12.3 Turbomolecular Pump 12.4 Sliding Seals IV

6 Denton Vacuum, Inc. Table of Contents DiscoveryTM-18 Deposition System EQUIPMENT LIST AND VENDOR MANUALS (sent with system) Advanced Energy Industries Inc. 1/ RFX600 RF Power Supply (Manual Provided) Advanced Energy Industries Inc. ATX600 Matching Network Control Panel Advanced Energy Industries Inc. ATX600 Matching Network Advanced Energy Industries Inc. MDX1.5K DC Power Supply (Manual Provided) (Manual Provided) (Manual Provided) Alcatel Vacuum Products 2021 Rotary Vane Pump (Manual Provided) Alacatel Vacuum Products ATP5150 Turbomolecular Pump (Manual Provided) Alcatel Vacuum Products CFF450 Turbopump Frequency Controller (Manual Provided) Angstrom Sciences Certificate of Analysis (Manual Provided) Granville Phillips Mini-Convectron Gauge (Manual Provided) High Vacuum Apparatus 8.0" Electro-Pneumatic Gate Valve (Manual Provided) v

7 Table of Contents Denton Vacumn, Inc. DiscoveryTM-18 Deposition System EQUIPMENT LIST AND VENDOR MANUALS (cont/d) MKS Instruments, Inc \ Type 247C Four Channel Mass Flow Controller Power Supply/Readout (Manual Provided) MKS Instruments, Inc '. /Type PDR-C-IC Power Supply/Readout (Manual Provided) MKS Instruments, Inc Type 127AA-OOO.IC Capacitance Manometer (Manual Provided) MKS Instruments, Inc 2259C Mass Flow Controllers (Manual Provided) Omega Instruments icn76000 Temperature Controller (Manual Provided) Varian Vacuum Products CC2 Sentorr Gauge Controller (Manual Provided) VI

8 Introduction Denton Vacuum, Inc. Discoveryn.q8 Deposition System 1. INTRODUCTION The Denton Vacuum DiscoveryTM-18 Deposition System is designed for either thin film production or research. The DiscoveryTM-18 configuration provides easy access to substrates, sources, and instrumentation while maintaining excellent pumping characteristics. This system is designed to simplify the geometries necessary for the coordination of multiple source depositions. Because Denton uses the finest available subsystems and components, the system is highly reliable and durable. The system's inherent flexibility allows for the operation of three sputter sources and the ability to heat, RF bias, and rotate the substrate. The DiscoveryTM-18 is semiautomatic; controlled by a General Electric Programmable Logic Controller (PLC). The system's power supplies and instrumentation are installed in a control cabinet conveniently located next to the chamber for easy observation and operation. The system offers the user a myriad of thin film process possibilities. However, it is important to note that with all of this system's potential there exists safety considerations. Individuals who are to operate, service or maintain this system should familiarize themselves with this manual. I-I

9 Introduction Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 1-2

10 Safety Warnings Denton Vacuwn, Inc. Discoveryl"M-18 Deposition System 2. SAFETY WARNINGS This vacuum deposition system is comprised of a number of complex subsystems. LETHAL VOLTAGES, HIGH TEMPERATURES, HIGH PRESSURES AND POWERFUL MECHANICAL DRIVE MECHANISMS ARE PRESENT THROUGHOUT THE SYSTEM. Every attempt has been made to safeguard operating and maintenance personnel. Interlocking of sub systems provides a high degree of operator safety. SYSTEM/SOFTWARE INTERLOCKS SHOULD NEVER BE DEFEATED UNLESS SERVICING OF THE SYSTEM REQUIRES TEMPORARY INTERLOCK OVERRIDES. HARDWIRED SAFETY INTERLOCKS MUST NEVER BE DEFEATED. All safety/software interlocks should be returned to operational status when problems have been corrected. Operating and maintenance manuals have been provided and should be thoroughly understood before any operations are contemplated. 2-1

11 Safety Warnings Denton Vacuwn, Inc. Discoveryr\1-18 Deposition System 2-2

12 System Specifications Denton Vacuwn, Inc. Discoverynq8 Deposition System 3. SYSTEM SPECIFICATIONS 3.1 DEPOSITION CHAMBER 304L stainless steel chamber, measuring approximately 18" (diameter) x 13.5" (deep). Full-diameter, top-opening access flange, mounted via articulating hinges to the deposition chamber. Access flange is supported by two gas-pressurized struts to facilitate loading and unloading operations. Viewports: (1) optically shielded 4.00" diameter viewport (chamber sidewall) to permit unrestricted viewing of all installed deposition sources and substrate fixturing. Bottom mounted pumping plenum (off chamber baseplate). The following chamber penetrations will be provided: Baseplate: a) (1) 8.00" (pumping plenum) b) (15) 1.00" (instrumentation, gas, spares) c) (1) 3.38" CF (substrate rotation) Sidewall: a) (1) 4.00" viewport (optically shielded) b) (2) 2.75" CF c) (1) 1.33 mini-cf d) (1) 10.0" CF (rotatable, loadlock expansion) Top-plate: a) (3) 1.12" compression seal (sputter cathodes) b) (3) 0.25" (shutter rotary feedthroughs) Pumping Plenum: a) (1) NW100 (high vacuum pump) b) (1) 0.75" compression seal (vacuum gauge) c) (1) NW25 (roughing valve)) d) (1) NWI6 (vent valve/vacuum safety) e) (1) 3.50" (high vacuum bellows valve actuator) 3-1

13 System Specifications Denton VacUlun, Inc. DiscoveryTM-18 Deposition System 3.2 LOADLOCK CHAMBER 304L stainless steel chamber, electro-polished, measuring approximately 8.0" (diameter) x los' (long). 8.0" electro-pneumatic, hivac gate valve (CF flanging). 8.0 " diameter, side-loading door, electric transfer drive The following loadlock penetrations will be provided: a) (1) 2.75" CF b) (1) 1.33 mini-cf (vacuum gauge) c) (1) NW25 (loadlock roughing) d) (1) VCO-4 stub (vent valve) 3.3 DEPOSITION CHAMBER PUMPING SYSTEM Alcatel ATP5150 turbomolecular pump (NWlOO inlet flange, particulate screen, air-cooled) with Alcatel CFF450 frequency convertor. Alcatel 2021 two-stage, rotary vane pump (14.6 CFM). NW25 foreline filter DVI 5.0" electro-pneumatic, internal hivac poppet valve. NW25 bellows-sealed, electro-pneumatic, roughing valve. NW25 bellows-sealed, electro-pneumatic, turbo backing valve. 0.25" VCO, bellows-sealed, electro-pneumatic vent valve. 0.25" electric, mechanical pump vent valve (slaved to mechanical pump status). KF-25 manual valve (leak checking), mounted on foreline. 3-2

14 System Specifications Denton Vacuwn, Inc. Discoverynq8 Deposition System 3.4 LOADLOCK PUMPING SYSTEM Utilization of deposition chamber mechanical pump to achieve crossover pressure of approximately 2.0E-1 torr. 1.0" bellows-sealed, electro-pneumatic, roughing valve. VCGA bellows-sealed, electro-pneumatic, vent valve. 3.5 VACUUM GAUGING/pROCESS GAS AND PRESSURE CONTROL Varian SenTorr CC2 cold cathode/thermocouple gauge controller: Cold cathode gauge #1 (deposition chamber, gauge setpoint relay interfaced to system controller). Thermocouple gauge #1 (deposition chamber, gauge setpoint relay interfaced to system controller). Thermocouple gauge #2 (turbomolecular pump fore line, gauge setpoint relay interfaced to system controller). Granville Phillips Model 275 mini-convectron vacuum sensor pressure switch (P/N: ) for loadlock chamber crossover (2.0E-l) indication. MKS Instruments 127A (l00 mtorr FS) capacitance manometer with MKS Instruments PDR-C-1C power supply/readout. MKS Instruments 247C four-channel power supply/readout interfaced to (2) MKS 2259C mass flow controllers (100 sccm and 50 sccm full scale): each MKS 2259C supplied with close-coupled, bellows-sealed, electro-pneumatic, isolation valve, each MKS 2259C isolation valve controlled by system controller, and each MKS 2259C outfitted with dual gas-inlet capability (manual toggle-type isolation valves). 3.6 SPUTTER SOURCES (3) DVI 3.0" diameter, internal "stalk-mount", planar magnetron sputter sources: RF/DC capability, Variable source to substrate distance, and Clamp/bond target compatibility. 3-3

15 University of Utah, Job #: Ig003 System Specifications Denton VacuLUn. Inc. Discoverynqg Deposition System (3) independent, electro-pneumatic source shutters (cylinder mounted air flowrate control), each dedicated to a delivered planar magnetron, interfaced to system PLC for remote open/close operation. Cooling water flow sense on each cathode's dedicated cooling water circuit (safety interlock). Quick-disconnect cooling water lines. 3.7 SPUTTER POWER SUPPLIES (1) Advanced Energy MDX1.5K (Low Z; 700 volt) power supply: Hardwired safety interlock (chamber door, vacuum bellows safety switch, cathode water), (1) manual DC power switchbox, to shunt output of MDX supply to any of the three installed cathodes: (2) Advanced Energy RF blocking filters (PIN ) (2) Advanced Energy RFX600 RF power supplies, each coupled to an Advanced Energy ATX600 automatic match network: Hardwired safety interlock (chamber door, vacuum bellows safety switch, cathode or Bias-Stage water), Twin power output lead from match network to minimize cable heating, and Matching network configured for discrete DC power input. 3.8 RF-BIAS SUBSTRATE STAGE (1) RF-bias substrate stage (confocal source mode): (2) 10" substrate platens; one pre-machined to accept DVI's sample transfer holder and the other "blank" to support Utah's TBD substrate requirements. (2) DVI sample transfer holders: one pre-machined to accept a 150 mm diameter substrate and the other "blank" to support Utah's TBD substrate requirements. (1) DVI high performance, RF-biasable rotary motion feedthrough, 3.38" CF flanging. 3-4

16 System Specifications Denton Vacuwn, Inc. Discoverynq8 Deposition System (1) direct-drive, compact, gear motor. - Rotation speed adjust (0-20 RPM) via front panel potentiometer. 3.9 SUBSTRATE HEAT (1) 3.0 kw, backside quartz heater array with reflector and deposition shield. 208/110 VAC step-down/isolation transformer to minimize possibility of spurious glow discharges and feedback from sputter power supplies. 3.0 kw PI temperature control system (Omega CN76000 temperature controller, interfaced to system PLC for remote on/off operation. Manual setpoint. (1) sheathed thermocouple positioned internally in chamber SYSTEM CONTROL AND AUTOMATION GE-Fanuc programmable logic controller (PLC) with membrane-type operator interface. EEPROM memory backup. Valve control/sequencing, pump operation, and "soft" system interlocks (i.e., non-safety related) controlled by the PLC. The following operating modes provided: AUTOPUMP (automatic loadlock and chamber pumpdown to high vacuum conditions), AUTOVENT (automatic loadlock and chamber venting to atmospheric pressure), MANUAL (permits manual (front panel) system operation and interruption of in-process automatic system sequences), and MAINTENANCE MODE (key-switch selectable from MANUAL mode; permits all MANUAL MODE functionality, "soft" system valve interlocks disabled. All "hard" safety interlocks remain operational). 3-5

17 University of Utah. Job #: System Specifications Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 3.11 UTILITIES Electrical: 208 VAC, 60 Hz, 1 phase, 4 wire (60 A) Cooling water: Imin, degrees Centigrade, 3-4 bar differential between supply and return (6 bar maximum inlet pressure): Four-circuit water manifold (metering on supply and return side); circuit designation follows: 1.) Sputter cathode #1 (flow sense/interlock) 2.) Sputter cathode #2 (flow sense/interlock) 3.) Sputter cathode #3 (flow sense/interlock) 4.) RF Bias Stage (flow sense/interlock) Compressed air: Ihr, normal dry shop air, 6-7 bar (system valve operation): dew point: maximum of 2 degrees Centigrade oil content: 1-5 mg/m 3 foreign particles, size: maximum of 5 microns foreign particles, concentration: maximum of 5 mg/m 3 Nitrogen: (preferentially evaporated from liquid N 2 ) 0.5 bar (chamber venting, 100 l/cycle, optional) 0.5 bar (loadlock venting, 10 1Icycle, optional) Process gas: 5N purity 0.5 bar (customer supplied) 3.12 SYSTEM DOCUMENTATION Three complete sets of operating instruction manuals; instruction manuals to include preventive maintenance procedures/timetable, troubleshooting guides, and fully-costed spare parts listing. One complete set of sub-assembly vendor manuals. Three complete sets of electrical schematics (B-size). One complete set of electrical schematics (AUTOCAD.DWG format). Three complete sets of mechanical drawings necessary for system maintenance and repair (D-size). 3-6

18 System Specifications Denton Vacuwn, Inc. Discoverynq8 Deposition System 3.13 SPUTTER TARGETS 3.0" diameter x 0.062" thick; gold target (4N purity). 3.0" diameter x 0.062" thick; platinum target (4N purity). 3.0" diameter x 0.125" thick; copper target (5N purity). 3.0" diameter x 0.125" thick; aluminum target (5N purity) " diameter x 0.125" thick; Si0 2 target (4N5 purity) solder bonded to DVI 3.0" backing plate (backing plate included) " diameter x 0.125" thick; Si 3 N 4 target (3N5 purity) solder bonded to DVI 3.0" backing plate (backing plate included). 3-7

19 System Specifications Denton Vacuum, Inc. Discoveryn.'-l8 Deposition System 3-8

20 System Operation Denton Vacuwn, Inc. DiscoveryrM-18 Deposition System 4. SYSTEM OPERATION 4.1 COLD START 1. Turn ON main system disconnect located on rear of system instrumentation cabinet; ensure that all utilities and process gases are installed and,)perational. 2. Push the green START button located near the top of rack cabinet. At this point, power to the system and the system PLC will be applied. 3. Power-up the following subsystems and instrumentation: Varian CC2 cold cathode/thermocouple gauge controller (power is applied by toggling the front panel STANDBY key), MKS PDR-C-IC capacitance manometer power supply/readout, MKS 247C mass flow controller power supply, Turn ON channels 1 and 2, Advanced Energy MDX1.5K 1.5 kw DC power supply, both Advanced Energy RFX 600 W RF power supplies, and both Advanced Energy ATX automatic matching networks. 4. Select (instrument front panel) the following configuration on the following subsystems and instrumentation: "AUTO ON" and "TORR" display units on the Varian CC2 cold cathode/thermocouple gauge controller, "FLOW" mode for each channel (1-4) on the MKS 247C flow controller, "MM HG" display units on the PDR-C-IC power supply, "LOCAL SIGNAL", "LOCAL CONTROL", and "FWD POWER REGULATION" mode for each RFX600 RF power supply (Ensure that the left display is indicating "FORWARD PWR" and the right display is indicating "REFLECTED POWER"), "AUTa" mode for each ATX600 RF matching network controller (Ensure that the bar graphs are set up to read capacitor position). "POWER REGULAnON" on the MDX1.5K DC power supply 4-1

21 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 5. Ensure that the following setpoints and limits are entered into the Varian CC2 cold cathode/thermocouple gauge controller: TC_l (Chamber): 2.0E-l torr (Isolation Valve Crossover), and TC_2 (Turbo foreline): 5.0E-l torr (Hivac Valve Crossover). Please refer to the Varian Sentorr manual on the proper procedure to display and alter setpoints. 6. Ensure that the following setpoints are entered (rear input) into the MKS 247C power supply/readout: Channel 1 display: (Full scale flowmeter rating)(gcf), and Channel 2 display: (Full scale flowmeter rating)(gcf). Please refer to the MKS 247C manual on the proper procedure to display and alter gas correction factors and setpoints. 7. Ensure that the following limits are entered into the Advanced Energy RFX600 power supplies: RFX #1: 600 W maximum RF power, and RFX #2: 600 W maximum RF power. 8. Ensure that the loadlock transfer arm is fully retracted. 9. Ensure that the system keyswitch is set in the Manual Mode position. 10. Ensure that the loadlock lid is in place and that the loadlock isolation valve is fully closed. 11. Ensure that the chamber lid is lowered, the latch is engaged, and positive contact has been made with the lid sensor switch. 12. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 13. Tum on the mechanical pump; wait 60 seconds. 4-2

22 System Operation Denton Vacuum, Inc. DiscoveryTM-18 De(XlSition System 14. Open the turbopump backing valve; wait until the pressure indicated on TC_2 is less than 50 millitorr (the turbopump can be started once it is backed by the mechanical pump; waiting until the "stub" pressures approached the mechanical pump's blank off value ensures that there are no major leaks below the high vacuum valve). 15. Turn on the turbomolecular pump. 16. Wait until the turbopump has completed its' acceleration and has attained full rotational speed (indicated on the CFF450 frequency by a change in the status LED's color from yellow to green). Note: If the CFF450 frequency convertor LED is red then a fault is present and the user should immediately contact Denton Vacuum or Alcatel Vacuum Products! 17. Add LN z to the cold trap (optional). A full charge of LNz will keep the trap cold for approximately 2-4 hours. 18. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 19. Depress the "Chamber Autopump" keyswitch to initiate the automatic chamber pumping process. At the completion of this automatic pumping sequence the "Chamber Autopump" LED indicator will be extinguished and the chamber will be in high vacuum status. Note: If the "CHAMBER AUTOPUMP" softkey is depressed before the completion ofthe automatic cycle (i.e., the autocycle LED is still flashing when the key is depressed) then the automatic cycle will be tenninated and the machine will remain in the valve state at which the termination was initiated! 4.2 SYSTEM PUMPING AND VENTING MAIN CHAMBER PUMPING - AUTOMATIC MODE I. Ensure that steps I through 17 of the Cold Start Procedure (Section 4.1) have been successfully completed. 4-3

23 System Operation Denton VaculU11, Inc. DiscoveryfM-18 Deposition System 2. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 3. Depress the "Chamber Autopump" keyswitch to initiate the automatic chamber pumping process. At the completion of this automatic pumping sequence the "Chamber Autopump" LED indicator will be extinguished and the chamber will be in high vacuum status MAIN CHAMBER PUMPING - MANUAL MODE 1. Ensure that steps 1 through 17 of the Cold Start Procedure (Section 4.1) have been successfully completed. 2. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 3. Close the turbomolecular pump backing valve. 4. Open the chamber rough valve. Pump the main chamber until the pressure indicated on TC_l is less than 2.0E-l torr. 5. Close the chamber rough valve. 6. Open the turbomolecular pump backing valve. Wait until the pressure indicated on TC_2 is less than 1.0E-2 torr. 7. Open the chamber hivac valve LOADLOCK PUMPING - AUTOMATIC MODE 1. Ensure that steps 1 through 17 of the Cold Start Procedure (Section 4.1) have been successfully completed. 2. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 4-4

24 University of Utah, Joh #: System Operation Denton Vacuwn, Inc. DiscoveryrM-18 Deposition System 3. Depress the "Loadlock Autopump" keyswitch to initiate the automatic chamber pumping process. At the completion of this automatic pumping sequence the "Loadlock Autopump" LED indicator will be extinguished and the loadlock will be ready for exposure to the main chamber. Note: If the "LOADLOCK AUTOPUMP" softkey is depressed before the completion of the automatic cycle (i.e., the autocycle LED is still flashing when the key is depressed) then the automatic cycle will be terminated and the machine will remain in the valve state at which the termination was initiated! LOADLOCK PUMPING - MANUAL MODE 1. Ensure that steps 1 through 17 of the Cold Start Procedure (Section 4.1) have been successfully completed. 2. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 3. Close the turbomolecular pump backing valve. 4. Open the loadlock rough valve. Pump the loadlock until the "loadlock setpoint" LED is illuminated on the Granville Phillips Model 275 mini-convectron (the setpoint of the 275 was preset at the factory to 200 mtorr). 5. Wait 20 seconds. 6. Close the loadlock rough valve. 7. Open the turbomolecular pump backing valve MAIN CHAMBER VENTING - AUTOMATIC MODE 1. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. 4-5

25 System Operation Denton Vacuum, Inc. DiscoveryTM-18 Deposition System 2. Ensure that the loadlock isolation gate valve is fully closed. 3. Ensure that the system keyswitch is set in the Manual Mode position. 4. Tum off all internal sources of energy (RF power, DC power, and heat). 5. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 6. Depress the "Chamber Autovent" keyswitch to initiate the automatic chamber venting process. At the completion of this automatic venting sequence the "Chamber Autovent" LED indicator will be extinguished and the chamber will be vented to atmospheric pressure. Note: If the "CHAMBER A UTOVENT" softkey is depressed before the completion of the automatic cycle (i.e., the autocycle LED is still flashing when the key is depressed) then the automatic cycle will be terminated and the machine will remain in the valve state at which the termination was initiated! MAIN CHAMBER VENTING - MANUAL MODE 1. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. 2. Ensure that the loadlock isolation gate valve is fully closed. 3. Ensure that the system keyswitch is set in the Manual Mode position. 4. Tum off all internal sources of energy (RF power, DC power, and heat). 5. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 6. Close (if open) the hivac valve. 7. Close (if open) the chamber rough valve. 4-6

26 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 8. Close (if open) the gas #1 and gas #2 isolation valves. 9. Open the chamber vent valve. When chamber is fully vented and the chamber lid seal is broken, close the chamber vent valve LOADLOCK VENTING - AUTOMATIC MODE 1. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. 2. Ensure that the loadlock isolation gate valve is fully closed. 3. Ensure that the system keyswitch is set in the Manual Mode position. 4. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 5. Depress the "Loadlock Autovent" keyswitch to initiate the automatic loadlock venting process. At the completion of this automatic venting sequence the "Loadlock Autovent" LED indicator will be extinguished and the loadlock will be vented to atmospheric pressure. Note: If the "LOADLOCK AUTOVENT" softkey is depressed before the completion of the automatic cycle (i.e., the autocycle LED is still flashing when the key is depressed) then the automatic cycle will be terminated and the machine will remain in the valve state at which the termination was initiated! LOADLOCK VENTING - MANUAL MODE 1. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. 2. Ensure that the loadlock isolation gate valve is fully closed. 3. Ensure that the system keyswitch is set in the Manual Mode position. 4-7

27 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 4. Depress the"auto ENABLE" switch and ensure that the"auto ENABLE" LED indicator is not flashing. 5. Close (if open) the loadlock rough valve. 6. Open the loadlock vent valve. When loadlock is fully vented and the loadlock lid can be opened, close the loadlock vent valve. 4.3 MANUAL PROCESSING LOADLOCK TO CHAMBER SUBSTRATE TRANSFER 1. Ensure that the loadlock has been vented to atmospheric pressure. 2. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. Load appropriate substrate onto substrate transfer arm (transfer disk MUST be resting against fork back-stop!) 3. Ensure that loadlock and main chamber are in vacuum status. 4. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 5. Open the loadlock gate valve (insure that all in-situ processes have been completed!!). 6. Ensure that the substrate transfer arm is in the "UP" position. 7. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 8. Depress the "Sample Holder In" keyswitch to initiate the automatic transfer insertion process. While the sample is driven into the chamber, the "Sample Holder In" LED will flash. Once the sample is fully driven into the chamber the "Sample Holder In" LED indicator will be continuously illuminated. 4-8

28 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 9. Lower the substrate transfer arm to the "DOWN" position. 10. Depress the "Sample Holder Out" keyswitch to initiate the automatic transfer insertion process. While the sample is driven into the loadlock, the "Sample Holder Out" LED will flash. Once the sample is fully driven into the loadlock the "Sample Holder Out" LED indicator will be continuously illuminated. 11. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 12. Close the loadlock gate valve CHAMBER TO LOADLOCK SUBSTRATE TRANSFER 1. Ensure that the loadlock has been venteg. to atmospheric pressure. 2. Ensure that the loadlock transfer arm is fully retracted and the "Sample Holder OUT" LED is illuminated. 3. Ensure that loadlock and main chamber are in vacuum status. 4. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 5. Open the loadlock gate valve (insure that all in-situ processes have been completed!!). 6. Ensure that the substrate transfer arm is in the "DOWN" position. 7. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is flashing. 8. Depress the "Sample Holder In" keyswitch to initiate the automatic transfer insertion process. While the sample is driven into the chamber, the "Sample Holder In" LED will flash. Once the sample is fully driven into the chamber the "Sample Holder In" LED indicator will be continuously illuminated. 4-9

29 System Operation Denton Vacuwn, Inc. Discoverynq8 Deposition System 9. Raise the substrate transfer arm to the "UP" position. 10. Depress the "Sample Holder Out" keyswitch to initiate the automatic transfer insertion process. While the sample is driven into the loadlock, the "Sample Holder Out" LED will flash. Once the sample is fully driven into the loadlock the "Sample Holder Out" LED indicator will be continuously illuminated. 11. Depress the "AUTO ENABLE" switch and ensure that the "AUTO ENABLE" LED indicator is not flashing. 12. Close the loadlock gate valve FIXED-FLOWRATE PROCESS GAS (SPUTTERING/pRESSURE CONTROL) 1. Ensure that process gas (5-10 psig) is supplied to the appropriate MKS 2259C mass flow controller(s). 2. Refer to the MKS 247 and MKS 2259C manuals for all adjustment procedures. 3. Ensure that the correct gas correction factor is set for each mass flow controller on the rear of the MKS 247C. 4. Ensure that power has been applied to the MKS 247C and PDR-C-IC for at least 8 hrs (necessary to establish thermal equilibrium for the mass flow controllers and capacitance manometer). 5. Zero the mass flow controller(s); this process can only be accomplished with the appropriate gas isolation valves closed. 6. Adjust the setpoint potentiometer for each channel to the desired flowrate. Don't forget to depress the setpoint display switch and set the display select switch for each channel. 7. Ensure that the chamber is under high vacuum status (pressure < l.oe-5 torr). 4-10

30 System Operation Denton VaculUD, Inc. DiscoveryTM-18 Deposition System 8. Zero the capacitance manometer. 9. Toggle the "AUTO ENABLE" keyswitch so that the "AUTO ENABLE" LED indicator is not flashing. 10. Open the appropriate gas isolation valve (Gas #1 or Gas #2). 11. Adjust the setpoint potentiometer for each flow channel to achieve the desired pressured, indicated on the PDR-C-IC readout. Remember: the units of display on the PDR-C-IC readout are xx.xx mtorr! SUBSTRATE HEAT 1. Prior to any attempt at processing, ensure that the quartz lamp housing is installed in the main chamber and that the electrical connections have been made to the power feedthrough (polarity is not important). 2. Ensure that main chamber has been pumped to a state of high vacuum and that substrate has been transferred from the loadlock onto the substrate table. 3. Toggle the "AUTO ENABLE" keyswitch so that the "AUTO ENABLE" LED indicator is not flashing. 4. Tum on substrate rotation. Verify that the substrate stage is rotating at the appropriate speed. Note: Make sure the speed potentiometer has not been dialed down to zero! 5. Adjust the heater temperature setpoint (refer to heater controller manual for proper adjustment procedures). 6. Tum on heat power. Allow temperature to stabilize (if serious undershoot or overshoot occurs, re-tune heater control using procedure outlined in heater control manual). 4-11

31 System Operation Denton Vacuwn, Inc. Discoveryf\1-18 Deposition System 4.4 PLASMA PROCESSING DC SPUTTERING (CATHODES 1, 2, OR 3) 1. Ensure that main chamber has been pumped to a state of high vacuum and that substrate has been transferred from the loadlock onto the substrate table (refer to Section 4.3.1). 2. Toggle the "AUTO ENABLE" keyswitch so that the "AUTO ENABLE" LED indicator is not flashing. 3. Establish a suitable flow of gas into the chamber; achieving a process pressure of > 1 mtorr indicated by the MKS 127A capacitance manometer (refer to Section 4.3.3). 4. Verify and ensure that a the MDX1.5K DC power supply is set for "Power Regulation". 5. Program the Ramp Timer on the MDX1.5K DC power supply. The Ramp Timer is adjusted by first pressing the MDX's "SETPT" switch until the "SECONDS" LED lights on the unit's right hand display and then adjusting the "RAMP ADJUST" potentiometer. Five to ten seconds is generally a suitable period. 6. Program the Setpoint Level on the MDX1.5K DC power supply. The Setpoint Level is adjusted by first pressing the MDX's "SETPT" switch until the "WATIS" LED lights on the unit's right hand display and then adjusting the "LEVEL" potentiometer. 7. Ensure that the "INTLK" LED is illuminated. This LED is illuminated when the safety interlocks to the power supply are satisfied (Refer to Section 6 of this manual). 8. Close all cathode shutters. 9. Turn on substrate rotation. Verify that the substrate stage is rotating at the appropriate speed Note: Make sure the speed potentiometer has not been dialed down to zero! 4-12

32 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 10. Select the desired sputter cathode by toggling the "Sputter Head Select" Keyswitch. The active sputter head will be indicated by a continuously illuminated LED above the "Sputter Head #1/#2/#3" display pads. Note: Never change the active sputter head while the MDX power supply is operational In addition, it is good practice to "park" the DC switching network in the "off" position (i.e., none of the "Sputter Head #1/#2/#3" display pads are illuminated) when the DC supply is not in use. 11. Apply power to the cathode by depressing the "OUTPUT ON" key. At this point power will be ramped to the preset level over the preset period! 12. Soak (Le., presputter) the target for approximately 15 to 30 seconds. Presputtering is necessary to insure the target's thermal equilibrium and a clean (on an atomistic scale) target. 13. Verify once again that the substrate is rotating. 14. Open the corresponding cathode shutter. Deposit for the prescribed time period. 15. Turn off power to the cathode by depressing the "OUTPUT OFF" key. 16. Close the cathode shutter. 17. Turn off substrate rotation. 18. Close process gas isolation valve(s). 19. Ensure that the loadlock is in vacuum status. 20. Transfer sample from main chamber to system loadlock (refer to Section 4.3.2). 21. Allow substrate to cool under vacuum before exposure to atmospheric pressure. This step is necessary to ensure that the freshly deposited film will not be oxidized. 4-13

33 University of Utah. Job #: System Operation Denton Vacuwn, Inc. DiscoveryT\1-l8 Deposition System RF SPUTTERING (CATHODES 1 AND 2) 1. "Park" the DC switching network in the "off" position (i.e., none of the "Sputter Head #1/#2/#3" display pads are illuminated). Even though RF blocking filters are installed in the DC inputs to the Cathode 1 and Cathode 2 matching networks, it always pays to take the safest system approach. 2. Ensure that main chamber has been pumped to a state of high vacuum and that substrate has been transferred from the loadlock onto the substrate table (refer to Section 4.3.1). 3. Toggle the "AUTO ENABLE" keyswitch so that the "AUTO ENABLE" LED indicator is not flashing. 4. Establish a suitable flow of gas into the chamber; achieving a process pressure of > 1 mtorr indicated by the MKS 127A capacitance manometer (refer to Section 4.3.3). 5. Verify the setpoint of the RF power supply you intend to use. Remember: you don't know what output level was programmed by the previous user of the system!!! 6. Momentarily place the corresponding ATX600 automatic matching network in manual mode. Ensure that the ATX 600 display is indicating capacitor position. Manually adjust BOTH capacitor positions to the center of the control span. This action will preset the networks capacitors in the center position; an ideal location to start a matching algorithm (Preset 1 and Preset 2 can also be used to achieve this goal. Please refer to the ATX600 manual for further instructions.) 7. Close cathode shutter (if open). 8. Turn on substrate rotation. Verify that the substrate stage is rotating at the appropriate speed. Note: Make sure the speed potentiometer has not been dialed down to zero! 4-14

34 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 9. Verify that all interlocks are satisfied and reset the interloc k string by depressing the "RF OFF" toggle switch. If all interlocks are satisfied the "RF OFF" and "INTLK" indicators will be steadily illuminated. 10. Turn on the RF power by depressing the "RF ON" key. In general, it will be difficult to light off the RF target if there are no other sources of electrons in the chamber. A convenient way to ensure ignition is to momentarily raise system pressure (by closing the hivac valve until ignition occurs) OR lighting off (with closed shutter) one of the other cathodes with the DC power supply. If an RF discharge is established which is not stable then it may be necessary to repeat step #6 to re-initialize the matching network. Once a stable plasma is established, the process pressure can be dropped to approximately 1 millitorr (if required). 11. Soak (Le., presputter) the target for approximately 1 to 2 minutes. Presputtering is necessary to insure thermal equilibrium and a clean (on an atomistic scale) target. 12. Verify once again that the substrate is rotating. 13. Open the cathode shutter. Deposit for the prescribed time period. 14. Close the cathode shutter. 15. Turn off the RF power by depressing the "RF OFF" key. 16. Turn off substrate rotation. 17. Close process gas isolation valve(s). 18. Transfer sample from main chamber to system loadlock (refer to Section 4.3.2). 19. Allow substrate to cool under vacuum before exposure to atmospheric pressure. This step is necessary to ensure that the freshly deposited film will not be oxidized. 4-15

35 University of Utah, Job #: ISoo3 System Operation Denton Vacuwn, Inc. Discoveryn.qS Deposition System RF BIAS This system has been delivered to the University of Utah with an RF bias stage. assumed that at some point in the future, an RFX600 power supply and ATX600 matching network will be installed on the system. It is 1. Ensure that main chamber has been pumped to a state of high vacuum and that substrate has been transferred from the loadlock onto the substrate table (refer to Section 4.3.1). \ 2. Toggle the "AUTO ENABLE" keyswitch so that the "AUTO ENABLE" LED indicator is not flashing. 3. Establish a suitable flow of gas into the chamber; achieving a process pressure of > 1 mtorr indicated by the MKS 127A capacitance manometer (refer to Section 4.3.3). 4. Verify the setpoint of the RF Bias power supply. Remember: you don't know what output level was programmed by the previous user of the system!!! 5. Momentarily place the Bias ATX600 automatic matching network in manual mode. Ensure that the ATX600 display is indicating capacitor position. Manually adjust BOTH capacitor positions to the center of the control span. This action will preset the networks capacitors in the center position; an ideal location to start a matching algorithm (Preset 1 and Preset 2 can also be used to achieve this goal. Please refer to the ATX600 manual for further instructions.) 6. Turn on substrate rotation. Verify that the substrate stage is rotating at the appropriate speed. Note: Make sure the speed potentiometer has not been dialed down to zero! 7. Verify that all interlocks are satisfied and reset the interlock string by depressing the "RF OFF" toggle switch. If all interlocks are satisfied the "RF OFF" and "INTLK" indicators will be steadily illuminated. 4-16

36 System Operation Denton Vacuwn, Inc. DiscoveryTM-18 Deposition System 8. Tum on the Bias RF power by depressing the "RF ON" key. In general, it will be difficult to light off the RF target if there are no other sources of electrons in the chamber. A convenient way to ensure ignition is to momentarily raise system pressure (by closing the hivac valve until ignition occurs) OR lighting off (with closed shutter) one of the sputter cathodes with the DC power supply. If an RF discharge is established which is not stable then it may be necessary to repeat step #6 to re-initialize the matching network. Once a stable plasma is established, the process pressure can be dropped to approximately 1 millitorr (if required). 9. At this point additional RF/DC plasma processing (refer to Sections and 4.4.2) may be initiated. 10. At the conclusion of all in-situ processing, tum off the Bias RF power by depressing the "RF OFF" key. 11. Tum off substrate rotation. 12. Close process gas isolation valve(s). 13. Transfer sample from main chamber to system loadlock (refer to Section 4.3.2). 14. Allow substrate to cool under vacuum before exposure to atmospheric pressure. This step is necessary to ensure that the freshly deposited film will not be oxidized. 4.5 CATHODE CONSTRUCTION Removal/reinstallation of a cathode backing plate (necessary for bonded target changes) can be achieved by the following procedures. Please be sure to refer to the 3.0" cathode assembly drawing (C ) and the balloon descriptions which are listed in Section

37 System Operation Denton Vacuwn, Inc. Disclweryn'-18 Deposition System CATHODE DISASSEMBLY 1. Close the cathode water supply and return valves. These valves are located by the utility service plate on the system frame. 2. Make sure all power supplies are completely powered down. 3. Disconnect the power lead to cathode. Make sure the connector body is supported as the shell is loosened. 4. Remove the three, 4-40 socket head cap screws (#26) which secure the utility housing (#16) to the connector body (#15). Place the screws in a container which cannot be tipped over! Gently slide the utility housing back over the two 0.25" water lines. Ensure that all internals are exposed and accessible. 5. Locate a metal pan or dish. Mark both water lines as to where they are inserted on the water manifold (#5). Loosen both water fittings and place both water lines in the tray to drain. 6. Grasp the shaft of the cathode and at the same time remove the water manifold (#5) from the tube. The water manifold may require a wrench to loosen it from the body. Extract the manifold from the tube and ensure that the internal o-ring (#32) has not been dislodged. 7. Remove the thin nut (#22) from the tube. Loosen the two socket head set screws (#30) in the connector body and gently slide the connector body off the tube. 8. Ensure that the main chamber is vented to atmospheric pressure. 9. Loosen the split collar which secures the cathode's shutter blade to the shutter rotary motion. Remove the shutter blade. 10. Disengage the two gas struts which support the chamber's top plate. Tilt the plate back so that the cathode is completely exposed. NOTE: This is a two person job!! 4-18

38 System Operation Denton Vacuwn. Inc. DiscoveryTM-18 Deposition System 11. Remove the split collar which secures the cathode shaft above the chamber lid's compression fitting. Loosen the shaft tube compression fitting and GENTLY slide the cathode down through the fitting. BE CAREFUL!!! The outside shaft of the cathode is a sealing surface. Slide the cathode out straight and try not to rock it from side to side. Any small scratches can be buffed out later with 320 grit emery paper. 12. Gently lower the chamber top plate so that it rest's on the seal surface. 13. Remove the three socket head cap screws (#20) which secure the dark space shield cover (#10) to the seal base assembly (#11). Remove the dark space shield cover. 14. Place the cathode body on a work bench and position the tube vertically. Grasp the shaft and at the same time loosen and then remove the compression nut (#21). Remove the metal washer (#23) and the alumina washer (#14). Slide the seal base assembly (#11) up and over the alumina insulator tube (#13). Inspect the seal base assembly's o-ring (#27) for and nicks or debris and place face down on a clean surface. 15. Slide the alumina insulator tube (#13) over the base assembly (#3) and then slide the alumina seal washer (#12) over the base assembly (#3). 16. Remove the vented, socket head cap screws (#28) which secure the backing plate assembly (#2) to the base assembly (#3). DO NOT LOSE THESE SCREWS!! After all the screws ore removed, gently twist/slide the backing plate straight down and off the base assembly. Inspect the o-ring (#31) for damage and.debris. Ensure that the backing plate seal surface is not scratched. 17. At this point the magnet assembly may be removed from the backing plate. Drain all water from the backing plate. Remove the stand-off bushing (#29) then grasp the pole piece (#7) between thumb and forefinger; pull straight out CATHODE RE-ASSEMBLY/SYSTEM INSTALLATION 1. Using a Magnaprobe, ensure that the polarity between the inner and outer magnet races (#38 and #39), as they are mounted on the pole piece (#7), is OPPOSED! If 4-19

39 System Operation Denton Vacuwn, Inc. DiscoveryT\1-18 Deposition System these two magnets show the same polarity then the device will no longer function as a magnetron!! 2. Insert the magnet assembly (magnets face down) into the backing plate (#2) by grasping the pole piece between the thumb and forefinger and pushing straight down. Ensure that both magnets are seated into the recesses which have been machined in the bottom of the backing plate. Insert the stand-off bushing (#29). 3. Remove the a-ring (#31) from the base assembly (#3). Clean the sealing surface with a lint-free cloth. Ensure that the a-ring is damage free, debris free, and lightly greased with silicon hi-vacuum grease (Dow Corning DC976 or equivalent). Insert the a-ring (#31) on the base assembly. Be careful not to twist the a-ring (pay attention to the a-rings parting line!!) as it is inserted onto the step. Note: Lightly greased implies that a small amount of grease was first applied to thumb and forefinger and then transferred to the o-ring in a reciprocating manner so that it appears shiny under an inspection light. Do not apply excessive grease. 4. Place the backing plate assembly face down (i.e. target side down) on a work surface. Grasp the base assembly (#3) and insert it straight into the backing plate's recess. Make sure the backing plate's threaded holes line up with the base assembly's counter-bored, thru-holes before the two assemblies are joined. Keep the parts straight and do not apply excessive pressure. Insert the vented, socket head cap screws (#28) which secure the backing plate assembly (#2) to the base assembly (#3) and tighten in a star pattern until snug. CAUTION: Over-tightening these screws will damage the backing plate! 5. Ensure that the base's upper a-ring (#27) is damage free, debris free, and lightly greased with silicon hi-vacuum grease (Dow Coming DC976 or equivalent). Clean and inspect the alumina seal washer (#12) for chips/scratches; slide over the base assembly (#3). Clean and inspect the alumina insulator tube for chips/scratches; slide over the base assembly (#3). 6. Ensure that the seal base's lower a-ring (#27) is damage free, debris free, and lightly greased with silicon hi-vacuum grease (Dow Corning DC976 or equivalent). Slide the seal base assembly (#11) down over the alumina insulator tube (#13). 4-20

40 System Operation Denton Vacuwn, Inc. DiscoverylM-18 Deposition System 7. Slide the alumina washer (#14) and then the metal washer (#23) over the threaded portion of the base assembly (#3). Thread on the compression nut (#21) and fmger tighten. Ensure that both washers are aligned with the outside of the seal base shaft (If they are not aligned then it will be impossible to reinsert the stalk through the chamber lid compression fitting). Grasp the backing plate and tighten the compression nut. Ensure that the two washers do not slip out of alignment during the tightening process. Make sure that there is a robust compression on the two o-rings (#27) in the base and seal base. 8. Attach the dark space shield cover (#10) to the seal base assembly (#11) with the three socket head cap screws (#20). 9. Tilt the top-plate back. NOTE: This is a two person job!! 10. Gently slide the cathode shaft through the chamber lid compression fitting. BE CAREFUL!!! The outside shaft of the cathode is a sealing surface. Slide the cathode in straight and try not to rock it from side to side. Once the cathode is inserted to the proper source to substrate distance, attach the split collar which secures the cathode shaft above the chamber lid's compression fitting. Tighten the shaft tube compression fitting. 11. Re-connect the two gas struts which support the chamber's top-plate. 12. Re-attach the cathode shutter blade by tightening the split collar which secures it to the shutter rotary motion. Align the blade so that it completely covers the target. 13. Gently slide the connector body (#15) onto the seal base tube until the power connector (#17) touches the lower compression nut (#21). Tighten the two socket head set screws (#30) in the connector body and insert/tighten the thin nut (#22) with a wrench. 14. Grasp the shaft of the cathode and insert/tighten the water manifold (#5). Prevent the cathode from spinning in the chamber lid compression fitting during this operation. 4-21

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur 208016, Uttar Pradesh, India Centre for Lasers and Photonics Enquiry no.: CELP/RV/EQP/MHR/2017/1 Enquiry date: 23/04/2018 Closing date: 17/05/2018 Sealed quotations

More information

DENTONVACUUM DESKV DESK V - SPUTTER/ETCH UNIT AND ACCESSORIES

DENTONVACUUM DESKV DESK V - SPUTTER/ETCH UNIT AND ACCESSORIES DENTONVACUUM DESKV DESK V - SPUTTER/ETCH UNIT AND ACCESSORIES Desk V Desk V Desk V TSC DENTON VACUUM, LLC 1259 N. CHURCH STREET MOORESTOWN, NJ 08057 PHONE: 856-439-9100 FAX: 856-439-9111 WWW.DENTONVACUUM.COM

More information

SPI Supplies Vacu Prep II TM Operation Manual

SPI Supplies Vacu Prep II TM Operation Manual TM Operation Manual # 12200-AB 12200-AX Structure Probe, Inc. / 569 East Gay Street West Chester, PA 19380 Toll-free from USA/Canada: 1-(800)-2424-SPI Phone: 1-(610)-436-5400 FAX: 1-(610)-436-5755 E-mail:

More information

AccuSputter AW 4450-Series Sputtering Deposition Systems

AccuSputter AW 4450-Series Sputtering Deposition Systems AccuSputter AW 4450-Series Sputtering Deposition Systems All Specification and information here are subject to change without notice and can not be used for purchase and facility planning. AccuSputter

More information

Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES

Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES Temescal FC-1800 Electron Beam evaporator system SYSTEM DESCRIPTION 18 diameter water cooled stainless steel chamber. 18 diameter x 8

More information

Sputter System. SPS-R2R series. ULTECH Co., Ltd.

Sputter System. SPS-R2R series. ULTECH Co., Ltd. Sputter System SPS-R2R series Introduction System Picture (reference) Process 1) Application : 2) Sputtering material : TCO (ITO,AZO,ZnO), Metal 3) Film width : max. 100mm 4) Film length : max. 100M 4)

More information

Pirani Vacuum Gauges. Digital and Analog Vacuum Gauge Systems. Features and Benefits. HPS Products (800) (303)

Pirani Vacuum Gauges. Digital and Analog Vacuum Gauge Systems. Features and Benefits. HPS Products (800) (303) Pirani Vacuum Gauges Digital and Analog Vacuum Gauge Systems Features and Benefits Ideal vacuum gauge for foreline loadlocks Rugged filament design for high reliability Designed for use in harsh process

More information

Induction Power Supplies

Induction Power Supplies Induction Power Supplies 7.5kW; 135 400kHz 480V version (Integral Heat Station) User s Guide Model 7.5-135/400-3-480 SMD Control Brds Rev. D 5/08 Table of Contents 1. Specifications and features...3 2.

More information

HEX KORVUS TECHNOLOGY VERSATILE COATING SYSTEM FOR THIN FILM DEVELOPMENT SPUTTERING ORGANICS DEPOSITION

HEX KORVUS TECHNOLOGY VERSATILE COATING SYSTEM FOR THIN FILM DEVELOPMENT SPUTTERING ORGANICS DEPOSITION KORVUS TECHNOLOGY HEX SPUTTERING ORGANICS DEPOSITION VERSATILE COATING SYSTEM FOR THIN FILM RESEARCH AND DEVELOPMENT E-BEAM EVAPORATION EDUCATION AND TRAINING GLOVEBOX COMPATIBLE THE OLD FISHERY, HOLCOMBE

More information

CFM 1050 Reactive Closed Field Magnetron Sputtering System

CFM 1050 Reactive Closed Field Magnetron Sputtering System Applied Multilayers LLC 1801 SE Commerce Avenue Battle Ground, WA 98604 United States Phone: +1 978 815 2667 Fax: +1 978 703 0991 CFM 1050 Reactive Closed Field Magnetron Sputtering System Applied Multilayers

More information

Advantage-D. Operating Instructions and Maintenance Manual. Central Vacuum Systems (Expandable/Modular Models) (Ver.

Advantage-D. Operating Instructions and Maintenance Manual. Central Vacuum Systems (Expandable/Modular Models) (Ver. Advantage-D Series 3 Central Vacuum Systems (Expandable/Modular Models) (Ver. 8/05) Operating Instructions and Maintenance Manual DESCRIPTION The Becker Advantage-D and Advantage-L central vacuum systems

More information

Title: CHA Flash Source

Title: CHA Flash Source Fabrication Laboratory Revision: D Rev Date: 01/17/2011 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the CHA Flash Source. All users

More information

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL Content 1. Introduction...2 2. Important safety instruction...3 3. System component...4 4. Engineering design overview...5 5. Installation...6

More information

TM Vacuum Sputter System SOP

TM Vacuum Sputter System SOP TM Vacuum Sputter System SOP Page 1 of 17 TM Vacuum Sputter System SOP 1 Scope 1.1 This document provides the procedures and requirements to operate the TM Vacuum Sputter system. 2 Table of Contents 1

More information

TECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER

TECHNICAL PAPER 1002 FT. WORTH, TEXAS REPORT X ORDER I. REFERENCE: 1 30 [1] Snow Engineering Co. Drawing 80504 Sheet 21, Hydraulic Schematic [2] Snow Engineering Co. Drawing 60445, Sheet 21 Control Logic Flow Chart [3] Snow Engineering Co. Drawing 80577,

More information

SECTION B1: MACHINE COMPONENTS

SECTION B1: MACHINE COMPONENTS SECTION B1: MACHINE COMPONENTS The machine portion of the Injected Metal Assembly system provides the means for: holding, heating and injecting the alloy; distributing and controlling electrical, pneumatic,

More information

TURBOMOLECULAR PUMPS ATP SERIES

TURBOMOLECULAR PUMPS ATP SERIES TURBOMOLECULAR PUMPS ATP SERIES TURBOMOLECULAR PUMPS ATP SERIES Introduction The ATP conventional turbomolecular pumps have a proven track record of reliability. Rotors made exclusively from carefully

More information

Pressure & Vacuum Measurement. Series 355 & 358. Solutions. Micro-Ion Vacuum gauge and Controller

Pressure & Vacuum Measurement. Series 355 & 358. Solutions. Micro-Ion Vacuum gauge and Controller w w w. m k s i n s t. c o m Pressure & Vacuum Measurement Solutions Series 355 & 358 Micro-Ion Vacuum gauge and Controller Description The Series 358 Controller is designed specifically to obtain the highest

More information

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited. SERVICE MANUAL ELECTRIC BRAISING PANS (30 & 40 GALLON) VE30 VE40 ML-126849 ML-126850 VE40 SHOWN - NOTICE - This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used

More information

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version MD10 Engine Controller Installation and User Manual for the MD10 Engine Controller. Full Version File: MartinMD10rev1.4.doc May 16, 2002 2 READ MANUAL BEFORE INSTALLING UNIT Receipt of shipment and warranty

More information

TE 91 PRECISION ROTARY VACUUM TRIBOMETER

TE 91 PRECISION ROTARY VACUUM TRIBOMETER TE 91 PRECISION ROTARY VACUUM TRIBOMETER Description The TE 91 Precision Rotary Vacuum Tribometer is based on a bench mounted test chamber. A motor driven test spindle, in the form of standard rotary feedthrough,

More information

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone.

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone. INSTALLATION & OPERATION MANUAL Fan Powered Terminals VAV TERMINALS IOM FAN POWERED TERMINALS Receiving Inspection After unpacking the terminal, check it for shipping damage. If any shipping damage is

More information

PREPOINT CHAMFER GRINDER MODEL Section 1. Set up and operation

PREPOINT CHAMFER GRINDER MODEL Section 1. Set up and operation PREPOINT CHAMFER GRINDER MODEL 6-94 Set up and operation Section 1 1. Installation of the proper size collet. This machine used a 5-C style collet. This can be changed by loosening of he set screw located

More information

Maintenance Information

Maintenance Information 16573370 Edition 2 February 2014 Air Grinder 99V Series Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings, and to avoid these

More information

Section 7 - Troubleshooting Guide

Section 7 - Troubleshooting Guide Section 7 - Troubleshooting Guide Section 7 - Troubleshooting Guide IMPORTANT While this troubleshooting guide provides information to aid in troubleshooting problems with the range, it does not contain

More information

SECTION B: SYSTEM OPERATING COMPONENTS

SECTION B: SYSTEM OPERATING COMPONENTS SECTION B: SYSTEM OPERATING COMPONENTS A brief description of the machine, Cable Processor Module and tooling will provide a better understanding of the various functions of the IMA system. SECTION B1:

More information

Centrifuge Operator / Service Manual

Centrifuge Operator / Service Manual 3000 Centrifuge Centrifuge Operator / Service Manual cat.# 26230 & 26231 The Q-sep 3000 centrifuge complies with all requirements of UL standard 3101 20, Can/CSA C22.2 No. 1010.1, and Can/CSA C22.2 No.

More information

CHA-50 Evaporator Operation

CHA-50 Evaporator Operation CHA-50 Evaporator Operation Roger Robbins 7/8/2009 John Maynard The University of Texas at Dallas ERIK JONSSON SCHOOL OF ENGINEERING AUTHORS: Roger Robbins, John Maynard Page 1 of 18 CHA-50 Evaporator

More information

BX-308 BAM-1020 SERVICE TOOL KIT MANUAL

BX-308 BAM-1020 SERVICE TOOL KIT MANUAL BX-308 BAM-1020 SERVICE TOOL KIT MANUAL Met One Instruments, Inc 1600 Washington Blvd. Grants Pass, Oregon 97526 Telephone 541-471-7111 Fax: 541-471-7116 BX-308-9800 Copyright 2008 Met One Instruments,

More information

Series 275 Mini-Convectron Vacuum Gauge Module with Nonlinear Analog Outputs and Process Control Relays Instruction Manual

Series 275 Mini-Convectron Vacuum Gauge Module with Nonlinear Analog Outputs and Process Control Relays Instruction Manual Series 275 Mini-Convectron Vacuum Gauge Module with Nonlinear Analog Outputs and Process Control Relays Instruction Manual Instruction Manual Instruction manual part number 275512 Revision E- July 2017

More information

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference. AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference. MODEL MC 3000 SPECIFICATION Input Volts: 208-230/430 VAC, 60Hz, 3 Phase

More information

To ensure proper installation, digital pictures with contact information to before startup.

To ensure proper installation,  digital pictures with contact information to before startup. Check List for Optimal Filter Performance [ ] There should be no back-pressure on the flush line. A 1 valve should have a 2 waste line, and 2 valve should have a 3 waste line. Do not use rubber hosing

More information

Temperature Sensor Series

Temperature Sensor Series GENERAL DESCRIPTION The patented* No. 85026-Series Temperature Sensor contains a two-position valve operated by temperature variations around the integral sensing bulb. It is used to vent or block a pneumatic

More information

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2 SD-03-832 Bendix E-10PR Retarder Control Brake Valve MOUNTING PLATE SUPPLY 4 PORTS ELECTRICAL AUXILIARY DESCRIPTION TREADLE RETARDER CONTROL SECTION EXHAUST DELIVERY 4 PORTS FIGURE 1 - E-10PR RETARDER

More information

EAGLETRON II REMOTE CONTROL OPERATOR and MAINTENANCE. Remote Control Procedure

EAGLETRON II REMOTE CONTROL OPERATOR and MAINTENANCE. Remote Control Procedure EAGLETRON II REMOTE CONTROL OPERATOR and MAINTENANCE Remote Control Procedure WARNING! DO NOT OPERATE REMOTE CONTROL UNLESS YOU HAVE A CLEAR VIEW OF THE REAR OF THE TRAILER. WARNING! THE OPERATOR IS REQUIRED

More information

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood TABLE OF CONTENTS 1. General valve description and start-up... 1 2. Main valve maintenance... 1 3. Pilot maintenance... 5 4. Pilot

More information

Throttling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012

Throttling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012 Throttling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012 This procedure covers the replacement of the gate O-ring of the Nor-Cal Pendulum Gate Valve, with the gate valve housing installed

More information

Varian, Inc. Vacuum Technologies. TPS Turbo Pumping Systems. Features and Benefits 2-3. Mini-TASK AG TPS-compact 6-7

Varian, Inc. Vacuum Technologies. TPS Turbo Pumping Systems. Features and Benefits 2-3. Mini-TASK AG TPS-compact 6-7 Varian, Inc. Vacuum Technologies TPS Turbo Pumping Systems Features and Benefits 2-3 Mini-TASK AG81 4-5 TPS-compact 6-7 TPS-mobile and TPS-bench 8-10 TPS Turbo Pumping Systems Features and Benefits The

More information

Gate valve control system Series 64

Gate valve control system Series 64 ate valve control system Series ontrol and isolation valve eneral purpose stainless steel valve daptive pressure control with stepper motor or throttling by adjustable 3-position pneumatic actuator ody

More information

ALTERNATOR - BOSCH 35/75-AMP & 40/90-AMP

ALTERNATOR - BOSCH 35/75-AMP & 40/90-AMP ALTERNATOR - BOSCH 35/75-AMP & 40/90-AMP 1988 Chrysler LeBaron Convert/Coupe 1988 ALTERNATORS & REGULATORS Chrysler Motors - Bosch 35/75 & 40/90 Amp Alternator All Models DESCRIPTION The charging system

More information

MMATERIALS. Vacuum M 01. Magnetrons... M 02. MATERIALS / Inorganics & thin films guide

MMATERIALS. Vacuum M 01. Magnetrons... M 02. MATERIALS / Inorganics & thin films guide MMATERIALS Vacuum Deposition Magnetrons... M 02 M M 01 MATERIALS Vacuum Deposition Equipment Magnetrons Magnetrons Magnetrons CIRCULAR MAGNETRONS Our circular magnetrons have rapidly become recognized

More information

Tekleen GB6 & GB7 USERS AUTOMATIC FILTERS, INC. MANUAL

Tekleen GB6 & GB7 USERS AUTOMATIC FILTERS, INC. MANUAL AUTOMATIC FILTERS, INC. 67 S. LA CIENEGA BLVD. LOS ANGELES, CA 90034 30 839 88 800 336 94 FAX 30 839 6878 www.tekleen.com info@tekleen.com Tekleen GB6 & GB7 USERS MANUAL GB6 & GB7 USERS MANUAL AUTOMATIC

More information

3 Phase Smart Controller

3 Phase Smart Controller 3 Phase Smart Controller Installation and Owner s Manual STP-SCIII 208-230 VAC, 60Hz, 120 Volt Coil Franklin Fueling 3760 Marsh Rd. Madison WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838

More information

UPC5000/UPC5010. Operation & Maintenance Manual. Portable & Rack-mountable Pneumatic Pressure Calibration Console

UPC5000/UPC5010. Operation & Maintenance Manual. Portable & Rack-mountable Pneumatic Pressure Calibration Console UPC5000/UPC5010 Portable & Rack-mountable Pneumatic Pressure Calibration Console Operation & Maintenance Manual CONDEC Sales Phone No. (888) 295-8475 CONDEC Web Site: www.4condec.com 63256 Contents About

More information

1. Disclaimer Warnings Introduction Display and Commands... 5

1. Disclaimer Warnings Introduction Display and Commands... 5 1. Disclaimer... 1 2. Warnings... 2 2.1. Welding... 2 3. Introduction... 3 4. Display and Commands... 5 4.1. Status Display on LCD... 5 4.1.1. Control Mode... 6 4.1.2. Bowl Mode... 6 4.1.3. Engine Mode...

More information

ADVANCED CUSTOMIZED ELECTRO PNEUMATIC TRAINER (PRODUCT CODE: SAP 20B)

ADVANCED CUSTOMIZED ELECTRO PNEUMATIC TRAINER (PRODUCT CODE: SAP 20B) The Advanced Customized Electro Pneumatic Trainer (SAP 20B) is capable of being used to demonstrate the design, construction and application of electro-pneumatic components and circuits. Objectives:- The

More information

CENTAC Inlet and Bypass Valve Positioners

CENTAC Inlet and Bypass Valve Positioners CENTAC Inlet and Bypass Valve Positioners INGERSOLL-RAND AIR COMPRESSORS INLET AND BYPASS VALVE POSITIONERS Copyright Notice Copyright 1992, 1999 Ingersoll-Rand Company THIS CONTENTS OF THIS MANUAL ARE

More information

MODUL-CONNECT 1.2. Owner s Manual. Modular, digital wiring and control system. Document Part Number MSMC Rev 9 (04/18)

MODUL-CONNECT 1.2. Owner s Manual. Modular, digital wiring and control system. Document Part Number MSMC Rev 9 (04/18) MODUL-CONNECT 1.2 Modular, digital wiring and control system Owner s Manual Document Part Number MSMC Rev 9 (04/18) Service Contact Information E-mail: info@modul-system.com Phone: +46 31 746 87 00 Web:

More information

Differentially Pumped Rotary Platform (DPRP) Instructions

Differentially Pumped Rotary Platform (DPRP) Instructions Differentially Pumped Rotary Platform (DPRP) Instructions Linear and lateral alignment is maintained by a special ball bearing made of hardened carbon steel. These bearings will corrode. Do not allow moisture

More information

3-PHASE SMART CONTROLLER STP-SCIIIC INSTALLATION GUIDE

3-PHASE SMART CONTROLLER STP-SCIIIC INSTALLATION GUIDE 3-PHASE SMART CONTROLLER STP-SCIIIC INSTALLATION GUIDE The information in this publication is provided for reference only. While every effort has been made to ensure the reliability and accuracy of the

More information

TERMINATOR User Manual

TERMINATOR User Manual TERMINATOR User Manual TERMINATOR User Manual Table of Contents Section Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Introduction Safety Precautions Features and Benefits Overview of the

More information

4000 SYSTEM OPERATING MANUAL

4000 SYSTEM OPERATING MANUAL 4000 SYSTEM OPERATING MANUAL REV 1.4 COPYRIGHT 1996 Xenotech, Inc. PAGE 1 INSTRUCTIONS FOR REMOVING AND INSTALLING A TYPE XT XENON BULB IN A BL4000 FIXTURE NOTE FAMILIARIZE YOURSELF WITH THE LOCATION AND

More information

PRODUCT SELECTION GUIDE 651, 1651, 153, 253, 653, and heated valves. Pressure Control Techniques. Dynamic Range

PRODUCT SELECTION GUIDE 651, 1651, 153, 253, 653, and heated valves. Pressure Control Techniques. Dynamic Range Valve Solutions w w w. m k s i n s t. c o m Downstream Pressure Controllers and Valves PRODUCT SELECTION GUIDE 651, 1651, 153, 253, 653, and heated valves Isolating and close-loop controlling each variable

More information

Section of 14. Ice and Rain Protection

Section of 14. Ice and Rain Protection Ice & Rain Protection 1 of 14 WINDSCREEN WIPERS General The aircraft is fitted with two windscreen wipers, one on each pilots side windscreen, which are controlled by a 3-position (FAST, SLOW and MANUAL)

More information

M V Intake Manifold INSTRUCTION SHEET

M V Intake Manifold INSTRUCTION SHEET Please visit www.fordracingparts.com for the most current instruction information.!!! PLEASE READ ALL OF THE FOLLOWING INSTRUCTIONS CAREFULLY PRIOR TO INSTALLATION. AT ANY TIME YOU DO NOT UNDERSTAND THE

More information

Fisher 657 Diaphragm Actuator Sizes and 87

Fisher 657 Diaphragm Actuator Sizes and 87 Instruction Manual 657 Actuator (30-70 and 87) Fisher 657 Diaphragm Actuator Sizes 30 70 and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Installation... 3 Mounting

More information

M-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components

M-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components Introduction The Pro Manifolds with Integrated adaptor are designed for use in Hydronic radiant panel heating and cooling applications. They are available in various sizes, configurations, and options

More information

Clean Air Products Straight Thru Standard Profile Single Door Air Shower Purchase Specification

Clean Air Products Straight Thru Standard Profile Single Door Air Shower Purchase Specification Clean Air Products Straight Thru Standard Profile Single Door Air Shower Purchase Specification 1. Purpose This specification describes a single person air shower (aka decontamination shower) used to remove

More information

Maintenance Information

Maintenance Information 16573321 Edition 3 February 2014 Air Grinder Series 61H Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings, and to avoid these

More information

Installation, Operating & Maintenance Instructions

Installation, Operating & Maintenance Instructions Electromechanical Linear Actuators Installation, Operating & Maintenance Instructions with parts list TAC Models with Clutch TAL Models with Limit Switches TAC Models with Limit Switches and Potentiometer

More information

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL APPLICATION OF DUST CONTROL EQUIPMENT: CAUTION - Warning Improper operation of dust control system may contribute to conditions in the work area or facility that could result in severe personal injury

More information

OFI MODEL 130 HTHP BENCHTOP CONSISTOMETER INSTRUCTIONAL MANUAL

OFI MODEL 130 HTHP BENCHTOP CONSISTOMETER INSTRUCTIONAL MANUAL OFI MODEL 130 HTHP BENCHTOP CONSISTOMETER INSTRUCTIONAL MANUAL OPERATING INSTRUCTIONS OFI MODEL 130 BENCHTOP HPHT CONSISTOMETER OFI MODEL 130 BENCHTOP HPHT CONSISTOMETER GENERAL The OFI Model 130 Consistometer

More information

Model DF233 Control Valve

Model DF233 Control Valve Figure 1 DF233 Control Valve TABLE OF CONTENTS Introduction 2 Body and Packing Reassembly 7 Specifications 3 Fail Closed Actuator Reassembly 8 Valve Sizes 3 Fail Open Actuator Reassembly 9 Unpacking 4

More information

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company Oreck Magnesium Series Service Manual The Oreck Manufacturing Company 08/2012 10/2011 The Oreck Manufacturing Company Contents Covering all Magnesium Upright Models Including: LW100, LW125, LW1000, AND

More information

Discrete Control Logic. 1. Pneumatic circuits. - Low forces - Discrete, fixed travel distances - Rotational or reciprocating motion

Discrete Control Logic. 1. Pneumatic circuits. - Low forces - Discrete, fixed travel distances - Rotational or reciprocating motion Discrete Control Logic 1. Pneumatic circuits - Low forces - Discrete, fixed travel distances - Rotational or reciprocating motion Main components: compressor, valves, cylinders Pneumatic components: cylinders

More information

DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS

DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS 4080 SE International Way. Suite B110, Milwaukie, OR 97222 (503) 654-0867 Fax: (503) 654-4671 email: ftech@filtertechnologyltd.com www.filtertechnologyltd.com DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE)

More information

BL7000 SYSTEM OPERATING MANUAL

BL7000 SYSTEM OPERATING MANUAL BL7000 SYSTEM OPERATING MANUAL REV 2.0 208 / 230V COPYRIGHT 1995 Xenotech, Inc. PAGE 1 POWER INPUT CONNECTOR WIRING INSTRUCTIONS THE INPUT POWER REQUIREMENTS FOR A 7 KW POWER SUPPLY ARE AS FOLLOWS. VOLTAGE

More information

T21 Thermal Differential Switch

T21 Thermal Differential Switch T21 Thermal Differential Switch General Instructions The T21 Point Level Switch is a state-of-the-art in liquid level and interface measurement and control. Level detection is accomplished by using a high-resolution

More information

Scientific vapor pumps

Scientific vapor pumps Scientific vapor pumps Vapor pumps for scientific instruments and R&D applications Diffusion pumps technology and applications - Diffstak -4 Diffstak installation - EO50/60-4 Diffstak combined outfits

More information

Series 307. Features & Benefits

Series 307. Features & Benefits Pressure & Vacuum Measurement Solutions w w w. m k s i n s t. c o m Series 307 Vacuum gauge Controller for use with Ionization, Convectron and Thermocouple gauge The Series 307 Vacuum Gauge Controller

More information

Installation Operation Maintenance ADDENDUM

Installation Operation Maintenance ADDENDUM Installation Operation Maintenance ADDENDUM Bulletin #: PS-IOM-HYPO2-0111-A FACTORY SERVICE POLICY If you are experiencing a problem with your Pulsafeeder pump, first review the IOM, and consult the troubleshooting

More information

Bray Series 70 Electric Actuator. Basic Product/Sales School

Bray Series 70 Electric Actuator. Basic Product/Sales School Bray Series 70 Electric Actuator What is the Bray S70? Electric Quarter Turn Valve Actuator Physically fits small to midsize valves Three Housing Sizes Ten Torque Ratings S70 Electric Actuator Sizes Housing

More information

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CLEAN ROOM DEVICES, LLC WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD600 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 2.1 LAST EDITED 7.25.14 DOCUMENT NUMBER 001 cleanroomdevices.com 1 Table of

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Automatic Insertion Heated Regulator High Voltage Model IHRA-4SS-220/230 100 or more inch insertion length The information in this manual has been

More information

Optimized Idle Aftermarket Installation Kits On-Highway Truck Applications (P/N: )

Optimized Idle Aftermarket Installation Kits On-Highway Truck Applications (P/N: ) 18SP655 Optimized Idle Aftermarket Installation Kits On-Highway Truck Applications (P/N: 23538534) KIT DESCRIPTION The Optimized Idle Aftermarket Installation Kit provides the components necessary for

More information

Agilent Turbo-V 750 and Turbo-V 850 TwisTorr. The new molecular-drag Technology

Agilent Turbo-V 750 and Turbo-V 850 TwisTorr. The new molecular-drag Technology Agilent Turbo-V 75 and Turbo-V 85 TwisTorr The new molecular-drag Technology The new molecular-drag technology What is TwisTorr 2 Agilent Technologies, presents the new TwisTorr molecular drag technology

More information

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER AIR INTAKE EMERGENCY SHUT-OFF VALVE C50254A PH3 AIR INTAKE SHUT-OFF VALVE WITH POWERGUARD SMART OVERSPEED LIMITER 2013-2017 DODGE 6.7L CUMMINS www.powerhalt.com INSTALLATION REQUIREMENTS & RECOMMENDATIONS:

More information

DWYER INSTRUMENTS, INC. Phone: 219/ P.O. BOX 373 MICHIGAN CITY, IN 46361, U.S.A. Fax: 219/

DWYER INSTRUMENTS, INC. Phone: 219/ P.O. BOX 373 MICHIGAN CITY, IN 46361, U.S.A. Fax: 219/ Series 43000 Capsu-Photohelic Pressure Switch/Gage Specifications - Installation and Operating Instructions Bulletin B-34 Ø4-3/4 [120.65] 3-7/8 SQ [98.43] 3/4 CONDUIT 4-3/8 [111.13] HOUSING REMOVAL 3-1/16

More information

Vacuum pumps for the ESRF EBS project Michael Hahn

Vacuum pumps for the ESRF EBS project Michael Hahn 3 rd Rencontres Nationales DU RESEAU TECHNOLOGIES DU VIDE SEVRIER, 10 13 October 2016 Vacuum pumps for the ESRF EBS project Michael Hahn On behalf of the EBS Accelerator Project Team OUTLINE Project definition

More information

Maintenance Manual WATER SUMP CONTROL VALVE F532B

Maintenance Manual WATER SUMP CONTROL VALVE F532B WATER SUMP CONTROL VALVE F532B LIST OF EFFECTIVE PAGES On a revised page, the portion of text or illustrations affected by the change is indicated by a vertical line in the outer margin of the page. When

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

MICRO-AIR DUST COLLECTOR Installation and Operation Manual MODEL RP6-2, RP-3, RP8-2 & RP-3

MICRO-AIR DUST COLLECTOR Installation and Operation Manual MODEL RP6-2, RP-3, RP8-2 & RP-3 MICRO-AIR DUST COLLECTOR Installation and Operation Manual MODEL RP6-2, RP-3, RP8-2 & RP-3 Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly

More information

Anderson Greenwood Series 800 POSRV Installation and Maintenance Instructions

Anderson Greenwood Series 800 POSRV Installation and Maintenance Instructions Before installation these instructions must be fully read and understood Table of contents 1. General valve description and start-up... 1 2. Main valve maintenance... 2 3. Pilot maintenance... 6 4. Pilot

More information

INSTALLATION AND CUSTOMER CARE INFORMATION 80 SERIES & 90 SERIES TREATMENT STATIONS

INSTALLATION AND CUSTOMER CARE INFORMATION 80 SERIES & 90 SERIES TREATMENT STATIONS INSTALLATION AND CUSTOMER CARE INFORMATION 80 SERIES & 90 SERIES TREATMENT STATIONS Customer Service and Technical Support: 8:00 AM to 5:00 PM central (M-Th) 8:00 AM to 4:30 PM central (Fri) Phone: 800-257-7407

More information

Valtek Auxiliary Handwheels and Limit Stops

Valtek Auxiliary Handwheels and Limit Stops Valtek Auxiliary s and Limit Stops Table of Contents Page 1 General information 2 Installation 2 Side-mounted handwheels, size 25 and 50 (linear actuators) 3 Side-mounted handwheels, size 100 and 200 (linear

More information

Solstice Electric Fryers SE Series Service Manual

Solstice Electric Fryers SE Series Service Manual Solstice Electric Fryers SE Series Service Manual L22-330 R1 (10/12) Notice In the event of problems or questions about your order, contact the Pitco Frialator factory at (603) 225-6684. In the event of

More information

Direct Gas-Fired Heating

Direct Gas-Fired Heating Direct Gas-Fired Heating Model DG 800 to 15,000 cfm Up to 1,600,000 BTU/hr Optional Evaporative Cooling January 2005 PRODUCT FEATURES Model DG Direct Gas-Fired Make-Up Air Unit The Greenheck model DG is

More information

OPERATOR S MANUAL StudPro LiteXI Pin Welder Stud Welding Products, Inc

OPERATOR S MANUAL StudPro LiteXI Pin Welder Stud Welding Products, Inc OPERATOR S MANUAL StudPro LiteXI Pin Welder CONTENTS Description Pages Safety 2 Specifications and Features 3 Product Components 4-5 Screen Operation 6-8 Setup and Welding 9-11 CD Gun Exploded View 12

More information

DO NOT INSTALL, OPERATE, OR MAINTAIN AN ATI PRODUCT UNLESS TRAINED AND QUALIFIED IN PRODUCT AND ACCESSORY INSTALLATION, OPERATION AND MAINTENANCE.

DO NOT INSTALL, OPERATE, OR MAINTAIN AN ATI PRODUCT UNLESS TRAINED AND QUALIFIED IN PRODUCT AND ACCESSORY INSTALLATION, OPERATION AND MAINTENANCE. IOM Supplement IOMS003 ATI HO1/HO2 HYDRAULIC OVERRIDE Scope of Supplement This supplement is intended to assist those who are involved with the installation, operation and maintenance of ATI Linear Actuators

More information

Thermal Evaporator System (Solar cell)

Thermal Evaporator System (Solar cell) Application > Perovskite solar cell, DSSC, OPV, OTFT Process Ca, Mg, Au, Al, Ag, LiF, Cr & MoO 3, TiO 2, Etc metal & Metal Oxide Process AlQ 3, C60, TPD, Pentacene, Etc Organic & Inorganic Process Perovskite

More information

Anderson Greenwood Series 400 Piston Pilot POPRV Installation and Maintenance Instructions

Anderson Greenwood Series 400 Piston Pilot POPRV Installation and Maintenance Instructions Before installation these instructions must be fully read and understood As capacity relief of the system is satisfied, system pressure will begin to decrease. When it does, the pilot will actuate and

More information

MODEL ELC-12/40-CVM-D BATTERY CHARGER

MODEL ELC-12/40-CVM-D BATTERY CHARGER NATIONAL RAILWAY SUPPLY MODEL ELC-12/40-CVM-D BATTERY CHARGER Installing, Operating and Service Instructions for the ELC-12/40-CVM-D Solid State Charger PLEASE SAVE THESE IMPORTANT SAFETY AND OPERATING

More information

Handy Lift LT Owners Manual

Handy Lift LT Owners Manual Installation and Operating Instructions - Service and Parts Information BURR 300 lb. Capacity Handy Lift LT PN 33170 (40 ) PN 33171 (45 ) PN 33172 (50 ) Avoid serious injury, or death, to yourself and

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual Bray/ VAAS Knife Gate Valve 760/762/765/766/767/768 Series Table of Contents Definition of Terms 1 Safety Instructions 1 Introduction 2 Unpacking 2 Storage 2 Installation 3 Commissioning 3 Cylinder-Operated

More information

K-SERIES SERVICE MANUAL

K-SERIES SERVICE MANUAL MARCH 2011 III. R MAINTENANCE AND REPAIR MAINTENANCE egular maintenance of the Ricon KlearVue Series platform wheelchair lift is required to help optimize its performance and reduce the need for repairs.

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS Series II OPERATING INSTRUCTIONS and MAINTENANCE MANUAL TANK MOUNTED DUPLEX MODELS (Version 5/99) CENTRAL VACUUM SYSTEMS DESCRIPTION The Becker Advantage-D and Advantage-L central vacuum systems are available

More information

Valve Solutions. Downstream Pressure Controllers and Valves PRODUCT SELECTION GUIDE TYPES 651, 1651, 153, 253, 653, AND HEATED VALVES

Valve Solutions. Downstream Pressure Controllers and Valves PRODUCT SELECTION GUIDE TYPES 651, 1651, 153, 253, 653, AND HEATED VALVES Valve Solutions W W W. M K S I N S T. C O M Downstream Pressure Controllers and Valves PRODUCT SELECTION GUIDE TYPES 651, 1651, 153, 253, 653, AND HEATED VALVES Downstream Pressure Controllers and Valves

More information

FS Fan-Coil Units Hi-Rise, Vertical

FS Fan-Coil Units Hi-Rise, Vertical FS Fan-Coil Units Hi-Rise, Vertical FSC Concealed Dimensional Data 4-PIPE 2-PIPE TOP VIEWS Page Trims Short (5/8") Here! SIDE VIEW FRONT VIEW Dimensions Unit Size A B Single/Double Supply C D E 03 & 04

More information

Maintenance. Daily. Shutdown Procedure. Periodically. During Freezing Temperatures

Maintenance. Daily. Shutdown Procedure. Periodically. During Freezing Temperatures Maintenance Daily Check the oil level and the condition of the oil. When the pump is operating, the oil in the pump housing gets warm and expands, filling into the oil reservoir. Depending on the type

More information