FPS16 Fresh powder system

Size: px
Start display at page:

Download "FPS16 Fresh powder system"

Transcription

1 En Operating instructions and spare parts list FPS16 Fresh powder system Translation of the original operating instructions

2 Documentation FPS16 Fresh powder system Copyright 2005 Gema Switzerland GmbH All rights reserved. This publication is protected by copyright. Unauthorized copying is prohibited by law. No part of this publication may be reproduced, photocopied, translated, stored on a retrieval system or transmitted in any form or by any means for any purpose, neither as a whole nor partially, without the express written consent of Gema Switzerland GmbH. MagicCompact, MagicCylinder, MagicPlus, MagicControl, OptiFlex, OptiControl, OptiGun, OptiSelect, OptiStar and SuperCorona are registered trademarks of Gema Switzerland GmbH. OptiFlow, OptiCenter, OptiMove, OptiSpeeder, OptiFeed, OptiSpray, OptiSieve, OptiAir, OptiPlus, OptiMaster, MultiTronic, EquiFlow, Precise Charge Control (PCC), Smart Inline Technology (SIT) and Digital Valve Control (DVC) are trademarks of Gema Switzerland GmbH. All other product names are trademarks or registered trademarks of their respective holders. Reference is made in this manual to different trademarks or registered trademarks. Such references do not mean that the manufacturers concerned approve of or are bound in any form by this manual. We have endeavored to retain the preferred spelling of the trademarks, and registered trademarks of the copyright holders. To the best of our knowledge and belief, the information contained in this publication was correct and valid on the date of publication. Gema Switzerland GmbH makes no representations or warranties with respect to the contents or use of this publication, and reserves the right to revise this publication and make changes to its content without prior notice. For the latest information about Gema products, visit For patent information, see or Printed in Switzerland Gema Switzerland GmbH Mövenstrasse St.Gallen Switzerland Phone: Fax.: info@gema.eu.com

3 Table of contents General safety regulations 3 Safety symbols (pictograms)... 3 Proper use... 3 Product-specific safety measures... 4 FPS16 Fresh powder system... 4 About this manual 5 General information... 5 Function description 7 Field of application... 7 FPS16 Fresh powder system overview... 7 Versions... 7 Technical data 9 FPS16 Fresh powder system... 9 Conveying performance... 9 Electrical data... 9 Pneumatic data Dimensions Container specifications (big bag) Equipment description 11 FPS16 Fresh powder system structure Support Lifting device for large containers Fluidizing/suction tube Lifting device for fluidizing/suction tube Vibrating plate Control unit Powder pump FPS16 Fresh powder system function Powder flow detection Operating and display elements Control cabinet Control module Commissioning 17 Electrical allocation Main module inputs Main module outputs Additional module inputs Additional module outputs Pneumatic connection Powder connections FPS16 Table of contents 1

4 Commissioning Parameterization The standard display looks as follows: Parameter input display: Entering and selecting a menu option Powder flow detection Overview Procedure description Adjusting the threshold values Container change / color change / cleaning 25 Container change Color change Cleaning Maintenance 27 General information Troubleshooting 29 General information Spare parts list 31 Ordering spare parts FPS16 Fresh powder system spare parts list FPS16 Fresh powder system spare parts Fluidizing/suction tube Fluidizing/suction tube Control unit Control unit Pinch valve Table of contents FPS16

5 General safety regulations Safety symbols (pictograms) This chapter sets out the fundamental safety regulations that must be followed by the user and third parties using FPS16 Fresh powder system. These safety regulations must be read and understood before the FPS16 Fresh powder system is put into operation. The following warnings with their meanings can be found in the Gema Switzerland operating instructions. The general safety precautions must also be followed as well as the regulations in the operating instructions. DANGER! Danger due to electrically live or moving parts. Possible consequences: death or serious injury WARNING! Improper use of the equipment could damage the machine or cause it to malfunction. Possible consequences: minor injuries or damage to equipment INFORMATION! Useful tips and other information Proper use The FPS16 Fresh powder system is state of the art equipment that conforms to the recognized technical safety regulations and is designed for normal powder coating applications. Any other use is considered non-compliant. The manufacturer shall not be liable for damage resulting from such use; the user bears sole responsibility for such actions. If the FPS16 is to be used for other purposes or other substances outside of our guidelines then Gema Switzerland GmbH should be consulted. Observance of the operating, service and maintenance instructions specified by the manufacturer is also part of conformity of use. The FPS16 should only be used, maintained and started up by trained FPS16 General safety regulations 3

6 personnel, who are informed about and are familiar with the possible hazards involved. Start-up (i.e. the execution of a particular operation) is forbidden until it has been established that the FPS16 has been set up and wired according to the guidelines for machinery (2006/42 EG). EN (machine safety) must also be observed. Unauthorized modifications to the FPS16 exempt the manufacturer from any liability from resulting damage. The relevant accident prevention regulations, as well as other generally recognized safety regulations, occupational health and structural regulations are to be observed. Furthermore, the country-specific safety regulations also must be observed. Explosion protection II 3D Protection type IP54 Product-specific safety measures Installation work performed by the customer must be carried out according to local regulations. All components must be grounded according to the local regulations before start-up. Due to accident risk and depending on the placement of the fresh powder system, the safety barriers have to be placed in accordance to the local regulations. The big bag equipped with antistatic loops is grounded via the FPS suspension plate. Grounding resistance should be checked regularly and should not exceed 10 8 ohm. If the big bag is detached from the suspension plate, ensure that it is appropriately grounded, as friction charging may occur during transferring processes. FPS16 Fresh powder system The FPS16 is a constituent part of the system and is thus integrated into the safety system of the plant. If it is to be used in a manner outside the scope of the safety concept, then corresponding measures must be taken. NOTE: For further information, see the more detailed Gema safety regulations! 4 General safety regulations FPS16

7 About this manual General information This operating manual contains all important information which you require for the working with the FPS16 Fresh powder system. It will safely guide you through the start-up process and give you references and tips for the optimal use of your new powder coating system. Information about the function mode of the individual system components booth, gun control unit, and gun or powder injector should be referenced to their corresponding documents. DANGER: Working without operating instructions Working without operating instructions or with individual pages from the operating instructions may result in damage to property and personal injury if relevant safety information is not observed. Before working with the device, organize the required documents and read the section "Safety regulations". Work should only be carried out in accordance with the instructions of the relevant documents. Always work with the complete original document. FPS16 About this manual 5

8

9 Function description Field of application The FPS16 Fresh powder system is built exclusively for electrostatic coating with organic powders. Any other use is considered non-compliant. The manufacturer is not responsible for any incorrect use, and any associated risks are assumed by the user alone. FPS16 Fresh powder system overview The FPS16 Fresh powder system is suited for supplying the powder coating equipment with powder from large containers (Big Bag). The powder supply takes place continuously from the large container and in accordance to the consumption in the coating plant. The powder transport is switched on and off by messages from the level sensor in the powder container. The powder is aspirated in pulses by a vacuum, and subsequently transported with conveying air. Versions The FPS16 Fresh powder system is available either with one or with two powder pumps (FPS16-2). The FPS16-2 version permits a powder transport from the large powder container to two different destinations. FPS16-1 FPS16-2 FPS16 Function description 7

10

11 Technical data FPS16 Fresh powder system Conveying performance FPS16 Conveying performance Conveying line Hose diameter Transport side Suction line Material to be conveyed Remaining quantity g/min for each pump* (according to the material to be conveyed, suction and conveying length, powder preparation etc.) up to 8 m (5 kg/min conveying performance) 8-16 m (4 kg/min conveying performance) m (3.5 kg/min conveying performance) NW 16 mm up to 5 m Coating powder < 5% of the original container content* * The indicated values are guide values; possible deviations are dependent on the powder type and the large container (BigBag) geometry! Electrical data FPS16 Power supply Frequency 3x400 VAC 24 VDC 50/60 Hz FPS16 Technical data 9

12 Pneumatic data FPS16 Compressed air Compressed air consumption Max. water vapor content Max. oil vapor content Dimensions FPS16 Weight Max. load Container base area Container height incl. loops 5-8 bar max. 0.5 Nm³/h for lifting procedure max. 12 Nm³/h for each PP0x Powder pump max. 0.5 Nm³/h for fluidizing 1,3 g/m³ 0,1 mg/m³ approx. 340 kg 500 kg max. 800 x 1000 mm 1160/1260/1360 mm Container specifications (big bag) FPS16 Suspension system Version Safety factor Material incl. suspension loops 4-point loops square, no partition walls, with emptying funnel min. 5:1 for disposable use min. 8:1 for reuse conductive, R<10 8 ohm 10 Technical data FPS16

13 Equipment description FPS16 Fresh powder system structure The FPS16 Fresh powder system consists of: fig. 1: Structure 1 Fluidizing/suction tube 2 Control unit 3 Powder pump 4 Support 5 Vibrating plate 6 Lifting device for container 7 Lifting device for fluidizing/suction tube FPS16 Equipment description 11

14 Support The fresh powder system support is formed by three wall elements and the crossbeam for the lifting devices. The wall elements must be installed on the floor, so that the stability under load can be ensured. The crossbeam can be installed, depending on the container, on three different heights. Lifting device for large containers The lifting device for large containers consists of the suspension plate and two pneumatic cylinders. The operation and the control take place by the attached control cabinet. Fluidizing/suction tube The fluidizing/suction tube enables the loosening of the powder in the container, and aspirates the powder for the powder pump. Lifting device for fluidizing/suction tube The fluidizing/suction tube can be lifted manually by a cable and can be fixed in this position by hooking-in the final loop. The fluidizing/suction tube is lifted only during the change of the large container. Vibrating plate When using the vibrating plate, the constant powder transport is guaranteed. The vibrating plate is hung on the suspension plate by means of two spring hooks and is then laid loosely onto the Big Bag. The vibrating operation is started automatically every time the suction is switched on. However, the vibration can be manually switched on and off using an additional switch, and a light indicates the condition. Control unit All operation and control elements for the FPS16 Fresh powder system are implemented in the laterally attached control unit. Powder pump The laterally attached powder pump aspirates the powder, if required, by the fluidizing/suction tube and ensures the transport to the powder container in the coating plant. Please observe the operating manual of the corresponding powder pump! 12 Equipment description FPS16

15 FPS16 Fresh powder system function In the starting position of the FPS16 Fresh powder system, the fluidizing/suction tube is lifted up and the lifting cylinders for the large container are lowered. The large powder container is now put into the support by a pallet lifting truck. All four lifting loops are hung up to the bolts; an unintentional hangout will be prevented by the existing rubber straps. The large powder container is opened now, and the fluidizing/suction tube is slowly lowered into the powder. Now press the Conveying ready key on the control unit and the powder transport will be switched on, according to requirement. The lifting procedure of the container is now also automatically switched on by reaching the max. lifting weight (adjustable depending on cylinder pressure). Powder flow detection The powder transport is monitored by the powder flow detection during the conveying procedure. If during a powder requirement by the level sensor no or too little powder flows through the conveying line within a defined time, this will be recognized by the installed sensor. This powder shortage actuates an up/down procedure of the powder container (Big Bag). This procedure will be automatically interrupted when the Powder shortage signal resets, otherwise constantly repeated during a defined time. If the powder shortage will not be reset by the up/down procedure during a defined time, an alarm message for the operating personnel will be released. FPS16 Equipment description 13

16 Operating and display elements Control cabinet The control cabinet contains the following operating elements: , 3, 4 fig. 2: View Control cabinet Pos. Function Description 1 Main switch The complete control unit is disconnected from the mains with the main switch 2 Conveying ready The powder transport readiness takes place by pressing the Conveying ready key The readiness is indicated by the indicator lamp (pos. 6) Therewith, the lifting up of the large container will be started. Depending on the weight in the large container, the lifting up takes place after the powder discharge, if the weight of the container is smaller than the adjusted lifting power of the pneumatic cylinders As soon as the level sensor of the powder container detects empty, the powder transport and the vibrating plate switch on automatically 3 Cleaning By pressing the Cleaning key, the rinsing procedure of the powder pump will be started. The suction unit must be lifted manually and can be blown off with compressed air and can be cleaned (Attention large dust formation possible!) 4 Conveying off By pressing the Conveying off key, the powder conveying procedure will be interrupted and the large powder container lowers immediately. 5 Big Bag empty This red indicator lamp illuminates, if the powder flow sensor does not detect powder during a defined time. Now the large powder container must be checked by the operating personnel and probably be changed 14 Equipment description FPS16

17 Control module fig. 3: Control module 1 Power pack 2 Main module 3 Additional module FPS16 Equipment description 15

18

19 Commissioning Electrical allocation WARNING: The equipment and the vibrating plate are necessarily to be grounded with the ground connection! As ground conductor, use a copper cable with a cross-section of at least 4 mm²! Main module inputs Entry I1 Description External interlocking/automatic operating mode must be operated with switch control unit is ready for operation. Powder box will be lifted I2 External fresh powder requirement (pump 1) I3 External fresh powder requirement (pump 2) I4 I5 I6 Activate cleaning mode Reserve Reserve I7 Analog input 0-10 V / pressure sensor for pump 1 I8 Analog input 0-10 V / pressure sensor for pump 2 Main module outputs Output Q1 Q2 Q3 Q4 Description Main solenoid valve Solenoid valve lift cylinder Warning lamp no powder Potential-free contact no powder (max. voltage 230 VAC) FPS16 Commissioning 17

20 Additional module inputs Entry Description I1-I4 Reserve Additional module outputs Output Description Q1 Conveying on pump 1 Q2 Conveying on pump 2 Q3 Pinch valve preventing wrong air suction of pump 1 Q4 Pinch valve preventing wrong air suction of pump 2 Pneumatic connection The compressed air must be connected to the control unit input in accordance to the specifications. All compressed air consumers will be supplied by the control unit Description 1 Lift/lower 2 3 Fluidizing air P min = 0,5 bar Compressed air supply of pinch valves (only FPS16-2 version) P max. = 3,0 bar Powder connections The powder hose must be connected according to the corresponding powder pump(s). 18 Commissioning FPS16

21 Commissioning By the start-up of the FPS16 Fresh powder system, the following points are to be observed: 1. Check the grounding of the enclosure 2. Hook in the large container into every four loops 3. Fit the vibrating plate 4. Ensure the grounding of the vibrating plate 5. Check the compressed air supply 6. Check the power supply 7. Switch on the main switch 8. Activate the operating release NOTE: For the adjustment and the operation of the powder transport, the corresponding powder pump documentation must be observed! Parameterization The various time sequences can be easily set and adapted to all plantspecific requirements by the aid of a simple menu control unit. Read carefully this section, before access to a menu option! The standard display looks as follows: not to be used Set parameter not to be used not to be used Parameter input display: Block number The value set at Parameter Time ON The value set at Parameter Time OFF Current time FPS16 Commissioning 19

22 Entering and selecting a menu option Select the Set Param menu with the key. Important: No other menu may be selected; otherwise the program becomes unusable for the control unit! Press OK. The first block B1 appears. Press the key, the block B2 appears. Select Block B2 until B4 with the triangular arrow key. Press OK Select and modify the values with the arrow keys. Done Change Move or or Press OK The values are saved, and the block B2 appears. Quit the program mode with the ESC key and return to the normal display WARNING! The control unit continues to process the program in the "Parameterization" operating mode! 20 Commissioning FPS16

23 Parameterization Block no. (Parameter) B001 B002 B009 B010 Designation Default value Remarks Powder flow measurement delay Cylinder lift/lower cycle Analog threshold values of the pump 1 switch Analog threshold values of the pump 2 switch 2.0 secs. Lift: TH = 30.0 secs. Lower: TL = 50.0 secs. Threshold value down: ON = 150 Threshold value up: OFF = 900 Threshold value down: ON = 250 Threshold value up: OFF = 900 B014 Error message delay T = 50.0 secs. B016 Debouncing of B001 T = 10.0 secs. B017 Debouncing of B014 T = 3.0 secs digits corresponds to 2.5 bar (e.g. 150 = 0.36 bar) 1024 digits corresponds to 2.5 bar (e.g. 150 = 0.36 bar) The pressure monitoring must indicate no powder for a defined duration, until the signal will be evaluated The no powder signal must be present for a defined duration NOTE: For the adjustment and the operation of the powder transport, the corresponding powder pump documentation must be observed! FPS16 Commissioning 21

24 Powder flow detection Overview If craters arise from the suction procedure in the powder container, the powder flow can thereby be influenced negatively. In order to prevent this, a pressure sensor measures the backpressure in the powder hose. If the pressure decreases under a defined threshold value, the powder container is lowered to the floor and lifted again, so that the craters can be loosen. Powder container full Backpressure in the powder hose Threshold value down (variable) Threshold value reached Powder flow OK Pump Powder container full Craters in the powder container/container empty Backpressure in the powder hose Threshold value down (variable) Pump Threshold value not reached Powder flow not OK Craters in the powder container/container empty 22 Commissioning FPS16

25 Procedure description If the powder flow measurement of pump 1 or 2 reacts, the analog inputs of the pump 1 or pump 2 are set. This means, that no powder will be fed now (pinholing, powder container is empty or hose is bent). After the elapse of B001, the signal will be transmitted to B002. The powder container is now lowered and lifted again, according to B002 parameters. At the same time, B014 will be activated (error message delay). After the elapse of the set duration, the indicator lamp on the control cabinet door will be activated. At the same time, the potential-free contact is set, which can be evaluated by an external reporting device. Adjusting the threshold values Lower threshold value The lower threshold depends of the length of the conveying distance and the filling by the powder pump. Example: Length of the conveying distance 15 m, default value 150 OK! Length of the conveying distance 5 m, default value approx. 80 adjust! Upper threshold value The upper threshold value limits the correct functionality of the powder transport. The exceeding signifies a malfunction (powder hose is clogged or bent). Example: Default value 900 corresponds to 2.2 bar (suction and conveying procedure of the pump will be influenced) FPS16 Commissioning 23

26

27 Container change / color change / cleaning Container change The container change takes place according to the following instructions: 1. Press the Conveying off key, the automatic conveying will be interrupted and the lifting device will be lowered 2. Lift the fluidizing/suction tube by manual lifting device out of the large container 3. Hang out the vibrating plate 4. Hang out the empty container bag and remove it 5. Put the full large container into the support by a pallet lifting truck 6. Hook in the large container with every four loops, open the container on the top and insert the fluidizing/suction tube WARNING: Observe the right position of the safety straps on the bolts! 7. Fit the vibrating plate 8. Press the Conveying ready key 9. Lower the fluidizing/suction tube manually and slowly into the large powder container Color change A color change with a partially emptied large container must take place in same way. In this case, it's important that the partially emptied container is well locked for storage. FPS16 Container change / color change / cleaning 25

28 Cleaning In order to achieve a long-term trouble-free operation of the FPS16 Fresh powder system, it is important that also the environment is kept clean every day. The fresh powder system, as well as the fluidizing/suction tube does not require a special cleaning. NOTE: By cleaning the powder pump, the specific documents are to be observed! 26 Container change / color change / cleaning FPS16

29 Maintenance General information The FPS16 Fresh powder system does not require a special maintenance. However, the following steps are to be observed regularly: 1. Check grounding resistance. The measured value should not exceed 10 8 ohm. Measuring points: suspension bolts > main grounding connection at rear of unit 2. Constant compressed air quality observe the maintenance unit on the compressed air connection 3. Cleanliness of the environment 4. Powder pump maintenance see the corresponding documents 5. Check the fluidizing pads of the fluidizing/suction tube for damage FPS16 Maintenance 27

30

31 Troubleshooting General information Fault Causes Fault remedying The large container has not been lifted up Too low or no conveying performance of the powder pump Compressed air not present Lifting force smaller than the weight of the large container No mains voltage present Switch Conveying ready is not switched on Fluidizing/suction tube not lowered Vibrating plate not functioning or NOT SWITCHED ON Fluidizing air not present: - Fluidizing air supply not connected to the suction tube - Fluidizing air supply is bent Too much fluidizing air present Fluidizing/suction tube clogged Connect the compressed air Increase the lifting cylinder pressure Switch on the main switch Check the fuse F1 Switch on Check connection Replace vibrator Adjust the fluidizing air with the pressure regulator in the control cabinet Plug in fluidizing air hose Lay out fluidizing air hose as straight as possible Reduce the fluidizing air with the pressure regulator in the control cabinet Lift the fluidizing/suction tube and clean it FPS16 Troubleshooting 29

32 Fault Causes Fault remedying Observe the connection and the powder pump instructions Powder pump defect No signal for fresh powder requirement Pinch valve defective, excess air suction defective Pinholing will not be solved Repair powder pump Check wiring Check level sensor signal Check/replace pinch valve hose Contact an Gema service center 30 Troubleshooting FPS16

33 Spare parts list Ordering spare parts When ordering spare parts for powder coating equipment, please indicate the following specifications: Type and serial number of your powder coating equipment Order number, quantity and description of each spare part Example: Type FPS16 Serial number Order no , 1 piece, Clamp Ø 18/15 mm When ordering cable or hose material, the required length must also be given. The spare part numbers of this bulk stock is always marked with an *. Wearing parts are always marked with a #. All dimensions of plastic hoses are specified with the external and internal diameter: Example: Ø 8/6 mm, 8 mm outside diameter (o/d) / 6 mm inside diameter (i/d) WARNING! Only original Gema spare parts should be used, because the explosion protection will also be preserved that way. The use of spare parts from other manufacturers will invalidate the Gema guarantee conditions! FPS16 Spare parts list 31

34 FPS16 Fresh powder system spare parts list FPS16-1 Fresh powder system complete FPS16-2 Fresh powder system complete Fluidizing/suction tube complete (see corresponding spare parts list) 2 Pinch valve (see corresponding spare parts list) 3 Control unit (see corresponding spare parts list) 4 PP0x Powder pump (see the corresponding operating manual) 5 Cylinder Ø 100 mm, stroke=500 mm Adapter nipple 1/2"-1/8" Elbow joint 1/8"-1/8" Check valve 1/8", with fix throttle Rubber strap Roller Sliding bearing Plastic hose Ø 8/6 mm * 13 Pressure sensor bar, G1/2" Pressure sensor cable (for pos. 13, not shown) Wire rope * 15 Steel bolt dowel M10x89 mm Spring hook Round sling Grounding cable complete Vibrator Grounding cable complete with clamp (not shown) A Powder hose Ø 23/16 mm Parts set for FPS16 (not shown), consisting of: Roller Clamp Fluidizing pad 1/8" * Please indicate length 32 Spare parts list FPS16

35 FPS16 Fresh powder system spare parts A fig. 4: Spare parts FPS16 Spare parts list 33

36 Fluidizing/suction tube Fluidizing/suction unit complete Fluidizing ring Fluidizing pad 1/8" Spacer bolt External tube Coupling ring O-ring Ø 35x2 mm O-ring Ø 25x2 mm Connection case, double Hose connection # 10 O-ring Ø 16x2 mm Connector NW5, 1/8" Quick release connection NW5, Ø 8 mm Connection case, single Powder hose Ø 23/16 mm *# * Please indicate length # Wearing parts 34 Spare parts list FPS16

37 Fluidizing/suction tube fig. 5: Fluidizing/suction tube FPS16 Spare parts list 35

38 Control unit 1 Solenoid valve 1/8", NW 5, 24 VDC, complete, consisting of: Solenoid valve 5-1/8" Valve coil 24 VDC R/F unit 1/2", 0-10 bar Pressure gauge 1/8", round, 0-10 bar Double nipple 1/2"-1/2" Adapter 1/2"-1/2" Connection fitting 1/2"-1/2" Lead-through connection Ø 8/8 mm Adjusting elbow Ø 8/8 mm Y-piece Ø mm Plug screw M Locknut M Cable connection M Locknut M Plug screw M Plug cap Ø 8 mm Elbow joint 1/4", Ø 8 mm Y-piece 1/4"-1/4"-1/4" Connection sleeve 1/2"-1/4" Pressure gauge 1/8", round, 0-6 bar Elbow joint 1/4"-1/4" Y-connection fitting 1/4", Ø 8 mm Solenoid valve 1/8", NW 5, 24 VDC, complete, consisting of: Solenoid valve 3-1/8" Valve coil 24 VDC Pressure regulator bar Elbow joint 1/8", Ø 8 mm Control cabinet (empty) Spare parts list FPS16

39 Control unit fig. 6: Control unit FPS16 Spare parts list 37

40 Pinch valve A Pinch valve NW15, complete Powder hose Ø 23/16 mm *# 2 Hose clamp Ø mm Hose connection Ø 17 mm Screw 5x26 mm Pinch valve hose NW # 6 Elbow joint 1/4", Ø 8 mm * Please indicate length # Wearing parts A fig. 7: Pinch valve 38 Spare parts list FPS16

41 FPS16 Spare parts list 39

WPS02 Waste powder conveying with BIG-BAG station

WPS02 Waste powder conveying with BIG-BAG station En Operating instructions and spare parts list WPS02 Waste powder conveying with BIG-BAG station Translation of the original operating instructions Documentation WPS02 Copyright 2008 ITW Gema GmbH All

More information

Application cup for OptiFlex 2 GM03 manual powder gun

Application cup for OptiFlex 2 GM03 manual powder gun En Operating instructions and spare parts list Application cup for OptiFlex 2 GM03 manual powder gun Translation of the original operating instructions Documentation OptiFlex GM03 application cup Copyright

More information

Operating instructions and spare parts list. Waste powder conveying from recovery container WPS01

Operating instructions and spare parts list. Waste powder conveying from recovery container WPS01 En Operating instructions and spare parts list Waste powder conveying from recovery container WPS01 Documentation WPS01-PP03 Copyright 2006 ITW Gema GmbH All rights reserved. This publication is protected

More information

Operating instructions and spare parts list. LM01 Level sensor. Translation of the original operating instructions

Operating instructions and spare parts list. LM01 Level sensor. Translation of the original operating instructions En Operating instructions and spare parts list LM01 Level sensor Translation of the original operating instructions Documentation LM01 Level sensor Copyright 2005 Gema Switzerland GmbH All rights reserved.

More information

Powder injector OptiFlow IG07

Powder injector OptiFlow IG07 Rev. 00 1011 527 EN Operating instructions and Spare parts list Powder injector OptiFlow IG07 Translation of the original operating instructions Documentation OptiFlow IG07 Copyright 2017 Gema Switzerland

More information

OptiSpray F Manual coating equipment

OptiSpray F Manual coating equipment En Operating instructions and spare parts list OptiSpray F Manual coating equipment Translation of the original operating instructions Documentation OptiSpray F Manual coating equipment Copyright 2006

More information

OptiCenter OC01 Powder management center

OptiCenter OC01 Powder management center En Operating instructions and spare parts list OptiCenter OC01 Powder management center Translation of the original operating instructions Documentation - OptiCenter OC01 Copyright 2009 Gema Switzerland

More information

OptiGun 2-AE1 Enamel automatic gun (GA02-E1 type)

OptiGun 2-AE1 Enamel automatic gun (GA02-E1 type) En Operating instructions and spare parts list OptiGun 2-AE1 Enamel automatic gun (GA02-E1 type) II 2 D Translation of the original operating instructions Documentation OptiGun 2-AE1 Enamel automatic gun

More information

OptiFlow powder injector (IG02 type)

OptiFlow powder injector (IG02 type) En Operating instructions and spare parts list OptiFlow powder injector (IG02 type) Translation of the original operating instructions Documentation OptiFlow powder injector (IG02 type) Copyright 2004

More information

Operating Instructions and Spare Parts List. Tilt Table FPS13. Ausgabe 07/02. Tilt Table FPS13

Operating Instructions and Spare Parts List. Tilt Table FPS13. Ausgabe 07/02. Tilt Table FPS13 E Operating Instructions and Spare Parts List 15 Copyright 2000 ITW Gema AG., CH-9015 St. Gall All rights reserved. This publication is protected by copyright. Unauthorized copying is prohibited by law.

More information

OptiGun GA03 Automatic powder gun

OptiGun GA03 Automatic powder gun 1010 772 En Operating instructions and spare parts list OptiGun GA03 Automatic powder gun 0102 II 2D Translation of the original operating instructions Documentation OptiGun GA03 Automatic powder gun Copyright

More information

Powder coating equipment OptiFlex 2 BN (Boron Nitride)

Powder coating equipment OptiFlex 2 BN (Boron Nitride) En Operating instructions and spare parts list Powder coating equipment OptiFlex 2 BN (Boron Nitride) WARNING: This equipment was developed for use with electrically non-conducting powders. The use of

More information

OptiGun GA03-P Automatic powder gun

OptiGun GA03-P Automatic powder gun 1011 460 En Operating instructions and spare parts list OptiGun GA03-P Automatic powder gun 0102 II 2D Translation of the original operating instructions Documentation OptiGun GA03-P Automatic powder gun

More information

Operating instructions and spare parts list. OptiFlow powder injector (IG02 type)

Operating instructions and spare parts list. OptiFlow powder injector (IG02 type) En Operating instructions and spare parts list OptiFlow powder injector (IG02 type) Documentation OptiFlow powder injector (IG02 type) Copyright 2004 ITW Gema AG All rights reserved. This publication is

More information

OptiCenter OC05 Powder management center

OptiCenter OC05 Powder management center 1011 506 En Operating instructions and spare parts list OptiCenter OC05 Powder management center Translation of the original operating instructions Documentation OptiCenter OC05 Copyright 2008 Gema Switzerland

More information

MagicCenter MC01 Powder management system

MagicCenter MC01 Powder management system En Operating instructions and spare parts list MagicCenter MC01 Powder management system Translation of the original operating instructions Dokumentation - MagicCenter MC01 Copyright 2008 ITW Gema GmbH

More information

OptiCenter OC02 Powder management center

OptiCenter OC02 Powder management center 1011 502 En Operating instructions and spare parts list OptiCenter OC02 Powder management center Translation of the original operating instructions Documentation OptiCenter OC02 Copyright 2008 Gema Switzerland

More information

Manual coating equipment OptiFlex 2 B

Manual coating equipment OptiFlex 2 B En Operating instructions and spare parts list Manual coating equipment OptiFlex 2 B Translation of the original operating instructions Documentation OptiFlex 2 B Copyright 2010 ITW Gema GmbH All rights

More information

OptiFlow Plug-in injector (IG02)

OptiFlow Plug-in injector (IG02) E Operating Instructions and Spare Parts List OptiFlow Plug-in injector (IG02) IG02 OptiFlow Injector 9 10 IG02 OptiFlow Injector Table of Contents 1 OptiFlow plug-in injector for organic powders...............................

More information

Robot gun RobotGun GM03-R

Robot gun RobotGun GM03-R Rev. 00 1011 533 EN Operating instructions and Spare parts list Robot gun RobotGun GM03-R Translation of the original operating instructions Documentation RobotGun GM03-R Copyright 2017 Gema Switzerland

More information

Operating instructions and spare parts list. XT08 Horizontal axis

Operating instructions and spare parts list. XT08 Horizontal axis En Operating instructions and spare parts list XT08 Horizontal axis Documentation XT08 Copyright 2004 ITW Gema AG All rights reserved. This publication is protected by copyright. Unauthorized copying is

More information

Rev EN. Operating instructions and Spare parts list. Vertical axis ZA13. Translation of the original operating instructions

Rev EN. Operating instructions and Spare parts list. Vertical axis ZA13. Translation of the original operating instructions Rev. 00 1011 516 EN Operating instructions and Spare parts list Vertical axis ZA13 Translation of the original operating instructions Documentation ZA13 Copyright 2017 Gema Switzerland GmbH All rights

More information

Manual gun OptiSelect GM03

Manual gun OptiSelect GM03 Rev. 01 1011 454 EN Operating instructions and Spare parts list Manual gun OptiSelect GM03 Translation of the original operating instructions Documentation OptiSelect GM03 Copyright 2018 Gema Switzerland

More information

Manual powder gun OptiFlex 2 GM03

Manual powder gun OptiFlex 2 GM03 En Operating instructions and spare parts list Manual powder gun OptiFlex 2 GM03 Translation of the original operating instructions Documentation OptiFlex 2 GM03 Copyright 2010 ITW Gema GmbH All rights

More information

Manual coating equipment OptiFlex 2 B

Manual coating equipment OptiFlex 2 B En Quick reference guide Manual coating equipment Translation of the original operating instructions Documentation Copyright 2010 Gema Switzerland GmbH All rights reserved. This publication is protected

More information

EasySelect GM01-E Manual Powder Gun

EasySelect GM01-E Manual Powder Gun E Operating Instructions and Spare parts list EasySelect GM01-E Manual Powder Gun EasySelect GM01-E 25 26 EasySelect GM01-E Table of Contents Safety rules Safety rules for electrostatic powder coating

More information

XT 6 Horizontal Axis

XT 6 Horizontal Axis E Operating Instructions and Spare Parts List 11 12 Table of Contents................................................... 1 1. Field of Application........................................... 1 2. Description.................................................

More information

OptiGun 2-AE Automatic Powder Gun (GA02)

OptiGun 2-AE Automatic Powder Gun (GA02) E Operating Instructions and Spare Parts List Automatic Powder Gun (GA02) 31 32 Table of Contents 1. Operating Instructions................................................... 1 1.1. Safety rules for electrostatic

More information

Operating instructions and spare parts list. OptiFlex F. Manual coating equipment

Operating instructions and spare parts list. OptiFlex F. Manual coating equipment En Operating instructions and spare parts list OptiFlex F Manual coating equipment Documentation OptiFlex B manual coating equipment Copyright 2005 ITW Gema AG All rights reserved. This publication is

More information

Manual equipment OptiFlex 2 F

Manual equipment OptiFlex 2 F Rev. 00 1007 142 EN Quick reference guide Manual equipment OptiFlex 2 F Translation of the original operating instructions Documentation OptiFlex 2 F Copyright 2016 Gema Switzerland GmbH All rights reserved.

More information

Quick reference guide. OptiFlex F. Manual coating equipment. Translation of the original operating instructions

Quick reference guide. OptiFlex F. Manual coating equipment. Translation of the original operating instructions En Quick reference guide OptiFlex F Manual coating equipment Translation of the original operating instructions Quick reference guide OptiFlex F manual coating equipment Copyright 2006 Gema Switzerland

More information

EasySelect-Cup Manual Powder Gun

EasySelect-Cup Manual Powder Gun E Operating Instructions and Spare parts list EasySelect-Cup Manual Powder Gun EasySelect-Cup 27 28 EasySelect-Cup Table of Contents Safety rules EasySelect-Cup Manual Powder gun...........................................

More information

Operating instructions and spare parts list FPS14 Fresh powder system

Operating instructions and spare parts list FPS14 Fresh powder system En Operating instructions and spare parts list FPS14 Fresh powder system 0102 II 3 D Documentation FPS14 Fresh powder system Copyright 2004 ITW Gema AG All rights reserved. This publication is protected

More information

Operating instructions and spare parts list. OptiFlex S. Manual coating equipment

Operating instructions and spare parts list. OptiFlex S. Manual coating equipment En Operating instructions and spare parts list OptiFlex S Manual coating equipment Documentation OptiFlex S manual coating equipment Copyright 2005 ITW Gema AG All rights reserved. This publication is

More information

Operating instructions and spare parts list OptiStar CG07 Manual gun control unit

Operating instructions and spare parts list OptiStar CG07 Manual gun control unit En Operating instructions and spare parts list OptiStar CG07 Manual gun control unit Order no. 1004 068 Documentation OptiStar CG07 Manual gun control unit Copyright 2006 ITW Gema AG All rights reserved.

More information

Operating instructions and spare parts list. OptiSelect. Manual powder gun

Operating instructions and spare parts list. OptiSelect. Manual powder gun En Operating instructions and spare parts list OptiSelect Manual powder gun Documentation OptiSelect manual powder gun Copyright 2005 ITW Gema AG All rights reserved. This publication is protected by copyright.

More information

ADU 2 Air Distribution Unit

ADU 2 Air Distribution Unit E Operating Instructions and Spare Parts List ADU Air Distribution Unit ADU 0 bar 4 0 bar 4 GEMA VOLSTATIC ADU 9 An ITW Company ADU Table of Contents ADU Air distribution unit Description.................................................

More information

Assembly and Maintenance Manual Type ASNU

Assembly and Maintenance Manual Type ASNU Assembly and Maintenance Manual Type ASNU Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_ASNU.docx

More information

Operating instructions and spare parts list. FPS15 Tilt table

Operating instructions and spare parts list. FPS15 Tilt table En Operating instructions and spare parts list FPS5 Tilt table Documentation FPS5 Tilt table Copyright 004 ITW Gema AG All rights reserved. This publication is protected by copyright. Unauthorized copying

More information

CRS-D Powder Coating Booth with Reverse Jet Cleaning System

CRS-D Powder Coating Booth with Reverse Jet Cleaning System Operating Instructions CRS-D Powder Coating Booth with Reverse Jet Cleaning System CRS-D (J) 27 1 1 1 2 2 2 4 4 4 3 3 3 CRS-D Booth with Reverse Jet Cleaning System 1 10 2 3 9 12 11 11 1 Exhaust air unit

More information

Operating Instructions and Spare Parts List. ZA02 Reciprocator. EIssued 08/03. ZA02 Reciprocator 29

Operating Instructions and Spare Parts List. ZA02 Reciprocator. EIssued 08/03. ZA02 Reciprocator 29 E Operating Instructions and Spare Parts List 29 30 Table of Contents Safety Rules Technical data for the ZA 02 Reciprocator Schematic Diagram 1. Description of function..................................................

More information

Operating instructions and spare parts list. OptiStar CG07 Manual Gun control unit

Operating instructions and spare parts list. OptiStar CG07 Manual Gun control unit En Operating instructions and spare parts list OptiStar CG07 Manual Gun control unit Documentation OptiStar CG07 Gun control unit Copyright 2005 ITW Gema AG All rights reserved. This publication is protected

More information

Operating instructions and spare parts list. PZ Powder center with Gematic control unit

Operating instructions and spare parts list. PZ Powder center with Gematic control unit En Operating instructions and spare parts list PZ Powder center with Gematic control unit Documentation PZ Powder center with Gematic control unit Copyright 2004 ITW Gema AG All rights reserved. This publication

More information

Operating instructions

Operating instructions Operating instructions Digital tank contents indicator DTA 10 DTA 10 DTA 10 0 4.0 m fuel oil 0 3.5 m water Read instructions before using device! Observe all safety information! Keep instructions for future

More information

Operating instructions and spare parts list. MagicCylinder II Powder coating booth

Operating instructions and spare parts list. MagicCylinder II Powder coating booth En Operating instructions and spare parts list MagicCylinder II Powder coating booth Documentation - Powder coating booth MagicCylinder II Copyright 2007 ITW Gema GmbH All rights reserved. This publication

More information

Assembly and Maintenance Manual Type AS

Assembly and Maintenance Manual Type AS Assembly and Maintenance Manual Type AS Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_AS.docx

More information

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z INSTRUCTION MANUAL I/P Converter DSG BXXY3Z DSG BXXY4Z Revision 2.0 3.626 016136 en Page 1/15 Should you have any questions concerning the I/P converter, please contact the Service Department of the Product

More information

Oil-free piston compressors KK and piston vacuum pumps KV

Oil-free piston compressors KK and piston vacuum pumps KV Oil-free piston compressors KK and piston vacuum pumps KV Installation and Operating Instructions 0678106030L02 1707V003 Contents Important information 1 About this document 2 1.1 Warnings and symbols

More information

Instruction Manual. Automatic Fuel Oil De-aerator Flow-Control. Flow-Control 3/K-1 # Flow-Control 3/K-2 # 70019

Instruction Manual. Automatic Fuel Oil De-aerator Flow-Control. Flow-Control 3/K-1 # Flow-Control 3/K-2 # 70019 Mess-, Regel- und Überwachungsgeräte für Haustechnik, Industrie und Umweltschutz Lindenstraße 20 DE-74363 Güglingen Telefon: +49(0)7135-102-0 Service: +49(0)7135-102-211 Telefax: +49(0)7135-102-147 E-Mail:

More information

APS 2. Automatic Powder System

APS 2. Automatic Powder System E Automatic Powder System An ITW Company 17 Table of Contents Automatic Powder System 1. Fields of application........................................... 1 2. Scope of delivery.............................................

More information

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE 2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE For Diaphragm Dosing Pumps FEM 1.02_.55 / FEM 1.09_.55 Controller board package, without pump: ID 160536 Operating and Installation Manual It is important to

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 018 AC Pressure NPK 018 DC Pressure NPK 018 AC Vacuum NPK 018 DC Vacuum Operating and Installation Instructions Read and observe these Operating and Installation

More information

Mini UHV gate valve with manual actuator with pneumatic actuator

Mini UHV gate valve with manual actuator with pneumatic actuator Mini UHV gate valve with manual actuator with pneumatic actuator This manual is valid for the valve ordering numbers: 004/8/3/34-. E0/08 004/8/3/34-. E//3/4 004/8/3/34-. E//3/4 004/8/3/34-. E4/4/34/44

More information

The function of this Dynamic Active Probe has divided into three preferences on the screen main Menus:

The function of this Dynamic Active Probe has divided into three preferences on the screen main Menus: 1.0 Introduction: This probe is designed to provide an additional help to automotive technicians in trouble shooting of electrical circuits problems in the car. Apart from using the normal multi tester,

More information

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC)

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC) User Guide Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC) version 04/2013 Content General Information 3 Warning 3 Scope of Supply 3 Overview 3 General safety details 4 Intended use 4

More information

EPS 16 ATEX 1072 X, IECEx EPS X. Operating Instructions. Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19

EPS 16 ATEX 1072 X, IECEx EPS X. Operating Instructions. Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19 , IECEx EPS 16.0030X Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19 Device with II 2G/D Ex approval Geräte mit II 2G/D Ex Zulassung Appareils avec mode de protection II 2G/D Ex

More information

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator Installation, Operating & Maintenance Instructions All-metal gate valve with compact or extended pneumatic actuator Series 48 DN 16 320 mm (I.D. ⅝" 12") This manual is valid for the following product ordering

More information

Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps

Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps UNPK04DC Pressure UNPK04DCB Pressure UNPK04DC Vacuum UNPK04DCB Vacuum KNF Neuberger, Inc 2 Black Forest Rd Trenton, NJ

More information

EASY 1-F Powder Coating Equipment

EASY 1-F Powder Coating Equipment E Operating Instructions and Spare parts list EASY 1-F Powder Coating Equipment 0102 II (2) D EASY 1-F ELECTROSTATIC POWER MANUAL EQUIPMENT 13 14 1 2 12 11 10 9 8 3 4 5 6 7 1 EasyTronic control unit 2

More information

ECONOMISER SERIES E2T USER MANUAL

ECONOMISER SERIES E2T USER MANUAL TURBO S.R.L. Electronic Control Systems for Dust Collectors e-mail: info@turbocontrols.it web: www.turbocontrols.it TEL. ++39 (0)362 574024 FAX ++39 (0)362 574092 ECONOMISER SERIES E2T USER MANUAL 24/06/2014

More information

HST -LS Interlocking device (Translation of Original Manual)

HST -LS Interlocking device (Translation of Original Manual) Installation and Operating Manual for Components HST -LS Interlocking device (Translation of Original Manual) HST-LS Ident.-No.: 10268 HST-LS Ident.-No.: 10269 HST-LS, pictured Ident-Nr. 10269 The image

More information

Operating Instructions and Spare Parts List. PG 1-Cup Gun. Issued 09/98

Operating Instructions and Spare Parts List. PG 1-Cup Gun. Issued 09/98 E Operating Instructions and Spare Parts List 27 28 Table of Contents Directions for use Electrostatic Manual Spraying equipment for Powder Coating Safety rules for the electrostatic powder coating Technical

More information

PG 1-A Automatic Powder Gun

PG 1-A Automatic Powder Gun E Operating Instructions and Spare Parts List Automatic Powder Gun 25 26 Tabel of Contents Safety rules for electrostatic powder coating operations Automatic powder gun...........................................

More information

Exchange of rollers from the XTS-Mover

Exchange of rollers from the XTS-Mover Service documentation for AT901-0050-0550 and AT9011-00x0-0550 Version: Date: 1.0 0.10.017 Table of contents Table of contents 1 Foreword... 5 1.1 Notes on the documentation... 5 1. Documentation issue

More information

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN Operating instructions Rotary actuators M135 M140 M150 M180 June 2012 / 118614 / EN General information General information Proof of amendment Copyright Subject to alterations Manufacturer Version Date

More information

Rectangular Door L-VAT with pneumatic actuator double acting

Rectangular Door L-VAT with pneumatic actuator double acting Rectangular Door L-VAT with pneumatic actuator double acting This manual is valid for the products: 0 7 5 1 0 U A 2 4 0 0 0 1 4 character option code Size 10... 46 x 236 12... 50 x 336 Actuator 24... without

More information

PTB 14 ATEX 2023 X, IECEx PTB X. Operating Instructions. Solenoid coil Type AC10 Magnetspule Typ AC10 Bobine magnétique Type AC10

PTB 14 ATEX 2023 X, IECEx PTB X. Operating Instructions. Solenoid coil Type AC10 Magnetspule Typ AC10 Bobine magnétique Type AC10 , IECEx PTB 14.0049X Solenoid coil Type AC10 Magnetspule Typ AC10 Bobine magnétique Type AC10 Device with II 2G/D Ex approval Geräte mit II 2G/D Ex Zulassung Appareils avec mode de protection II 2G/D Ex

More information

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Installation Guide WBP-Box-IEN103320 IMEN-WBP-BOX Version 2.0 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

MANN+HUMMEL ENTARON XD. Installation and Maintenance Manual. Version 0709

MANN+HUMMEL ENTARON XD. Installation and Maintenance Manual. Version 0709 MANN+HUMMEL ENTARON XD Installation and Maintenance Manual Version 0709 Contact information This installation and maintenance manual is a component part of the scope of delivery. It must be kept in a safe

More information

Installation, Operating & Maintenance Instructions. Series 081, DN (I.D. 2½" - 4") Hot surfaces; do not touch!

Installation, Operating & Maintenance Instructions. Series 081, DN (I.D. 2½ - 4) Hot surfaces; do not touch! Vacuum Gate Valve This manual is valid for the valve ordering number(s): 08136-FA14/24/34/44 08138-FA14/24/34/44 08140-FA14/24/34/44 The fabrication number is indicated on each product as per the label

More information

KeContact P20. User manual

KeContact P20. User manual KeContact P20 User manual Comments to this manual In this manual you will find warnings against possible dangerous situations. The used symbols apply to the following meanings:!! WARNING! Indicates a potentially

More information

Big Bag Unloader. Customer Product manual Part Number Issued 07/17

Big Bag Unloader. Customer Product manual Part Number Issued 07/17 Big Bag Unloader Customer Product manual Part Number 7580188-01 Issued 07/17 For parts ordering, call the Industrial Coating Systems EU Customer Support Center on 0080070017001 or contact your local Nordson

More information

UHV Angle valve (Series 284) with pneumatic actuator, single acting with closing spring (NC)

UHV Angle valve (Series 284) with pneumatic actuator, single acting with closing spring (NC) UHV Angle valve (Series 84) with pneumatic actuator, single acting with closing spring (NC) This manual is valid for the valve ordering number(s): 84 85 The fabrication number is indicated on each product

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation Type 0131 2/2- or 3/2-way solenoid valve 2/2- oder 3/2-Wege-Magnetventil Électrovanne 2/2 ou 3/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating

More information

MPS 1-B / MPS 2-B Manual Powder System

MPS 1-B / MPS 2-B Manual Powder System E Operating Instructions and Spare Parts List MPS -B / MPS -B Manual Powder System MPS -B / MPS -B 7 Issued / - V. Issued / - V. 8 MPS -B / MPS -B Table of Contents Directions for use Safety rules for

More information

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z Installation and operating instructions Solar charge controller MPPT 10 A / 20 A EN 1 Contents 1. About these instructions... 3 1.1 Applicability... 3 1.2 Users... 3 1.3 Description of symbols... 3 2.

More information

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017 Operator s Manual Fairbanks FH Series 2017 by Fairbanks Scales, Inc. All rights reserved 51393. Revision 1 06/2017 Amendment Record Fairbanks FH Series Operator s Manual Operator s Manual Document 51393

More information

MPS 1-L Manual Powder System with the PG 1 Powder Gun

MPS 1-L Manual Powder System with the PG 1 Powder Gun bar... 0. m /h 00 00 90 90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 kv µa E Operating Instructions and Spare Parts List MPS -L Manual Powder System with the PG Powder Gun 0 0 + m /h Issued 0/9 MPS -L / PG An ITW

More information

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.:

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.: Operating manual HDA eco Box 12/24V DC Automatic Dispenser Item No.: 110 500 900 Translation of the original operating manual Important! Copyright The operating manual is always to be read before commissioning

More information

Assembly and Maintenance Manual Type RSBW

Assembly and Maintenance Manual Type RSBW Assembly and Maintenance Manual Type RSBW Hatschekstr. 36 69126 Heidelberg Germany Tel +49(0)6221 30470 Tel +49(0)6221 304731 info@stieber.de www.stieber.de Stieber Clutch Date of issue: 16/03/2017 GB

More information

Inhalt. Granule jet blasting device PG 5 8. Owner s Manual. Translation of the original instructions

Inhalt. Granule jet blasting device PG 5 8. Owner s Manual. Translation of the original instructions Inhalt Granule jet blasting device PG 5 8 Owner s Manual Translation of the original instructions 1 This instruction manual is protected by copyright. No use outwith the strict limitations of copyright

More information

Assembly instructions PRORUNNER mk1 2

Assembly instructions PRORUNNER mk1 2 Assembly instructions PRORUNNER mk1 Version 0.1 / 01-JUN-2013 Copyright Qimarox B.V. All rights reserved. No part of this document may be copied, stored in a database and/or published by means of printing,

More information

OptiCenter (OC01/OC02)

OptiCenter (OC01/OC02) 1 OptiCenter OC01/02 Tender Document 1 OptiCenter (OC01/OC02) Your powder management solution presents a new generation of powder management systems: the new OptiCenterO1/O2. It is clean, it is quick,

More information

EPS 16 ATEX 1121 X, IECEx EPS X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx. Operating Instructions

EPS 16 ATEX 1121 X, IECEx EPS X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx. Operating Instructions , IECEx EPS 16.0053X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx Device with II 2G/D Ex approval Geräte mit II 2G/D Ex Zulassung Appareils avec mode de protection II 2G/D Ex

More information

Gema Application Labs

Gema Application Labs Gema Application Labs Gema s worldwide Application Labs As an Application Expert Gema offers it s worldwide customers 4 professional application labs, where customer-specific coating trials are carried

More information

HV Angle valve (Series 264) HV Inline valve (Series 265) with pneumatic actuator, single acting with closing spring (NC)

HV Angle valve (Series 264) HV Inline valve (Series 265) with pneumatic actuator, single acting with closing spring (NC) HV Angle valve (Series 64) HV Inline valve (Series 65) with pneumatic actuator, single acting with closing spring (NC) This manual is valid for the valve ordering number(s): 64 65 The fabrication number

More information

Installation, Operating & Maintenance Instructions. Hot surfaces; do not touch!

Installation, Operating & Maintenance Instructions. Hot surfaces; do not touch! HV Angle valve (Series 263/265) with manual actuator This manual is valid for the valve ordering number(s): 263/26540-QA/H/E01 263/26544-QA/H/E01 The fabrication number is indicated on each product as

More information

HV-Angle Valve (Series 264) HV-InlineValve (Series 265) with electromagnetic actuator single acting with closing spring (NC)

HV-Angle Valve (Series 264) HV-InlineValve (Series 265) with electromagnetic actuator single acting with closing spring (NC) HV-Angle Valve (Series 264) HV-InlineValve (Series 265) with electromagnetic actuator single acting with closing spring (NC) This manual is valid for the valve ordering number(s): 26... 26428 -K A 61 A..

More information

Original Operating Manual

Original Operating Manual 2010-10-29 Original Operating Manual Control Panel Comfort for Pedelecs Series 4313 Save for future use! Marquardt GmbH Schlossstraße 16 78604 Rietheim-Weilheim E-mail: marquardt@marquardt.de Website:

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions contain

More information

SENTRY ISOBUS Tip Flow Monitor. Software Version 1.00

SENTRY ISOBUS Tip Flow Monitor. Software Version 1.00 SENTRY 6141 U S E R M A N U A L ISOBUS Tip Flow Monitor Software Version 1.00 Copyrights 2016 TeeJet Technologies. All rights reserved. No part of this document or the computer programs described in it

More information

Metallic Nozzle Convertion Kit - PG 1 to PG 1-M

Metallic Nozzle Convertion Kit - PG 1 to PG 1-M E Operating instructions and Spare Parts List Metallic Nozzle Convertion Kit - PG 1 to PG 1-M An ITW Company 1 Table of Contents Metallic Convertion Kit for the PG 1 Manual Powder Gun......................

More information

Operating Instructions Type MPT 53

Operating Instructions  Type MPT 53 Operating Instructions www.turnstiles.us Type MPT 53 Contents 1. Delivery... 2 2. Safety...3-4 3 Description and operation... 5 4. Technical Data 6 5. oundation...6-9 6. Assembly and installation...10-13

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating Instructions... 2 2 Authorized use...

More information

Operating instructions and spare parts list. ZA06 Reciprocator

Operating instructions and spare parts list. ZA06 Reciprocator En Operating instructions and spare parts list ZA06 Reciprocator Documentation ZA06 Reciprocator Copyright 2006 ITW Gema GmbH All rights reserved. This publication is protected by copyright. Unauthorized

More information

VAPORIX-PCM. Technical Documentation. Corrective control module for connection to VAPORIX-Control. Version: 3 Edition: Art.

VAPORIX-PCM. Technical Documentation. Corrective control module for connection to VAPORIX-Control. Version: 3 Edition: Art. Technical Documentation VAPORIX-PCM Corrective control module for connection to VAPORIX-Control Version: 3 Edition: 2016-08 Art. No: 350102 FAFNIR GmbH Schnackenburgallee 149 c 22525 Hamburg, Germany Tel.:

More information

FL 10 DIAPHRAGM PUMP INSTALLATION INSTRUCTIONS. Before operating the pump, please read the Installation Instructions and safety precautions.

FL 10 DIAPHRAGM PUMP INSTALLATION INSTRUCTIONS. Before operating the pump, please read the Installation Instructions and safety precautions. FL 10 INSTALLATION INSTRUCTIONS DIAPHRAGM PUMP FL 10 DC-P FL 10 AC Before operating the pump, please read the Installation Instructions and safety precautions. Installation Instructions FL 10 Table of

More information

Prodigy HDLV Pump Manifold and Circuit Board

Prodigy HDLV Pump Manifold and Circuit Board Prodigy HDLV Pump Manifold and Circuit Board Customer Product Manual Issued 05/08 For parts and technical support, call the Finishing Customer Support Center at (800) 433-939. This document is available

More information

FF 20 DIAPHRAGM PUMP INSTALLATION INSTRUCTIONS

FF 20 DIAPHRAGM PUMP INSTALLATION INSTRUCTIONS FF 20 INSTALLATION INSTRUCTIONS DIAPHRAGM PUMP FF 20 DCB-4 FF 20 DC-M Before operating the pump and the accessories, please read the Installation Instructions and safety precautions. Installation Instructions

More information

SPARK PLUG CLEANING KIT OPERATING MANUAL

SPARK PLUG CLEANING KIT OPERATING MANUAL SPARK PLUG CLEANING KIT OPERATING MANUAL Spark Plugs - Tools & Accessories P/N 01.20.002 Rev. 08/2015 Copyright Copyright 2015 MOTORTECH GmbH. All rights reserved. Distribution and reproduction of this

More information