INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

Size: px
Start display at page:

Download "INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD"

Transcription

1 More Info at Open Access Database INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD ABSTRACT J.L. Fisher, G. Light, Jim Crane, Albert Parvin, Southwest Research Institute, USA Yoshimasa Sugawara, Tokyo Electric Power Company, Japan The core spray piping system in typical boiling water reactor (BWR) pressure vessels includes nozzles with thermal sleeves. Each sleeve consists of a carbon steel pipe welded to a stainless steel pipe [a dissimilar metal (DM) weld], which in turn is welded to a connecting head that feeds coolant to the remainder of the core spray system in the vessel. These welds are typically made in the fabrication shop, where they are machined flush to the pipe surfaces. The carbon steel pipe is welded at the field site to the carbon steel vessel nozzle. Usually, the outer surface of this carbon steel field weld is left in the as-welded condition. Stress corrosion cracking (SCC) has been found in other lightwater reactor locations with DM welds and also with stainless steel-to-stainless steel welds. Access to the outer surface of the thermal sleeve for inspection could be achieved from the vessel interior, by inserting a probe into the annulus between the thermal sleeve and the nozzle. However, due largely to the limited access conditions, these welds are not generally inspected. In a series of projects with Tokyo Electric Power Company (TEPCO), SwRI developed a laboratory prototype system for this inspection problem. The system includes a thin, flexible probe delivery mechanism to insert probes into the annulus, a thin (7 mm thick) ultrasonic probe, and a video inspection system that could also be inserted into the annulus. The system was successfully demonstrated on a mockup with implanted SCC flaws. INTRODUCTION The core spray piping system used in boiling water reactor (BWR) pressure vessels is a key component of the plant operating and safety equipment. This system includes a thermal sleeve, which consists of a carbon steel pipe welded to a stainless steel pipe, which is in turn welded to a connecting head that feeds coolant to the sparger feeder pipes of the core spray system. These welds are typically made in the fabrication shop, where they are machined smooth to the pipe surfaces. The carbon steel pipe is welded at the site to the vessel nozzle. Usually the outer surface of this carbon steel field weld is left in the as-welded condition. Stress corrosion cracking (SCC) has been found in other BWR and pressurized water reactor (PWR) locations with dissimilar metal (DM) welds and also with stainless steel-to-stainless steel welds. However, due to very limited access conditions for the thermal sleeve DM and stainless-to-stainless metal welds, there is no known inspection system for these welds. An investigation was conducted to develop a method that could be used to examine the DM and stainless-to-stainless steel welds for cracks extending 50 percent through wall and oriented either parallel or transverse to the weld. GEOMETRY DETERMINATION AND ACCESS STUDY A key step of the investigation was to define the range of geometries that effect the inspection and the accessibility. There are many different core spray thermal sleeve configurations, including different gaps between the nozzle bore and the thermal sleeve piping, different thermal sleeve pipe wall thicknesses, and different axial locations of the welds with respect to the inside surface of the BWR nozzle. Access to the metal welds in the core spray system was determined to be possible by reaching into the narrow annular gap formed by the bore of the core spray nozzle and the outside of the core spray thermal sleeve, or by scanning from the outside surface of the nozzle. Initial testing from the outside surface of the core spray sleeve was deemed not to be adequate. Therefore, the internal access as illustrated in Figure1 was investigated. 165

2 MOCKUP DESIGN An annulus gap mockup was fabricated to simulate the dissimilar metal butt weld, carbon steel butt weld, and nozzle annulus for the purpose of assessing the NDE delivery methods and evaluating the viability of visually inspecting the nozzle annulus gap prior to ultrasonic testing (UT) probe inspection. The annulus gap mockup (illustrated in Figure 2) was constructed from 316 stainless steel and A508 forged carbon steel to match actual plant construction. The mockup was designed and constructed to have interchangeable annulus sleeves to allow for simulation of multiple annulus gap sizes and offsets. A total of three annulus sleeves representing annulus gaps of 8 mm, 15 mm, and 42 mm were constructed. These three sleeve geometries represent 81% (37 of 46) of all thermal sleeve gaps of TEPCO plants. The remaining nozzles are categorized as follows: 13% (6 of 46) with gaps below 7 mm (extremely challenging) and 7% (3 of 46) with gaps greater than 42 mm (not as challenging but requiring a different scanner approach). A series of internal and external EDM notches and external circumferentially-oriented implanted cracks to simulate SCC were placed in the DM weld and heat-affected zone. Ultrasonic Sensor B Wall Thickness A Similar Metal Weld Dissimilar Metal Weld Weld Location Figure 1. Illustration of access to the dissimilar and similar metal welds in the core spray system by (a) reaching into the narrow annular gap formed by the bore of the core spray nozzle and the outside of the core spray thermal sleeve. The inspection plan is to first inspect the annulus with an articulating videoprobe to evaluate the condition of the annulus gap and also to detect signs of SCC that might be visible on the OD surface of the thermal sleeve. Visual inspection prior to UT probe insertion would also reduce the potential for damaging the probe delivery device. To test the videoprobe device, three visual indication marks, each approximately 1.5 mm x 5 mm, were placed on the outer diameter of the dissimilar metal weld. These marks represent through-wall cracks. Carbon Steel Base 8in NPS Pipe Sch. 60 Sections (Stainless Steel and Carbon Steel) OD = 8.625in (21.9cm) Wall Thickness = 10.3mm (.41in) Dissimilar Metal Buttweld Carbon Steel Metal Buttweld Water Water Interior Adjustable Gap 12in NPS Pipe Sch. 40 OD = 12.8in (32.4cm) ID = 12.0in (30.5cm) Adjustable Gap Sheet Metal Sleeve Figure 2. Thermal sleeve geometry mockup. The mockup can be oriented vertically and filled with water to simulate inspection conditions. 166

3 SYSTEM CONCEPT This inspection system requires access to the interior of the vessel and use of the refueling crane for delivery. The inspection system concept design places a low profile conventional bulk wave transducer inside the annular gap of the core spray nozzle, as illustrated in Figure 3. The transducer is designed to scan the surface close to the weld of interest, which increases its ability to detect and characterize a defect. In addition, the interior scanning unit would include visual capabilities to allow the operator to see the physical condition of the annular gap and DM weld prior to inspection with the ultrasonic sensor. Figure 3. Illustration of a low profile bulk wave transducer inside the annular gap of the nozzle The scanning concept consists of 5 major subsystems. The subsystems are described below. It should be noted that in these descriptions, the designations axial, radial, and circumferential are with respect to the core spray nozzle. (1) Probe subsystem. There are 2 different probe systems: (1) UT probe subsystem and (2) Video testing (VT) probe subsystem. The UT probe subsystem consists of a flexible support member to which the UT sensor is attached. The flexible support member is used to transport the UT sensor into the annular gap and provide good contact between the UT transducer and thermal sleeve. The VT probe system is designed to support and transport a video capture device into the annular gap. The UT probe subsystem is shown in Figure 4. It includes a 45-degree, in diameter transducer. The VT probe subsystem model is shown in Figure 5. It has a CCD imager camera with a resolution of 500 x 582 pixels. Lighting is provided by 2 LEDs mounted on either side of the camera. Figure 4. UT probe subsystem, with a breadboard track. The probe and track are only approximately 5 mm tall, to fit in a 7 mm gap 167

4 LEDs Camera VT Probe Head Figure 5. VT Probe subsystem, showing camera and LEDs for lighting. The manufactured subsystem could also fit into a 7 mm gap. (2) Sensor Delivery Transport (SDT) subsystem. The SDT subsystem is designed to deliver the probe subsystem into the annular gap. It includes axial and circumferential drive motions. The design concept uses 2 SDT subsystems, oriented 180 apart circumferentially. A semirigid single bend retractable prototype device was developed and integrated with the rest of the system. It consists of a thin concave sheet of material (main body) placed in a guide track to assist in directing and making the probe main body rigid. The guide track has a drive assembly attached, which extends and retracts the main body into and out of the annulus. The main body and guide track are shown in Figure 6. The drive assembly consists of a belt drive that is driven by micro servo motors. An optical encoder was used to obtain the position of the probe main body. A rigid interchangeable pre-shaped guide was used to direct the probe s main body into and out of the annular gap of the annular gap mockup. (3) Circumferential Scanning (CS) subsystem. The CS subsystem is designed to adjust the position of the SDT to match the diameter of the core spray nozzle thermal sleeve. The CS subsystem will be used to revolve the SDT subsystem 180 around the circumference of the nozzle during inspection, since each SDT subsystem can only inspect approximately 180 without this motion. In addition, as described later, it will provide radial motion of the SDT subsystem that will be used as part of the SDT insertion process. The CS subsystem is shown in Figure 6. Figure 6. Circumferential Scanning subsystem with Sensor Delivery Transport subsystem attached. (4) Positioning subsystem (PS). The positioning subsystem will align the CS subsystem with the core spray nozzle thermal sleeve, in order to deliver the sensor into the annular gap. The PS subsystem would attach to the sparger feeder pipe with a specialized clamping mechanism to provide registration of the entire system with respect to the vertical location of the nozzle once in place, suction cups also located on the PS will deploy against the wall to secure the device and minimize any possible load on the feeder pipes. Also, a centering, clamping mechanism will concentrically locate the system with the core spray nozzle, by clamping on the nozzle header. Once the PS subsystem is engaged, the CS subsystem will be engaged to deliver the SDT probe. A solid model of the PS is shown in Figure

5 Figure 7. PS subsystem shown with clamp mechanism to provide registration to the feeder pipe, suction cups to maintain position on the vessel wall. The CS and SDT subsystems are also shown. (5) Transport subsystem. The transport subsystem is designed to deliver the overall unit to the core spray thermal sleeve, and will utilize the refueling crane. This subsystem was not prototyped. For a better understanding of the interior scanner system, Figure 8 identifies the five major interior scanner subsystems. Transport Subsystem Positioning Subsystem Circumferential Scanning (CS) Subsystem Sensor Delivery Transport (SDT) Subsystem Probe Subsystem Figure 8. Interior scanning system concept showing the 5 major subsystems The completed portions of the system that were manufactured (probe subsystem, SDT, CS) are shown in Figure 9. Figure 9. Assembled system components, mounted on the thermal sleeve mockup 169

6 UT INSPECTION RESULTS Table 1 provides a summary of the flaws in the thermal sleeve mockup, as measured. All of these flaws were located in the outer surface of the mockup. Table 1. Summary of the flaws in the mockup Flaw Type Orientati on Flaw Location Lengt h (mm) Depth (mm) Width (mm) Distance From Weld C/L Degree Location mm Location S1 SCC* CIRC WELD C/L N/A N/A S2 SCC CIRC WELD C/L N/A N/A S3 SCC CIRC S/S N/A S4 SCC CIRC C/S N/A C1 EDM NOTCH CIRC C/S C2 EDM WELD CIRC NOTCH C/L N/A C3 EDM NOTCH CIRC S/S As expected, the SCC crack response was much lower (by approximately 6 db) than the EDM notch response, and detection through the stainless steel side of the weld was more difficult than detection through the carbon steel side. For the nozzles investigated, it should be possible to inspect from both sides of the weld. All EDM notches were easily detected. An example of a crack response is shown in Figure 10. Figure 10. Left - Crack S1 detected from carbon steel side of the weld. Right - Crack S1 detected from stainless steel side of the weld. VT INSPECTION RESULTS The VT probe subsystem was scanned over a portion of the exterior mockup, in the region of flaw C3. Figure 11 and Figure 12 show images of this region. In Figure 11, the flaw is visible; in Figure 12 the label C3 is clearly visible. 170

7 Flaw C3 Figure 11. VT probe in the region of Flaw C3, which is visible in the image Figure 12. VT probe moved slightly away from Flaw C3. The label C3 is clearly visible in the image CONCLUSIONS Based upon the testing conducted, the following conclusions were reached. (1) A new prototype interior scanner consisting of the UT probe subsystem, VT probe subsystem, Sensor Delivery Transport subsystem, and Circumferential Scanner subsystem, was designed and manufactured. The experimental results indicate that the concepts developed in these projects can be applied to inspection of the dissimilar and similar metal welds in typical BWR core spray thermal sleeves. (2) The UT and VT probe subsystems successfully handle annulus gaps of approximately 7 mm to 22 mm. (3) All implanted crack defects were detected. In order to ensure high reliability of crack detection, the dissimilar metal weld should be inspected from both the carbon steel side and the stainless steel side ACKNOWLEDGEMENTS This work was sponsored by the Tokyo Electric Power Company. 171

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE More Info at Open Access Database www.ndt.net/?id=18560 ABSTRACT NEW DEVELOPMENTS FOR AUTOMATED NOZZLE INNER RADIUS AND PIPING INSPECTIONS D. Eargle,WesDyne International, USA WesDyne has recently engaged

More information

Visual Inspection of Reactor Vessel Head Penetration Nozzles

Visual Inspection of Reactor Vessel Head Penetration Nozzles International Conference Nuclear Energy for New Europe 2003 Portorož, Slovenia, September 8-11, 2003 http://www.drustvo-js.si/port2003 Visual Inspection of Reactor Vessel Head Penetration Nozzles Simon

More information

DEVELOPMENT OF NEW MANIPULATORS FOR PWR AND VVER VESSEL INSPECTION. Authors: Mats Wendel and Torbjörn Sjö, DEKRA Industrial, Sweden

DEVELOPMENT OF NEW MANIPULATORS FOR PWR AND VVER VESSEL INSPECTION. Authors: Mats Wendel and Torbjörn Sjö, DEKRA Industrial, Sweden DEVELOPMENT OF NEW MANIPULATORS FOR PWR AND VVER VESSEL INSPECTION Authors: Mats Wendel and Torbjörn Sjö, DEKRA Industrial, Sweden ABSTRACT TIME, has been the key word for the inspection of Ringhals PWR

More information

Robotic Inspection of Unpiggable Piping at Pump Station

Robotic Inspection of Unpiggable Piping at Pump Station Robotic Inspection of Unpiggable Piping at Pump Station by Steve Lacatena 1 and Jonathan Minder 2 1 Alyeska Pipeline Service Co, Anchorage, AK, USA 2 Diakont, San Diego, CA USA Unpiggable Pipeline Solutions

More information

ULTRASONIC TESTING OF RAILWAY AXLES WITH PHASED ARRAY TECHNIQUE EXPERIENCES DURING OPERATION

ULTRASONIC TESTING OF RAILWAY AXLES WITH PHASED ARRAY TECHNIQUE EXPERIENCES DURING OPERATION ULTRASONIC TESTING OF RAILWAY AXLES WITH PHASED ARRAY TECHNIQUE EXPERIENCES DURING OPERATION W. Hansen 1, H. Hintze 2 1 GE Inspection Technologies, Hürth, Germany; 2 Deutsche Bahn AG, Kirchmöser; Germany

More information

ADVANCED INSPECTION TECHNIQUE FROM INSIDE SURFACE FOR DISSIMILAR METAL WELD OF STEAM GENERATOR NOZZLE

ADVANCED INSPECTION TECHNIQUE FROM INSIDE SURFACE FOR DISSIMILAR METAL WELD OF STEAM GENERATOR NOZZLE More Info at Open Access Database www.ndt.net/?id=18532 ADVANCED INSPECTION TECHNIQUE FROM INSIDE SURFACE FOR DISSIMILAR METAL WELD OF STEAM GENERATOR NOZZLE T. Yamaguchi, T. Shichida, T. Matsuura, Y.

More information

Robotics and Manipulators for Reactor Pressure Vessel Head Inspection

Robotics and Manipulators for Reactor Pressure Vessel Head Inspection International Journal of Nuclear Ene rgy Science and Engineering Vol. 2 Iss. 4, De cember 2012 Robotics and Manipulators for Reactor Pressure Vessel Head Inspection S.W. Glass 1, M.Sloman 2, F.Klahn 3

More information

ESTABLISHMENT OF ULTRASONIC TESTING IN UNIQUE DESIGNED PARTIAL PENETRATION END PLUG OF HEADER IN BOILERS.

ESTABLISHMENT OF ULTRASONIC TESTING IN UNIQUE DESIGNED PARTIAL PENETRATION END PLUG OF HEADER IN BOILERS. Proceedings of the National Seminar & Exhibition on Non-Destructive Evaluation NDE 2011, December 8-10, 2011 ESTABLISHMENT OF ULTRASONIC TESTING IN UNIQUE DESIGNED PARTIAL PENETRATION END PLUG OF HEADER

More information

ULTRASONIC EXAMINATION

ULTRASONIC EXAMINATION Page 1 of 9 ULTRASONIC EXAMINATION PROCEDURE Doc. No. KNS/UT/01.REV 0 Page: 9 of 9 Date: 15.09.2012 ULTRASONIC EXAMINATION PROCEDURE PREPARED & APPROVED BY NDE- Level III CERTIFIED BY REVIEWED BY Page

More information

Ultrasonic and Magnetic Particle Testing of New Railway Wheels

Ultrasonic and Magnetic Particle Testing of New Railway Wheels 19 th World Conference on Non-Destructive Testing 2016 Ultrasonic and Magnetic Particle Testing of New Railway Wheels Wolfram A. Karl DEUTSCH 1, Wolfgang WEBER 1, Klaus MAXAM 1, Mathias RAZENG 1, Frank

More information

Integrity Evaluation of Steam Line Using Complimentary NDE Methods (Acoustic Emission and Ultrasonic Testing)

Integrity Evaluation of Steam Line Using Complimentary NDE Methods (Acoustic Emission and Ultrasonic Testing) 131 Integrity Evaluation of Steam Line Using Complimentary NDE Methods (Acoustic Emission and Ultrasonic Testing) K. Rajeev and K.S. Prasanth Proceedings of the National Seminar & Exhibition on Non-Destructive

More information

DEKRA Industrial. Torbjörn Sjö, Mats Wendel and Jorge Benitez, Business Area Nuclear

DEKRA Industrial. Torbjörn Sjö, Mats Wendel and Jorge Benitez, Business Area Nuclear DEKRA Industrial Torbjörn Sjö, Mats Wendel and Jorge Benitez, Business Area Nuclear 2011-10-26 DEKRA in General One of the leading service provision companies in Europe Based in Stuttgart Operates in more

More information

Key-Words : Eddy Current Testing, Garter Spring, Coolant Channels, Eddy Current Test Coil Design etc.

Key-Words : Eddy Current Testing, Garter Spring, Coolant Channels, Eddy Current Test Coil Design etc. More Info at Open Access Database www.ndt.net/?id=15054 Development of Eddy Current Test Technique for Detection of Garter Springs in 540 and 700 MWe Pressurized Heavy Water Reactors Arbind Kumar AFD,

More information

Inline Inspection Technology Overview

Inline Inspection Technology Overview Inline Inspection Technology Overview Jason M Matocha Technical Representative Jason.Matocha@tdwilliamson.com 11/12/2015 www.tdwilliamson.com Registered trademarks of T.D. Williamson, Inc. in the United

More information

SUBMARINE NOZZLE PIPE MANIPULATOR. R. Zeilinger, G. Hünies, F. Mohr AREVA NDE-Solutions/ intelligendt Systems & Services GmbH

SUBMARINE NOZZLE PIPE MANIPULATOR. R. Zeilinger, G. Hünies, F. Mohr AREVA NDE-Solutions/ intelligendt Systems & Services GmbH SUBMARINE NOZZLE PIPE MANIPULATOR R. Zeilinger, G. Hünies, F. Mohr AREVA NDE-Solutions/ intelligendt Systems & Services GmbH ABSTRACT: AREVA NDE-Solutions German division - intelligendt Systems & Services

More information

NRC Non-Destructive Examination Research

NRC Non-Destructive Examination Research NRC Non-Destructive Examination Research Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Jeff Hixon October 22, 2009 Why NDE? U.S. Nuclear Regulatory Commission 2 Why NDE? U.S.

More information

New Robotic Technologies for Inspecting Two Pole Electric Generators while the Rotor Remains in Place

New Robotic Technologies for Inspecting Two Pole Electric Generators while the Rotor Remains in Place Journal of Power and Energy Engineering, 2015, 3, 123-127 Published Online April 2015 in SciRes. http://www.scirp.org/journal/jpee http://dx.doi.org/10.4236/jpee.2015.34018 New Robotic Technologies for

More information

Deployment of Weld Inspection Manipulator for RPV upper shell welds of TAPS-1&2

Deployment of Weld Inspection Manipulator for RPV upper shell welds of TAPS-1&2 More info about this article: http://www.ndt.net/?id=21080 Deployment of Weld Inspection Manipulator for RPV upper shell welds of TAPS-1&2 JP Singh, R Ranjon, H Chatterjee, MP Kulkarni, RJ Patel Refuelling

More information

ARTICLE 5 ULTRASONIC EXAMINATION METHODS FOR MATERIALS

ARTICLE 5 ULTRASONIC EXAMINATION METHODS FOR MATERIALS ARTICLE 5 ULTRASONIC EAMINATION METHODS FOR MATERIALS 04 T-510 SCOPE This Article provides or references requirements, which are to be used in selecting and developing ultrasonic examination procedures

More information

QUARTER SCALE ROBOTICS POSITOING SYSTEM

QUARTER SCALE ROBOTICS POSITOING SYSTEM ME 4773/5493 Fundamental of Robotics Fall 2016 San Antonio, TX, USA QUARTER SCALE ROBOTICS POSITOING SYSTEM Andres Favela Student San Antonio, TX, USA 78249 Afave91@gmail.com ABSTRACT As of 2015 nearly

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER E: THE REACTOR COOLANT SYSTEM AND RELATED SYSTEMS PAGE : 1 / 13 4. PRESSURISER 4.1. DESCRIPTION The pressuriser (PZR) is a pressurised vessel forming part of the reactor coolant pressure boundary (CPP) [RCPB]. It comprises a vertical cylindrical shell,

More information

How You Benefit From The KC Sealing System A New Definition Of Leaky Flanged Joints Comparison Of Flanged Joint After Bolt-Up...

How You Benefit From The KC Sealing System A New Definition Of Leaky Flanged Joints Comparison Of Flanged Joint After Bolt-Up... Benefits How You Benefit From The KC Sealing System...-1 A New Definition Of Leaky Flanged Joints...-2 Comparison Of Flanged Joint After Bolt-Up...-3 Joining Dissimilar Flange Adapter Types...- Gasket

More information

Ultrasonic Production Monitoring of Small Diameter ERW Pipes

Ultrasonic Production Monitoring of Small Diameter ERW Pipes 11th European Conference on Non-Destructive Testing (ECNDT 2014), October 6-10, 2014, Prague, Czech Republic Ultrasonic Production Monitoring of Small Diameter ERW Pipes Mirek Macecek, Pavel Vraj Techno

More information

Improving the Quality of NDT in the Rail Sector through the Introduction of Advanced Technologies and NDT Means

Improving the Quality of NDT in the Rail Sector through the Introduction of Advanced Technologies and NDT Means More Info at Open Access Database www.ndt.net/?id=15123 Improving the Quality of NDT in the Rail Sector through the Introduction of Advanced Technologies and NDT Means O. Iurchenko 8 Naberezhno-Lugova

More information

Pressure Vessel Assessment Report

Pressure Vessel Assessment Report Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899

More information

A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk

A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk by: Kelly Eberle, P.Eng. Beta Machinery Analysis Calgary, AB Canada keberle@betamachinery.com keywords: reciprocating

More information

Figures T Basic Calibration Block T Straight Beam Calibration Blocks for Bolting

Figures T Basic Calibration Block T Straight Beam Calibration Blocks for Bolting A02 ARTICLE 5 T-510 Scope... 102 T-520 General... 102 T-521 Basic Requirements... 102 T-522 Written Procedure Requirements... 102 T-530 Equipment... 102 T-531 Instrument... 102 T-532 Search Units... 102

More information

Single-phase Coolant Flow and Heat Transfer

Single-phase Coolant Flow and Heat Transfer 22.06 ENGINEERING OF NUCLEAR SYSTEMS - Fall 2010 Problem Set 5 Single-phase Coolant Flow and Heat Transfer 1) Hydraulic Analysis of the Emergency Core Spray System in a BWR The emergency spray system of

More information

PHYSICAL MODEL TESTS OF ICE PASSAGE AT LOCKS

PHYSICAL MODEL TESTS OF ICE PASSAGE AT LOCKS Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 22 International Association of Hydraulic Engineering and Research PHYSICAL MODEL

More information

Blade Testing. In production

Blade Testing. In production Blade Testing In production Blade Testing Your partner in blade testing in production Wind turbine blades are highly sophisticated products, composed of a variety of materials and composites. During operational

More information

Health Monitoring of Rotating Equipment from Torsional Vibration Features

Health Monitoring of Rotating Equipment from Torsional Vibration Features College of Engineering Health Monitoring of Rotating Equipment from Torsional Vibration Features Martin W. Trethewey Department of Mechanical and Nuclear Engineering Penn State University April 13, 2007

More information

p h a s e d - a r r a y t e c h n o l o g i e s w w w. m 2 m - n d t. c o m

p h a s e d - a r r a y t e c h n o l o g i e s w w w. m 2 m - n d t. c o m A new advanced portable phased - array system : the Mantis Phased-array technology Phased-array technology has been widely accepted in the industry as a powerful tool for the detection of corrosion and

More information

DEFECT DISTRIBUTION IN WELDS OF INCOLOY 908

DEFECT DISTRIBUTION IN WELDS OF INCOLOY 908 PSFC/RR-10-8 DEFECT DISTRIBUTION IN WELDS OF INCOLOY 908 Jun Feng August 10, 2010 Plasma Science and Fusion Center Massachusetts Institute of Technology Cambridge, MA 02139, USA This work was supported

More information

Optical Techniques in Gasoline Engine Performance and Emissions Development Injector Spray Visualisation

Optical Techniques in Gasoline Engine Performance and Emissions Development Injector Spray Visualisation Injector Spray Visualisation Denis Gill, Wolfgang Krankenedl, DEC Ernst Winklhofer 20.03.15 Emissions Development Injector Spray Visualisation Contents Introduction Spray Box Direct Injection (GDI) Spray

More information

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES J. McGregor, B. Nooteboom, N. Ivory PTAS-ITS Lot 1 and 2 Tapak Perindustrian Pekan Belait, Jalan Setia Di-Raja, Kuala

More information

REPAIR OF DENTS SUBJECTED TO CYCLIC PRESSURE SERVICE USING COMPOSITE MATERIALS

REPAIR OF DENTS SUBJECTED TO CYCLIC PRESSURE SERVICE USING COMPOSITE MATERIALS Proceedings of IPC2010 8th International Pipeline Conference September 27 October 1, 2010, Calgary, Alberta, Canada REPAIR OF DENTS SUBJECTED TO CYCLIC PRESSURE SERVICE USING COMPOSITE MATERIALS IPC2010-31524

More information

DACON INSEPECTION SERVICES CORROSION UNDER SUPPORT

DACON INSEPECTION SERVICES CORROSION UNDER SUPPORT DACON INSEPECTION SERVICES CORROSION UNDER SUPPORT Who we are Conventional and Advanced NDT and Inspection Services Oil and Gas, Refinery, Petrochemical, Heavy Industry, Mining Over 400 personnel including

More information

TSC INSPECTION SYSTEMS

TSC INSPECTION SYSTEMS TSC INSPECTION SYSTEMS APPLICATIONS OF ACFM IN THE RAIL INDUSTRY ACFM was originally developed for use in the oil and gas industry as a technique for detecting and sizing surface-breaking defects with

More information

Principles of NDT Methods on Railway Axles

Principles of NDT Methods on Railway Axles Sheet 1 of 38 Dipl.-Ing. Thomas Heckel, BAM VIII.43 Dipl.Ing. Uwe Völz, BAM VIII.43 Dipl.-phys. Rainer Boehm, BAM VIII.42 11.10.2010 Sheet 2 of 38 1. Introduction 2. NDT by manufacturer 3. In-service inspection

More information

PET Phantom - NEMA IEC/2001

PET Phantom - NEMA IEC/2001 PET Phantom - NEMA IEC/2001 2000 NEMA Standards, ideal for whole-body PET. Simulation of whole-body imaging using PET and camera-based coincidence imaging techniques Evaluation of reconstructed image quality

More information

CHAPTER 2 FRUITS CONVEYOR SYSTEM

CHAPTER 2 FRUITS CONVEYOR SYSTEM 14 CHAPTER 2 FRUITS CONVEYOR SYSTEM 2.1 INTRODUCTION In an on-line sorter, the conveyor system physically moves large quantities of fruits along the process line for sorting, grading and packing either

More information

Post Irradiation Examinations of High Performance Research Reactor Fuels

Post Irradiation Examinations of High Performance Research Reactor Fuels Post Irradiation Examinations of High Performance Research Reactor Fuels www.inl.gov National Academy of Science Technical Review Francine Rice, Walter Williams, Daniel Wachs, Mitchell Meyer, Adam Robinson

More information

General Design Requirements for the Use of Hydraulic Couplings

General Design Requirements for the Use of Hydraulic Couplings General Design Requirements for the Use of Hydraulic Couplings EP-118 B BC 6/4/13 BC 6/4/13 CR 6/4/13 Copy Controlled by Quality Assurance INTRODUCTION The following general design requirements should

More information

Overview of Improvements in Work Practices and Instrumentation for CANDU Primary Heat Transport Feeders In-Service Inspections

Overview of Improvements in Work Practices and Instrumentation for CANDU Primary Heat Transport Feeders In-Service Inspections 4th International CANDU In-service Inspection Workshop and NDT in Canada 2012 Conference, 2012 June 18-21, Toronto, Ontario Overview of Improvements in Work Practices and Instrumentation for CANDU Primary

More information

FBR and ATR fuel developments in JNC

FBR and ATR fuel developments in JNC International Seminar on MOX Utilization February 19, 2002 FBR and ATR fuel developments in JNC Design and performance of MOX fuel in safety view points Plutonium Fuel Center, Tokai Works, Japan Nuclear

More information

SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame

SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame SSC Case Study V Container Ship Recurring Failure of Side Longitudinal Passing through a Web Frame Contents: Vessel Particulars Summary of Structural Failure Background Detailed Description of Structural

More information

Kobe University Repository : Kernel

Kobe University Repository : Kernel Kobe University Repository : Kernel タイトル Title 著者 Author(s) 掲載誌 巻号 ページ Citation 刊行日 Issue date 資源タイプ Resource Type 版区分 Resource Version 権利 Rights DOI JaLCDOI URL Visualization of cavitation phenomena in

More information

Component Asset Management with Ultra-High Pressure Cavitation Peening

Component Asset Management with Ultra-High Pressure Cavitation Peening Component Asset Management with Ultra-High Pressure Cavitation Peening Darren H. WOOD, P.E. Global Product Development Manager Lyon, France 23 October 2017 Darren H. WOOD p.1 Agenda Why UHP Cavitation

More information

POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR

POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR A.G. Eshcherkin*, V.A. Ovchinnikov, E.E. Shakhmut, E.E. Kuznetsova, A.L. Izhutov, V.V. Kalygin INTRODUCTION A series of experiments

More information

HERCULES-2 Project. Deliverable: D8.8

HERCULES-2 Project. Deliverable: D8.8 HERCULES-2 Project Fuel Flexible, Near Zero Emissions, Adaptive Performance Marine Engine Deliverable: D8.8 Study an alternative urea decomposition and mixer / SCR configuration and / or study in extended

More information

Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23

Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23 Oconee Nuclear Station ALLOY 600 REPAIRS 1EOC23 We re requiring more inspections due to susceptibility of material to cracking Some utilities have implemented mitigative actions Stress improvement Weld

More information

APPLICATION OF AE TECHNIQUE AND THERMOGRAPHY FOR ASSESSMENT OF SLUDGE VOLUME INSIDE CRUDE OIL STORAGE TANKS

APPLICATION OF AE TECHNIQUE AND THERMOGRAPHY FOR ASSESSMENT OF SLUDGE VOLUME INSIDE CRUDE OIL STORAGE TANKS More info about this article: http://www.ndt.net/?id=23614 APPLICATION OF AE TECHNIQUE AND THERMOGRAPHY FOR ASSESSMENT OF SLUDGE VOLUME INSIDE CRUDE OIL STORAGE TANKS Ireneusz Baran 1, Tomasz Dunaj 1,

More information

**EthosEnergy, Power Plant Services Americas

**EthosEnergy, Power Plant Services Americas SOLUTION FOR GAS TURBINE ROTOR END OF LIFE By R.Annigeri*, B.Freeman** EthosEnergy, Power Plant Services* 12000 Deerfield Parkway, Suite 315, Alpharetta GA 30004 ( ravindra.annigeri@ethosenergygroup.com)

More information

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure 1 Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure Ali Malik Components & Equipment Eng. Ontario Power Generation - Darlington Nuclear 2 Ontario Power Generation Darlington Darlington Nuclear

More information

Development of High Performance 3D Scroll Compressor

Development of High Performance 3D Scroll Compressor Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2006 Development of High Performance 3D Scroll Compressor Taichi Tateishi Mitsubishi Heavy

More information

Design and Test of Transonic Compressor Rotor with Tandem Cascade

Design and Test of Transonic Compressor Rotor with Tandem Cascade Proceedings of the International Gas Turbine Congress 2003 Tokyo November 2-7, 2003 IGTC2003Tokyo TS-108 Design and Test of Transonic Compressor Rotor with Tandem Cascade Yusuke SAKAI, Akinori MATSUOKA,

More information

Current Status of the Melcor Nodalization for Atucha I Nuclear Power Plant. Zárate. S.M. and Valle Cepero, R.

Current Status of the Melcor Nodalization for Atucha I Nuclear Power Plant. Zárate. S.M. and Valle Cepero, R. Current Status of the Melcor Nodalization for Atucha I Nuclear Power Plant Zárate. S.M. and Valle Cepero, R. presentado en USNRC Cooperative Severe Accident Research Program (CSARP), Maryland, EE. UU.,

More information

DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014

DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014 DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014 Robert E. Nickell, Consultant, San Diego, CA, USA Takao Shirakura, Transnuclear, Ltd., Tokyo,

More information

Prevention vs. Reaction The Importance of Asset Integrity

Prevention vs. Reaction The Importance of Asset Integrity Prevention vs. Reaction The Importance of Asset Integrity How Your Assets Typically Age Inspections Potential Failure Condition Functional Failure Time P-F Interval Why is Asset Integrity so Important?

More information

Plastic Ball Bearing Design Improvement Using Finite Element Method

Plastic Ball Bearing Design Improvement Using Finite Element Method 2017 Published in 5th International Symposium on Innovative Technologies in Engineering and Science 29-30 September 2017 (ISITES2017 Baku - Azerbaijan) Plastic Ball Bearing Design Improvement Using Finite

More information

Double-jacketed gaskets for heat exchangers sealabilty behavior in flanges with and without nubbin

Double-jacketed gaskets for heat exchangers sealabilty behavior in flanges with and without nubbin Proceedings of PVP2005 2005 ASME Pressure Vessels and Piping Division Conference July 17-21, 2005, Denver, Colorado USA PVP2005-71023 Double-jacketed gaskets for heat exchangers sealabilty behavior in

More information

WELD CRAWLER TM HIGHLY FLEXIBLE & ADAPTABLE SCANNER FOR WELD INSPECTIONS TRANSFORMING WELD INSPECTIONS.

WELD CRAWLER TM HIGHLY FLEXIBLE & ADAPTABLE SCANNER FOR WELD INSPECTIONS TRANSFORMING WELD INSPECTIONS. WELD CRAWLER TM HIGHLY FLEXIBLE & ADAPTABLE SCANNER FOR WELD INSPECTIONS TRANSFORMING WELD INSPECTIONS www.zetec.com VERSATILE: EASY TRANSFORMATION TO ADAPT TO CIRCUMFERENTIAL AND AXIAL WELDS FLEXIBLE

More information

INSTALLATION INSTRUCTIONS FIBER OPTICS for INSIGHT II FLAME SCANNERS

INSTALLATION INSTRUCTIONS FIBER OPTICS for INSIGHT II FLAME SCANNERS APPLICATION CU-117 APRIL 8, 2013 INSTALLATION INSTRUCTIONS FIBER OPTICS for INSIGHT II FLAME SCANNERS The FIREYE fiber optic assemblies have been designed for installation on burners where movable vanes,

More information

Advanced Outage Compression Methods for Steam Turbines. Nicholas Marsh 13 th February 2012

Advanced Outage Compression Methods for Steam Turbines. Nicholas Marsh 13 th February 2012 Advanced Outage Compression Methods for Steam Turbines Nicholas Marsh 13 th February 2012 Agenda Introduction Page 3 Water Jet Cleaning Page 5 Water Jet Cutting Page 10 Automated Phased Array Ultrasonic

More information

SECTION XI. Subject Interpretation File No. Cases N and N-729-2, -3141(c)...XI

SECTION XI. Subject Interpretation File No. Cases N and N-729-2, -3141(c)...XI SECTION XI Subject Interpretation File No. Cases N-729-1 and N-729-2, -3141(c)....XI-1-10-45 11-1956 Figure IWB-2500-7(a) and Code Case N-613-1, Fig. 1 (2001 Edition With the 2003 Addenda Through the 2010

More information

IMPROVED BWR CORE DESIGN USING HYDRIDE FUEL

IMPROVED BWR CORE DESIGN USING HYDRIDE FUEL Joint Reactor Seminar University of Tokyo (GoNERI) and UC Berkeley March 5, 2009 IMPROVED BWR CORE DESIGN USING HYDRIDE FUEL Massimiliano Fratoni, Alessandro Piazza, Ehud Greenspan University of California,

More information

Innovative Landing String system for ultra-deep offshore

Innovative Landing String system for ultra-deep offshore Innovative Landing String system for ultra-deep offshore V. Flores, J.Franchi, S. Granger Vallourec Drilling Products A. Vierke, J. Grotherr Blohm+Voss Oil Tools Introduction Offshore industry trends:

More information

High-Speed Ultrasonic Testing of ERW Pipes

High-Speed Ultrasonic Testing of ERW Pipes 19 th World Conference on Non-Destructive Testing 2016 High-Speed Ultrasonic Testing of ERW Pipes W.A.K. DEUTSCH 1, M. JOSWIG 1, R. KATTWINKEL 1, H. HARMUTH 1 1 KARL DEUTSCH Prüf- und Messgerätebau GmbH

More information

Algeria, November 2016

Algeria, November 2016 Advanced Non-Destructive Testing for Tanks and Pipelines Algeria, November 2016 Params. K Details of Selected Advanced NDT Techniques On-Line Inspection What is On-Line Inspection? Check the Mechanical

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella

More information

TOFD on Weld Seams. New Prestandard CEN/TS : professional customer focused cost aware. ECNDT 2006 Berlin, September 2006 We.2.7.

TOFD on Weld Seams. New Prestandard CEN/TS : professional customer focused cost aware. ECNDT 2006 Berlin, September 2006 We.2.7. professional customer focused cost aware New Prestandard CEN/TS 14751 : TOFD on Weld Seams ECNDT 2006 Berlin, 25.-29. September 2006 We.2.7.2 Dr.-Ing. Andreas Hecht Plant Inspection / Materials Engineering

More information

NUCLEAR POWER INDUSTRY

NUCLEAR POWER INDUSTRY FLOW BALANCING The objective of the simulation is to model the flow rates through the respective distribution holes of the inlet manifold. This was required to initially determine the appropriate size

More information

Application of Phased Array Ultrasonic Testing Technology on Inservice Wheel

Application of Phased Array Ultrasonic Testing Technology on Inservice Wheel 18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa Application of Phased Array Ultrasonic Testing Technology on Inservice Wheel Yu ZHANG 1, Li WANG 1, Jianping PENG

More information

Defect Monitoring In Railway Wheel and Axle

Defect Monitoring In Railway Wheel and Axle IJR International Journal of Railway, pp. 1-5 The Korean Society for Railway Defect Monitoring In Railway Wheel and Axle Seok-Jin Kwon, Dong-Hyoung Lee *, and Won-Hee You * Abstract The railway system

More information

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Explosion Relief Valves

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Explosion Relief Valves CLASSIFICATION NOTES Type Testing Procedure for Crankcase Explosion Relief Valves Contents 1. Scope, Application 2. Recognized Standards 3. Purpose 4. Test Facilities 5. Explosion Test Process 6. Testing

More information

Module 13: Mechanical Fuel Injection Diagnosis and Repair

Module 13: Mechanical Fuel Injection Diagnosis and Repair Terms and Definitions Parts of Injection Nozzles Types of Nozzle Valves Operation of an Injection Nozzle Fuel Flow Through the Unit Injector Optional Features on Fuel Injection Pumps Main Parts of a Distributor-Type

More information

APPLICATION OF STAR-CCM+ TO TURBOCHARGER MODELING AT BORGWARNER TURBO SYSTEMS

APPLICATION OF STAR-CCM+ TO TURBOCHARGER MODELING AT BORGWARNER TURBO SYSTEMS APPLICATION OF STAR-CCM+ TO TURBOCHARGER MODELING AT BORGWARNER TURBO SYSTEMS BorgWarner: David Grabowska 9th November 2010 CD-adapco: Dean Palfreyman Bob Reynolds Introduction This presentation will focus

More information

ADVANCE INSPECTION TECHNOLOGIES APPLIED TO THE GAS INDUSTRY Mar del Plata Octubre 2012

ADVANCE INSPECTION TECHNOLOGIES APPLIED TO THE GAS INDUSTRY Mar del Plata Octubre 2012 ADVANCE INSPECTION TECHNOLOGIES APPLIED TO THE GAS INDUSTRY Mar del Plata Octubre 2012 LEADING IN INSPECTION TECHNOLOGIES Ruben Bermudez Rosen Europe BV Introduction In-Line Inspection of gas pipelines

More information

INSTALLATION INSTRUCTIONS FOR THE 45RM1, 45RM2, 45RM4, 45FS1, 45UVFS1 FIBER OPTIC FLAME SCANNERS

INSTALLATION INSTRUCTIONS FOR THE 45RM1, 45RM2, 45RM4, 45FS1, 45UVFS1 FIBER OPTIC FLAME SCANNERS CU-21 MAY 5, 2008 INSTALLATION INSTRUCTIONS FOR THE 45RM1, 45RM2, 45RM4, 45FS1, 45UVFS1 FIBER OPTIC FLAME SCANNERS APPLICATION The FIREYE fiber optic scanners have been designed for installation on burners

More information

Assemblies for Parallel Kinematics. Frank Dürschmied. INA reprint from Werkstatt und Betrieb Vol. No. 5, May 1999 Carl Hanser Verlag, München

Assemblies for Parallel Kinematics. Frank Dürschmied. INA reprint from Werkstatt und Betrieb Vol. No. 5, May 1999 Carl Hanser Verlag, München Assemblies for Parallel Kinematics Frank Dürschmied INA reprint from Werkstatt und Betrieb Vol. No. 5, May 1999 Carl Hanser Verlag, München Assemblies for Parallel Kinematics Frank Dürschmied Joints and

More information

Digital Copper Corrosion Measurement Vs. Visual Rating _ Incorporating New Technologies To Method Development

Digital Copper Corrosion Measurement Vs. Visual Rating _ Incorporating New Technologies To Method Development Digital Copper Corrosion Measurement Vs. Visual _ Incorporating New Technologies To Method Development Aaron Mendez Ph.D. and Juan Ayala Ayalytical Instruments Inc. 2787 W Fulton St, Chicago, IL 60612

More information

Experimental Investigation of Hot Surface Ignition of Hydrocarbon-Air Mixtures

Experimental Investigation of Hot Surface Ignition of Hydrocarbon-Air Mixtures Paper # 2D-09 7th US National Technical Meeting of the Combustion Institute Georgia Institute of Technology, Atlanta, GA Mar 20-23, 2011. Topic: Laminar Flames Experimental Investigation of Hot Surface

More information

Performance Testing of Composite Bearing Materials for Large Hydraulic Cylinders

Performance Testing of Composite Bearing Materials for Large Hydraulic Cylinders TECHNICAL Performance Testing of Composite Bearing Materials for Large Hydraulic Cylinders Leo Dupuis, Bosch-Rexroth Sr. Development Engineer Introduction Large hydraulic cylinders (LHCs) are integral

More information

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES Proceedings of the 2014 10th International Pipeline Conference IPC2014 September 29 - October 3, 2014, Calgary, Alberta, Canada IPC2014-33410 PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE

More information

Application of ABAQUS to Analyzing Shrink Fitting Process of Semi Built-up Type Marine Engine Crankshaft

Application of ABAQUS to Analyzing Shrink Fitting Process of Semi Built-up Type Marine Engine Crankshaft Application of ABAQUS to Analyzing Shrink Fitting Process of Semi Built-up Type Marine Engine Crankshaft Jae-Cheol Kim, Dong-Kwon Kim, Young-Duk Kim, and Dong-Young Kim System Technology Research Team,

More information

Simulating Rotary Draw Bending and Tube Hydroforming

Simulating Rotary Draw Bending and Tube Hydroforming Abstract: Simulating Rotary Draw Bending and Tube Hydroforming Dilip K Mahanty, Narendran M. Balan Engineering Services Group, Tata Consultancy Services Tube hydroforming is currently an active area of

More information

PROHEAT 35 Induction Heating Application Photos for PREHEAT and PWHT

PROHEAT 35 Induction Heating Application Photos for PREHEAT and PWHT PROHEAT 35 Induction Heating Application Photos for PREHEAT and PWHT 2 PREHEAT APPLICATIONS and VARIOUS COIL CONFIGURATIONS FOR PREHEAT 3 Transmission Pipeline Construction - Preheat Transmission pipeline

More information

Urea Reactor Height Extension to Increase Capacity

Urea Reactor Height Extension to Increase Capacity Technical Paper June 2014 Urea Reactor Height Extension to Increase Capacity Hermann Kernberger Schoeller-Bleckmann Nitec GmbH (SBN), Austria Bob Edmondson Yara Belle Plaine, Canada Summary A discussion

More information

Hong-Zeng (Bert) Yu FM Global International Water Mist Conference Barcelona, Spain November 14-15, 2012

Hong-Zeng (Bert) Yu FM Global International Water Mist Conference Barcelona, Spain November 14-15, 2012 Using Well-Stirred-Reactor Modeling and Physical Scaling to Develop a Water Mist Protection to Extinguish Ignitable Liquid Fires in a Naturally-Ventilated Building Hong-Zeng (Bert) Yu FM Global 2012 International

More information

INSTALLATION INSTRUCTIONS FOR THE PHOENIX FIBER OPTIC FLAME SCANNERS

INSTALLATION INSTRUCTIONS FOR THE PHOENIX FIBER OPTIC FLAME SCANNERS CU-106 SEPTEMBER 14, 2005 INSTALLATION INSTRUCTIONS FOR THE PHOENIX FIBER OPTIC FLAME SCANNERS APPLICATION The FIREYE fiber optic scanners have been designed for installation on burners where movable vanes,

More information

EMC-HD. C 01_2 Subheadline_15pt/7.2mm

EMC-HD. C 01_2 Subheadline_15pt/7.2mm C Electromechanical 01_1 Headline_36pt/14.4mm Cylinder EMC-HD C 01_2 Subheadline_15pt/7.2mm 2 Elektromechanischer Zylinder EMC-HD Short product name Example: EMC 085 HD 1 System = ElectroMechanical Cylinder

More information

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory R.D. Scarpetti, S. Nath, J. Barraza, C. A. Ekdahl, E. Jacquez, K. Nielsen, J. Seitz Los Alamos National Laboratory, Los Alamos,

More information

Condition Monitoring of a Check Valve for Nuclear Power Plants by Means of Acoustic Emission Technique

Condition Monitoring of a Check Valve for Nuclear Power Plants by Means of Acoustic Emission Technique Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # O03-3 Condition Monitoring of a Check Valve

More information

Usage Issues and Fischer-Tropsch Commercialization

Usage Issues and Fischer-Tropsch Commercialization Usage Issues and Fischer-Tropsch Commercialization Presentation at the CCTR Advisory Panel Meeting Terre Haute, Indiana June 1, 2006 Diesel Engine Research John Abraham (ME), Jim Caruthers (CHE) Gas Turbine

More information

PIPINGSOLUTIONS, INC.

PIPINGSOLUTIONS, INC. Piping Stress Analysis Where do I start? The following information will take you step-by-step through the logic of the data collection effort that should occur prior to beginning to model a piping system

More information

Fisher TBX Steam Conditioning Valve

Fisher TBX Steam Conditioning Valve TBX Valve Product Bulletin Fisher TBX Steam Conditioning Valve The Fisher TBX Steam Conditioning Valve is designed to handle the most severe applications in today's cycling power plants as well as provide

More information

STUDY OF HYDROGEN DIFFUSION AND DEFLAGRATION IN A CLOSED SYSTEM

STUDY OF HYDROGEN DIFFUSION AND DEFLAGRATION IN A CLOSED SYSTEM STUDY OF HYDROGEN DIFFUSION AND DEFLAGRATION IN A CLOSED SYSTEM Yuki Ishimoto 1, Erik Merilo 2, Mark Groethe 2, Seiki Chiba 3, Hiroyuki Iwabuchi 1, Kou Sakata 1 1 The Institute of Applied Energy, 14-2,Nishishinbashi

More information

Prototyping of Radial and Thrust Air Bearing for Micro Gas Turbine

Prototyping of Radial and Thrust Air Bearing for Micro Gas Turbine Proceedings of the International Gas Turbine Congress 2003 Tokyo November 2-7, 2003 DRAFT IGTC2003Tokyo TS-019 Prototyping of Radial and Thrust Air Bearing for Micro Gas Turbine Susumu KITAZAWA, Shigehiko

More information

Accelerating the Development of Expandable Liner Hanger Systems using Abaqus

Accelerating the Development of Expandable Liner Hanger Systems using Abaqus Accelerating the Development of Expandable Liner Hanger Systems using Abaqus Ganesh Nanaware, Tony Foster, Leo Gomez Baker Hughes Incorporated Abstract: Developing an expandable liner hanger system for

More information

»Product» Safety Warning

»Product» Safety Warning J1455, J1456 Installation Instructions 1984-2001 Jeep Cherokee XJ 4.5 Suspension Lift Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad

More information